Kwadrato Gdańsk

This city's sales in the register end on 05.02.2026: the city publishes them late, so prices lag the market by several months.

Address · 80-748 · Śródmieście

Chmielna 3 sale prices and the building's surroundings

Check a listing
Typical price here
15,120 zł/m²
middle 50% of sales: 12,150 – 21,785 zł/m²
452 sales over 24 months · Radius 300 m
Typical flat 37.5 m² ≈ 566,320 zł
≈ 2,710 zł per month with a 20% down payment and a 30-year mortgage
Compared with the city+23.6%
Change over the year+15.2%
Typical flat37.5 m²

The building has only 3 sales in 24 months — showing the nearest area with at least 20 sales.

Location

Pros

  • 6 min to the centre on foot
  • separate cycle track 4 min away
  • bike-share station 3 min away
  • grocery shops within 500 m: 23
  • primary school 6 min away, exam 79%

Things to watch out for

  • moderate noise from roads (60+ dB)
  • flood zone 36 m away
Transport8/10
good
6 min to the centre; rush-hour departures nearby: 198
Shops nearby9/10
excellent
within 500 m grocery shops: 23, pharmacies: 4; doctors within 1 km: 13
Schools and kindergartens10/10
excellent
school 6 min away (exam 79%); kindergartens within 1 km: 11
Quiet5/10
average
60+ dB from roads — moderate
Green space4/10
weak
8% green space within 500 m, park 6 min away
Low risk8/10
good
outside flood zones
On the map:

Risks

  • noise from roads 60+ dB — below the Polish limit of 68 dB, but above the WHO recommendation of 53 dB
  • outside ISOK flood zones (nearest: 36 m)
  • NO₂ 15.1 µg/m³ per year — below the 2030 EU limit (20)
  • PM2.5 dust 14.2 µg/m³ a year — within the Polish limit of 20, but above the EU limit from 2030 (10)
  • no plants with a risk of a major accident (SEVESO) within 2 km
  • no plants of the PRTR pollutant register within 1 km

Sources: the city's strategic noise map, ISOK flood maps (Wody Polskie), EEA annual air quality model (1 km), SEVESO and PRTR registers (GIOŚ). The maps are a general guide, not a verdict on an individual building.

What may be built nearby

  • A local zoning plan (MPZP) is in force №L/1117/14 «MPZP Wyspa Spichrzów rejon ulicy Stągiewnej i ulicy Pożarniczej w mieście Gdańsku» — what can be built nearby is already set.
  • Allowed by the plan within 150 m: blocks of flats (0 m); streets and roads (11 m); services: shops, offices, venues (103 m).
  • City general plan (POG) for this place: mixed zone with blocks of flats — draft (not in force yet), height up to 31 m, building coverage up to 100%, intensity up to 5.5.
  • 929 m away — a place where the city allows a high-rise: buildings next door may grow tall.
  • Building permits within 500 m in the last 3 years (GUNB): 1 — services and offices 1.
    • hotel or dormitory, new building · 336 m · permit 23.06.2026
      BUDOWA BUDYNKU HOTELOWO-USŁUGOWEGO WRAZ Z PROJEKTEM ZAGOSPODAROWANIA TERENU I NIEZBĘDNĄ INFRASTRUKTURĄ TECHNICZNĄ I DROGOWĄ
All land uses within 150 m
  • blocks of flats · 0 m
  • streets and roads · 11 m
  • services: shops, offices, venues · 103 m
  • water bodies · 109 m

What buying will cost

For a typical flat here — 566,320 zł, 37.5 m², 80% mortgage over 30 years at 5.98%.

Cash up front128,760 zł
Monthly payment2,710 zł
Taxes and notary15,497 zł

Calculate for your situation →

Why the price is what it is here

What affects the price here

How we calculate this

District Śródmieście: similar flats here are on average pricier by 38.2% compared with the city average.

Road noise · 60+ dB-0.6%
Green space nearby · 8%-0.2%

Effect on the price per m² compared with similar flats in the same district, based on 2022–2026 sales. These are statistical links, not a guarantee for a specific flat.

Developer prices nearby
DevelopmentDistanceFlatsMedian zł/m²Change
Toruńska 14B
TORUŃSKA Spółka z ograniczoną odpowiedzialnością Sp.K.
822 m4422,326—
Stara Stocznia 20
Invest Komfort Spółka Akcyjna Sp.K.
823 m121,613—
Stępkarska 9C
Invest Komfort Spółka Akcyjna Sp.K.
825 m1725,938—
Stępkarska 9D
Invest Komfort Spółka Akcyjna Sp.K.
831 m1623,632—
Mieszkanie A5
P.B. GÓRSKI sp. z o.o. S.K.A.
869 m316,821+91%
Stępkarska 9A
Invest Komfort Spółka Akcyjna Sp.K.
874 m2325,006—
Stępkarska 9B
Invest Komfort Spółka Akcyjna Sp.K.
886 m1424,511—
Jarmułżnicza 2
GGI Dolne Miasto
889 m4621,2500%

Asking prices from daily price lists (dane.gov.pl), 1.5 km radius.

What to check yourself before buying
  • Land and mortgage register (KW) — owner, mortgages, encumbrances: free of charge at ekw.ms.gov.pl.
  • Type of ownership — full ownership or cooperative right; share of the land in perpetual usufruct (annual fee).
  • Fees — fees to the owners' association, repair fund, any arrears of the previous owner.
  • Building — year built, condition of the roof and façade, planned repairs (owners' association minutes).
  • Flat — which way the windows face, ventilation, damp, window frames, heating.
  • For a new build — information prospectus, building permit, escrow bank account.
Location in detail: stops, schools, green space, sun

Location card

from the address

Transport

6 min to the centre at 7:45 on a weekday — on foot

  • Żuraw 01 · 197 m · 4 departures 7–9 am
    100
  • Targ Chlebowy 01 · 373 m · 4 departures 7–9 am
    100
  • Długie Ogrody 02 · 382 m · 10 departures 7–9 am
    N9106111138N78
  • Długie Ogrody 01 · 387 m · 10 departures 7–9 am
    N9106111N78
  • Chmielna 03 · 414 m · 19 departures 7–9 am
    N8112138166178186212
Time to other districts at 7:45: 9 of 35 within 30 min
Śródmieście — your district5 min
Przeróbka20 min
Rudniki22 min
Stogi26 min
Młyniska27 min
Aniołki28 min
Chełm29 min
Orunia-Św. Wojciech-Lipce29 min
Olszynka30 min
Siedlce31 min
Wzgórze Mickiewicza33 min
Wrzeszcz Dolny34 min
Suchanino35 min
Zaspa Młyniec36 min
Krakowiec-Górki Zachodnie37 min
Wrzeszcz Górny37 min
Letnica39 min
Orunia Górna-Gdańsk Południe39 min
Strzyża41 min
Nowy Port42 min
Oliwa42 min
Przymorze Małe42 min
Zaspa Rozstaje43 min
Brzeźno44 min
Piecki-Migowo44 min
Przymorze Wielkie46 min
Ujeścisko-Łostowice46 min
VII Dwór49 min
Żabianka-Wejhera-Jelitkowo-Tysiąclecia50 min
Jasień51 min
Brętowo58 min
Wyspa Sobieszewska58 min
Kokoszki66 min
Matarnia74 min
Osowa87 min

By public transport and on foot to where most of the district's addresses are; a weekday, by the timetable.

Schools and kindergartens

GDAŃSKA SZKOŁA PODSTAWOWA "LINGWISTA" IM. ZJEDNOCZONEJ EUROPprivate342 m79.3%
SZKOŁA PODSTAWOWA NR 50 IM. E.PLATER W GDAŃSKU448 m64.2%
SZKOŁA PODSTAWOWA NR 4 IM. KRÓLA KAZIMIERZA JAGIELLOŃCZYKA W457 m56.4%
SZKOŁA PODSTAWOWA SPECJALNA NR 26681 m—

The last column is the average 8th-grade exam result (Polish, maths, English), CKE. The city does not publish the school catchment area for each address — check at www.gdansk.pl/edukacja.

Kindergartens within 1 km: 11 (public: 6) · nearest: 5 min walk

Nearby

Grocery shops23 within 500 mnearest: 1 min walk
Pharmacies4 within 500 mnearest: 5 min walk
Doctors, clinics13 within 1 kmnearest: 6 min walk
Playgrounds13 within 500 mnearest: 5 min walk
Cafés and restaurants134 within 500 mnearest: 1 min walk
City bike hire16 within 500 mnearest: 3 min walk
Gyms3 within 1 kmnearest: 17 min walk
Park & Ride0 within 2 km
EV chargers0 within 1 km

Green space, noise, air

8% of the area within 500 m — parks, forests, lawns

Nearest green area: 3 min walk · park «Park im. Św. Barbary» — 318 m

Noise: roads60+ dB · moderate
Noise: tramsquiet (below 55 dB)
Noise: railwayquiet (below 55 dB)
Noise: airportquiet (below 55 dB)
Noise: industryquiet (below 55 dB)

Strategic noise map, LDWN (24 h). Limit for blocks of flats: 68 dB from roads, trams and railways (70 dB in a big city's centre zone), 60 dB from aircraft, 55 dB from industry. WHO recommends up to 53 dB from roads.

Loading air quality…

Risks and restrictions

Flood once in 10 yearsno, zone at 36 m
Flood once in 100 yearsno, zone at 36 m
Flood once in 500 yearsno, zone at 36 m
Flood if a levee breaksno
Paid parkingŚródmiejska Strefa Płatnego Parkowania - Sektor FDO (Długie Ogrody)

Flood zones — ISOK (Wody Polskie); 1 cell ≈ 7 m. Being in the Q1% zone affects insurance and mortgages.

What may be built nearby

Local zoning plan (MPZP)№L/1117/14 MPZP Wyspa Spichrzów rejon ulicy Stągiewnej i ulicy Pożarniczej w mieście Gdańsku · resolution
Land use within 150 m
001-M/U31 zabudowa mieszkaniowo-usługowa
004-KD80 ulice dojazdowe · 11 m
002-KX ciąg pieszy, pieszo-jezdny, pieszo-rowerowy, rowerowy · 32 m
017-33 wody powierzchniowe śródlądowe · 103 m
038-03 wody powierzchniowe morskie · 109 m
018-81 ulice lokalne · 126 m
001-U33 zabudowa usługowa komercyjna i publiczna · 145 m
City general plan (POG)1308SW strefa wielofunkcyjna z zabudową mieszkaniową wielorodzinną
draft (not in force yet), height up to 31 m, building coverage up to 100%, intensity up to 5.5

MW — blocks of flats, MN — houses, U — services, ZP — parks, KD — roads.

Sun

Calculating…

Sources: GTFS, OpenStreetMap, city GIS, ISOK, GIOŚ, RSPO, CKE, GUGiK. Source status

Sales, charts and filters (790 sales)

Area: Radius 300 m · 790 sales with filters applied

Market
Rooms
Area, m²
Floor
Period
Median, 12 mo.
14,148 zł/m²
347 sales
Difference from the city, 12 mo.
+11.8%
city: 12,651 zł/m²
Difference from the district
-12.1%
Śródmieście: 16,092 zł/m²
Change over the year
+15.2%
prices within the same market (new builds with new builds)
Median price
579,613 zł
area 36 m²
All time
13,949 zł/m²
790 sales · primary market 64.6%
Company buyers
8.4%
share of sales in 12 mo.

Median price per m² by quarter

The band is the middle 50% of sales in the area. Quarters with fewer than 3 sales in the area are skipped. The last quarter is incomplete.

Distribution of price per m²

8,000–10,000 zł/m²: 75 sales10,000–12,000 zł/m²: 243 sales12,000–14,000 zł/m²: 83 sales14,000–16,000 zł/m²: 114 sales16,000–18,000 zł/m²: 71 sales18,000–20,000 zł/m²: 45 sales20,000–22,000 zł/m²: 44 sales22,000–24,000 zł/m²: 33 sales24,000–26,000 zł/m²: 33 sales26,000–28,000 zł/m²: 25 sales28,000–30,000 zł/m²: 10 sales30,000–32,000 zł/m²: 5 sales32,000–34,000 zł/m²: 9 sales810121416182022242628303234

area median 13,949 zł/m² city median 12,651 zł/m² · k zł/m², 790 sales

Resales

43 sales — flats sold twice. Median price change +56.4% over a median of 6.7 mo. between deeds.

The first price mostly comes from the developer's handover deed and was agreed 1–3 years earlier, so the difference shows growth over a longer period.

AddressAreaBoughtPriceSoldPriceDifference
Chmielna 11135.312.06.2025514,67429.12.20251,000,000+94.3%
Szafarnia 1159.128.06.2023950,00016.12.20251,360,000+43.2%
Chmielna 11048.406.11.2025622,17011.12.20251,175,000+88.9%
Chmielna 11028.910.06.2025337,44002.12.2025640,000+89.7%
Chmielna 11037.423.05.2025435,76719.11.20251,070,000+145.5%
Mariacka 44/4537.828.06.2024770,00004.11.20251,010,000+31.2%
Św. Barbary 1163.701.07.2025554,53804.11.20251,098,000+98%
Chmielna 11036.126.05.2025401,13129.10.2025883,306+120.2%
Angielska Grobla 580.305.01.2023815,16524.10.20251,950,000+139.2%
Chmielna 10925.303.04.2025355,77411.10.2025600,000+68.6%
Tandeta 136.131.10.2023900,00001.10.2025839,000-6.8%
Chmielna 10937.921.02.2025923,91316.09.20251,200,000+29.9%
Angielska Grobla 543.511.05.2023504,67526.08.2025900,000+78.3%
Chmielna 11031.526.05.2025473,32825.08.20251,100,000+132.4%
Chmielna 10927.524.03.2025717,12022.07.2025755,000+5.3%
Chmielna 1103411.06.2025395,52618.07.2025761,376+92.5%
Długi Targ 17/182920.04.2023635,00022.05.2025710,000+11.8%
Św. Barbary 125925.09.2024800,00007.03.20251,200,000+50%
Chmielna 10926.819.12.2024368,89827.02.2025716,040+94.1%
Chmielna 10941.119.12.2024577,18425.02.2025700,000+21.3%
Św. Barbary 1234.711.12.2024619,90014.02.2025684,900+10.5%
Długi Targ 22/2326.225.05.2023575,00005.11.2024620,000+7.8%
Angielska Grobla 553.802.02.2024629,46002.10.20241,160,000+84.3%
Chmielna 36221.03.20231,234,61527.09.20241,672,920+35.5%
Św. Barbary 1130.927.06.2023600,00024.09.2024710,000+18.3%
Angielska Grobla 543.211.05.2023458,13227.08.2024880,000+92.1%
Św. Barbary 1238.716.01.2024620,00006.08.2024850,000+37.1%
Mariacka 44/4537.830.09.2022600,00028.06.2024770,000+28.3%
Chmielna 358.919.12.20231,144,43321.06.20241,790,000+56.4%
Angielska Grobla 544.821.04.2023483,51607.06.2024870,000+79.9%
Mariacka 28/3048.408.12.2023740,00015.05.20241,270,000+71.6%
Angielska Grobla 5103.709.05.20231,028,08326.04.20242,179,000+111.9%
Angielska Grobla 545.816.06.2023494,31615.03.2024668,000+35.1%
Angielska Grobla 562.903.04.2023591,63629.01.2024591,000-0.1%
Angielska Grobla 569.216.01.2023659,66011.01.20241,450,000+119.8%
Angielska Grobla 594.610.05.20231,068,41530.11.20231,655,000+54.9%
Angielska Grobla 594.610.05.20231,068,53730.11.20231,655,000+54.9%
Angielska Grobla 563.812.05.2023614,65228.11.2023970,000+57.8%
Angielska Grobla 586.205.04.2023861,60006.09.20231,445,877+67.8%
Chlebnicka 9/1033.407.07.2022500,00019.06.2023775,000+55%
Długi Targ 17/182917.08.2022426,00020.04.2023635,000+49.1%
Angielska Grobla 572.716.12.2022727,82027.02.2023860,000+18.2%
Angielska Grobla 590.905.12.20221,200,08506.02.20231,892,000+57.7%

Sales (790)

CSV
DateAddressFloorRoomsAreaPricezł/m²Market
16.01.2026Tandeta 14239.6900,00022,727resale
29.12.2025Chmielna 1115—35.31,000,00028,329resale
19.12.2025Św. Barbary 121240.3835,00020,704resale
16.12.2025Szafarnia 114259.11,360,00022,996resale
11.12.2025Chmielna 1107—48.41,175,00024,262resale
04.12.2025Tandeta 14244.4985,00022,185resale
03.12.2025Chmielna 1095—40.21,016,17525,272resale
02.12.2025Chmielna 1103—28.9640,00022,122resale
01.12.2025Chmielna 1092—40950,00023,768resale
28.11.2025Dziana 5/7a2235690,00019,714resale
27.11.2025Chmielna 1102—30.41,040,00034,267resale
27.11.2025Chmielna 1104—33.9373,11211,016new
27.11.2025Chmielna 1114—36.2504,89613,932new
19.11.2025Chmielna 1105—37.41,070,00028,640resale
17.11.2025Chmielna 1097—26.8795,15029,692resale
14.11.2025Św. Ducha 119/1213237.7670,00017,772resale
13.11.2025Chmielna 1093—27.1776,25028,602resale
13.11.2025Chmielna 1094—27.2776,25028,570resale
07.11.2025Szeroka 50/513347.9606,00012,651resale
06.11.2025Chmielna 1107—48.7634,86013,028new
06.11.2025Chmielna 1107—48.4622,17012,847new
04.11.2025Mariacka 44/454—37.81,010,00026,734resale
04.11.2025Św. Barbary 115463.71,098,00017,226resale
29.10.2025Chmielna 1102—36.1883,30624,495resale
27.10.2025Angielska Grobla 53376.3736,3429,647new
24.10.2025Angielska Grobla 56480.31,950,00024,275resale
20.10.2025Chmielna 1093—37.5920,00024,560resale
16.10.2025Angielska Grobla 56374.2757,74510,205new
16.10.2025Chmielna 1103—27.8291,54710,476new
13.10.2025Ołowianka 1B2343.5799,00018,372resale
11.10.2025Chmielna 1094—25.3600,00023,678resale
08.10.2025Chmielna 1103—38.5545,40514,148new
08.10.2025Chmielna 1097—47.81,215,00025,445resale
06.10.2025Chmielna 1094—40.11,059,30026,397resale
02.10.2025Angielska Grobla 55361.2638,04310,422new
01.10.2025Tandeta 12136.1839,00023,241resale
26.09.2025Szafarnia 113260.91,425,00023,384resale
25.09.2025Chmielna 1094—37.7978,31025,964resale
24.09.2025Szafarnia 52267.21,370,00020,387resale
24.09.2025Mariacka 42/432229.7650,00021,878resale
19.09.2025Chmielna 1093—41.5950,00022,903resale
18.09.2025Chmielna 1107—53.4623,09111,664new
18.09.2025Chmielna 1124—35.1371,92210,584new
16.09.2025Chmielna 1095—37.91,200,00031,662resale
12.09.2025Szeroka 61/632124.8445,00017,944resale
10.09.2025Długi Targ 22/235353.4760,00014,232resale
10.09.2025Chmielna 1105—31.2489,21815,660new
10.09.2025Chmielna 1102—31408,19213,176new
09.09.2025Chmielna 1127—95.41,254,40913,142new
09.09.2025Chmielna 1106—32.2391,59512,150new
09.09.2025Chmielna 1116—44.4539,58212,150new
08.09.2025Angielska Grobla 51241406,1659,919new
01.09.2025Chmielna 1103—32.7342,35610,476new
29.08.2025Chmielna 1104—35.1409,05611,664new
28.08.2025Chmielna 1106—34.2415,65212,150new
28.08.2025Chmielna 1107—49.1874,42717,820new
27.08.2025Chmielna 1095—27.1814,00029,993resale
26.08.2025Angielska Grobla 52243.5900,00020,713resale
26.08.2025Chmielna 1103—36509,89414,148new
26.08.2025Chmielna 1097—35.7960,00026,883resale
26.08.2025Chmielna 1107—42.3495,11311,696new
25.08.2025Chmielna 1104—31.51,100,00034,887resale
25.08.2025Chmielna 1105—27305,84011,340new
21.08.2025Chmielna 1103—26.4307,93011,664new
19.08.2025Chmielna 1104—38.7543,06714,040new
18.08.2025Chmielna 1107—29.2428,44914,688new
14.08.2025Chmielna 1097—40.2948,00023,553resale
13.08.2025Chmielna 1093—36840,00023,353resale
13.08.2025Chmielna 1102—31.6368,69911,664new
13.08.2025Chmielna 1092—26.6837,50031,438new
13.08.2025Chmielna 1102—35.2410,22311,664new
12.08.2025Chmielna 1104—31465,22215,012new
11.08.2025Chmielna 1105—27.9316,27311,340new
11.08.2025Chmielna 1105—35397,01311,340new
08.08.2025Chmielna 1095—41.91,046,50224,976resale
08.08.2025Chmielna 1107—32.3415,12012,852new
08.08.2025Chlebnicka 17/181—32495,00015,469resale
07.08.2025Św. Barbary 127252.41,209,90023,076resale
07.08.2025Chmielna 1106—36563,13415,660new
07.08.2025Chmielna 1127—33.3449,41513,500new
05.08.2025Chmielna 1094—36924,16025,700resale
05.08.2025Św. Barbary 111369.81,220,00017,491resale
04.08.2025Chmielna 1102—33.3388,17811,664new
04.08.2025Chmielna 1107—26.8312,24511,664new
04.08.2025Chmielna 1107—32373,36511,664new
01.08.2025Chmielna 1094—41.8999,90023,904resale
30.07.2025Chmielna 1095—27.2720,00026,432resale
30.07.2025Chmielna 1114—41.8460,24811,016new
28.07.2025Chmielna 1094—34.5850,00024,652resale
25.07.2025Chmielna 1106—28.9337,20611,664new
25.07.2025Chmielna 1097—35.7909,61925,487resale
25.07.2025Chmielna 1106—32.7395,29712,096new
25.07.2025Chmielna 1127—88.71,146,44212,923new
24.07.2025Chmielna 1103—30.9437,31514,148new
24.07.2025Chmielna 1092—27.3952,97534,882resale
23.07.2025Chmielna 1125—35.1399,92911,394new
23.07.2025Mariacka 14/152—41995,00024,262resale
22.07.2025Chmielna 1126—35.8435,33512,150new
22.07.2025Chmielna 1126—35.1426,22212,150new
22.07.2025Chmielna 1103—31.5445,94514,148new
22.07.2025Chmielna 1103—38.9432,83511,124new
22.07.2025Chmielna 1104—34395,99311,664new
22.07.2025Chmielna 1094—27.5755,00027,475resale
22.07.2025Chmielna 1104—31.9353,57611,070new
21.07.2025Chmielna 1107—56.3973,55517,280new
18.07.2025Szafarnia 72376.51,480,00019,346resale
18.07.2025Chmielna 1104—34761,37622,400resale
17.07.2025Chmielna 1093—27.1735,00027,152resale
17.07.2025Chmielna 1107—66.11,138,96817,231new
16.07.2025Chmielna 1124—72.1840,62411,664new
16.07.2025Chmielna 1102—26.3307,11311,664new
15.07.2025Chmielna 1102—42.2490,93811,647new
15.07.2025Chmielna 1102—26.9267,3789,936new
15.07.2025Chmielna 1102—27.9277,4139,936new
15.07.2025Chmielna 1102—26.9252,6589,396new
15.07.2025Chmielna 1102—32.5326,93210,044new
14.07.2025Chmielna 1107—25.4295,68211,664new
11.07.2025Chmielna 1105—26.4307,81311,664new
11.07.2025Św. Barbary 123133699,00021,169resale
10.07.2025Chmielna 1117—56.4910,92616,143new
10.07.2025Chmielna 1096—41.81,067,61025,535resale
10.07.2025Chmielna 1105—32.6369,45711,340new
10.07.2025Chmielna 1116—41.9515,50312,312new
09.07.2025Chmielna 1106—34.9406,95711,664new
09.07.2025Chmielna 1116—35.3564,87515,984new
09.07.2025Chmielna 1105—34.1397,85911,664new
09.07.2025Chmielna 1107—57.1767,88013,443new
09.07.2025Chmielna 1106—34.2398,32611,664new
09.07.2025Chmielna 1106—37.1432,26811,664new
09.07.2025Chmielna 1107—47.9642,87013,432new
09.07.2025Chmielna 1125—71.9775,98110,788new
08.07.2025Chmielna 1107—59.61,058,47617,766new
07.07.2025Chmielna 1105—29.3341,52211,664new
07.07.2025Chmielna 1103—35366,55510,476new
07.07.2025Chmielna 1106—28338,20412,096new
07.07.2025Chmielna 1106—26.4307,93011,664new
07.07.2025Chmielna 1104—28.9337,55611,664new
07.07.2025Chmielna 1106—35.2425,41612,096new
04.07.2025Św. Barbary 124362.91,059,80016,838resale
03.07.2025Chmielna 1104—29.2340,70511,664new
03.07.2025Chmielna 1104—34.9384,12811,016new
02.07.2025Św. Barbary 115370.21,190,00016,942resale
01.07.2025Św. Barbary 115463.7554,5388,700new
01.07.2025Chmielna 1096—36871,54924,190resale
30.06.2025Chmielna 1114—41.2453,30811,016new
30.06.2025Mariacka 21A——47.9900,00018,789resale
27.06.2025Chmielna 1107—85987,96711,626new
27.06.2025Chmielna 1103—40.7475,07511,664new
27.06.2025Chmielna 1103—34396,22611,664new
27.06.2025Chmielna 1096—41620,07115,120new
27.06.2025Chmielna 1095—41620,52515,120new
27.06.2025Chmielna 1097—39.4595,42615,120new
26.06.2025Chmielna 1116—41.4509,34712,312new
25.06.2025Św. Barbary 1132531,060,00020,000resale
24.06.2025Chmielna 1116—42.4515,16012,150new
24.06.2025Chmielna 1105—34.8405,44111,664new
24.06.2025Chmielna 1106—38.4600,87415,660new
24.06.2025Chmielna 1105—34397,15911,664new
24.06.2025Chmielna 1106—38.8471,90612,150new
23.06.2025Św. Ducha 992342.5950,00022,353resale
20.06.2025Chmielna 1097—29.7449,36615,120new
18.06.2025Chmielna 1117—35.7537,21415,056new
18.06.2025Chmielna 1104—28308,00711,016new
17.06.2025Chmielna 1115—44.5531,18211,934new
17.06.2025Chmielna 1117—29.6397,59813,446new
17.06.2025Chmielna 1117—49817,52216,674new
17.06.2025Chmielna 1103—32355,52311,124new
17.06.2025Chmielna 1117—39524,79713,446new
17.06.2025Chmielna 1114—42.6592,94613,932new
17.06.2025Chmielna 1126—37.2424,31311,394new
17.06.2025Chmielna 1127—56.6827,95414,631new
17.06.2025Chmielna 1126—41.6660,28315,876new
16.06.2025Chmielna 1117—53.1891,72616,787new
16.06.2025Chmielna 1107—28.6640,00022,346resale
16.06.2025Chmielna 1105—35.9539,53115,012new
16.06.2025Chmielna 1114—42.6455,47910,692new
16.06.2025Chmielna 1105—29338,13911,664new
16.06.2025Chmielna 1105—31464,62115,012new
16.06.2025Chmielna 1105—38.6579,61315,012new
13.06.2025Chmielna 1124—41.9588,55714,040new
12.06.2025Chmielna 1105—32.1363,78711,340new
12.06.2025Chmielna 1115—40.8594,13514,580new
12.06.2025Chmielna 1124—37372,03010,044new
12.06.2025Chmielna 1107—731,257,85417,236new
12.06.2025Chmielna 1105—34386,12711,340new
12.06.2025Chmielna 1115—41.2467,66211,340new
12.06.2025Chmielna 1125—70.7748,60610,584new
12.06.2025Chmielna 1125—35.8395,99311,077new
12.06.2025Chmielna 1124—70.7710,01010,044new
12.06.2025Chmielna 1125—41.7607,69414,580new
12.06.2025Chmielna 1125—64.8945,07614,580new
12.06.2025Chmielna 1104—32.7359,67211,016new
12.06.2025Chmielna 1126—64.81,015,08115,660new
12.06.2025Chmielna 1125—37.2393,83110,584new
12.06.2025Chmielna 1105—38.8439,87911,340new
12.06.2025Chmielna 1115—42475,82611,340new
12.06.2025Chmielna 1115—35.3514,67414,580new
12.06.2025Chmielna 1124—35.8394,26311,016new
12.06.2025Chmielna 1104—35.9504,17614,040new
12.06.2025Chmielna 1104—38.8431,61111,124new
12.06.2025Św. Ducha 685134.51,000,00028,952resale
12.06.2025Chmielna 1124—64.8902,09713,932new
11.06.2025Chmielna 1107—28.6326,12511,387new
11.06.2025Chmielna 1104—34395,52611,637new
10.06.2025Chmielna 1103—28.9337,44011,664new
10.06.2025Chmielna 1102—28.7334,29011,652new
06.06.2025Chmielna 1117—29.2467,37215,984new
05.06.2025Chmielna 1104—26.4307,81311,664new
05.06.2025Chmielna 1096—40.1971,37024,218resale
04.06.2025Chmielna 1106—31.1496,46315,984new
04.06.2025Chmielna 1115—42.7486,63811,394new
04.06.2025Chmielna 1106—31.9502,36815,768new
04.06.2025Chmielna 1107—33.1532,00216,092new
04.06.2025Chmielna 1107—30.6491,93216,092new
03.06.2025Chmielna 1097—56.31,444,21625,657resale
03.06.2025Chmielna 1096—37939,13625,382resale
30.05.2025Chmielna 1104—27297,43211,016new
30.05.2025Chmielna 1103—37.4436,11711,664new
30.05.2025Chmielna 1103—27282,01410,457new
29.05.2025Chmielna 1093—25.6768,45029,994resale
29.05.2025Chmielna 1127—29.8408,46213,716new
29.05.2025Chmielna 1103—29.3341,52211,664new
29.05.2025Chmielna 1106—29.3342,10511,664new
28.05.2025Chmielna 1096—130.83,246,57724,815new
28.05.2025Chmielna 1096—163.64,111,87625,128new
27.05.2025Chmielna 1126—72948,14513,176new
26.05.2025Chmielna 1102—36.1401,13111,124new
26.05.2025Chmielna 1102—33.1435,59913,176new
26.05.2025Chmielna 1104—31.5473,32815,012new
26.05.2025Chmielna 1102—35.9473,41413,176new
26.05.2025Chmielna 1102—30.4399,89213,176new
23.05.2025Chmielna 1105—37.4435,76711,664new
23.05.2025Chmielna 1104—37.5436,81611,664new
23.05.2025Chmielna 1103—34.8406,37411,664new
23.05.2025Chmielna 1102—38.8452,79611,664new
23.05.2025Chmielna 1106—34.1397,39211,664new
23.05.2025Chmielna 1107—93.21,355,03314,545new
23.05.2025Chmielna 1106—26.9325,14012,096new
22.05.2025Długi Targ 17/18ground floor129710,00024,483resale
21.05.2025Tandeta 13136.2845,00023,343resale
20.05.2025Chmielna 1107—80.41,056,37413,136new
15.05.2025Chmielna 37257.2927,45016,200resale
12.05.2025Chmielna 1127—541,865,35434,569resale
12.05.2025Chmielna 1127—64.82,167,33933,447resale
12.05.2025Angielska Grobla 52364.4598,7349,300new
06.05.2025Chmielna 1107—28.1449,47015,984new
06.05.2025Chmielna 1127—54909,11816,848new
06.05.2025Chmielna 1117—32.2538,35816,740new
06.05.2025Chmielna 1107—55.5883,87215,926new
06.05.2025Chmielna 1127—64.81,095,50916,906new
25.04.2025Chmielna 1096—37.7982,80026,048resale
25.04.2025Warzywnicza 10C1—51.4890,00017,315resale
25.04.2025Chmielna 1096—27.2725,76026,692resale
23.04.2025Chmielna 1093—34.5800,00023,195resale
23.04.2025Mariacka 4/53345900,00019,996resale
11.04.2025Chmielna 1095—35.9980,80027,343resale
10.04.2025Chmielna 1094—36.9899,82024,366resale
03.04.2025Chmielna 1094—25.3355,77414,040new
31.03.2025Chmielna 1097—63.5887,73813,989new
31.03.2025Chmielna 1093—40.8572,55114,040new
31.03.2025Chmielna 1097—32.5456,16014,040new
31.03.2025Chmielna 1096—38533,09914,040new
31.03.2025Chmielna 1096—29.9419,93614,040new
31.03.2025Chmielna 1092—37.7529,02714,040new
31.03.2025Chmielna 1092—36.2507,82714,040new
31.03.2025Chmielna 1095—26.4371,21814,040new
31.03.2025Chmielna 1095—37.8530,99314,040new
31.03.2025Chmielna 1092—31434,53814,040new
31.03.2025Chmielna 1093—31435,52114,040new
31.03.2025Chmielna 1096—25.1352,26414,040new
31.03.2025Chmielna 1093—37.6527,34214,040new
31.03.2025Chmielna 1092—30.1422,74414,040new
31.03.2025Chmielna 1093—35.8502,91314,040new
31.03.2025Chmielna 1097—43.7610,16813,966new
31.03.2025Chmielna 1097—46.2644,70613,970new
31.03.2025Chmielna 1092—25.3355,63314,040new
31.03.2025Chmielna 1097—24.4342,01414,040new
31.03.2025Chmielna 1095—36504,87814,040new
31.03.2025Chmielna 1093—30421,90214,040new
31.03.2025Chmielna 1096—26.1367,14614,040new
31.03.2025Chmielna 1096—35.9504,31714,040new
31.03.2025Chmielna 1096—31.2437,90814,040new
31.03.2025Chmielna 1092—26.1366,44414,040new
31.03.2025Chmielna 1097—44614,80113,966new
31.03.2025Chmielna 1095—31.1436,78414,040new
31.03.2025Chmielna 1093—25.9364,05714,040new
31.03.2025Chmielna 1097—27.1380,34414,040new
31.03.2025Chmielna 1096—26.6373,32414,040new
31.03.2025Chmielna 1092—26.2368,12914,040new
31.03.2025Chmielna 1092—37.5947,94925,285resale
31.03.2025Św. Barbary 121371.81,360,00018,934resale
31.03.2025Chmielna 1094—871,502,84217,280new
31.03.2025Chmielna 1095—25.1351,84214,040new
31.03.2025Chmielna 1093—26.1366,16314,040new
31.03.2025Chmielna 1096—40.9574,37614,040new
31.03.2025Chmielna 1093—25351,14014,040new
31.03.2025Chmielna 1092—40.1563,56614,040new
31.03.2025Chmielna 1097—31.1436,92514,040new
31.03.2025Chmielna 1095—26.1367,14614,040new
31.03.2025Chmielna 1095—30421,34014,040new

Showing 300 most recent. All 790 — in the CSV.

Data: Rejestr Cen Nieruchomości (GUGiK), PRG addresses, district boundaries from the city's open data or OpenStreetMap. Sales up to 05.02.2026; entries reach the register about 1.5 months after the sale on average, so the last ~3 months are incomplete. The price is the gross price from the notarial deed; only sales of whole flats on the open market are included.