This city's sales in the register end on 05.02.2026: the city publishes them late, so prices lag the market by several months.
Grudziądzka 8 sale prices and the building's surroundings
≈ 4,706 zł per month with a 20% down payment and a 30-year mortgage
The building has only 2 sales in 24 months — showing the nearest area with at least 20 sales.
Location
Pros
- tram 4 min away
- separate cycle track 4 min away
- bike-share station 3 min away
- quiet: noise below 55 dB
- grocery shops within 500 m: 9
Things to watch out for
No obvious drawbacks found.
Risks
- noise below 55 dB according to the noise map
- outside ISOK flood zones
- NO₂ 15 µg/m³ per year — below the 2030 EU limit (20)
- PM2.5 dust 14 µg/m³ a year — within the Polish limit of 20, but above the EU limit from 2030 (10)
- no plants with a risk of a major accident (SEVESO) within 2 km
- no plants of the PRTR pollutant register within 1 km
Sources: the city's strategic noise map, ISOK flood maps (Wody Polskie), EEA annual air quality model (1 km), SEVESO and PRTR registers (GIOŚ). The maps are a general guide, not a verdict on an individual building.
What may be built nearby
- A local zoning plan (MPZP) is in force №XLI/1121/17 «MPZP Wrzeszcz Dolny rejon ulic Hallera i Grudziądzkiej w mieście Gdańsku» — what can be built nearby is already set.
- Allowed by the plan within 150 m: blocks of flats (0 m); streets and roads (110 m).
- City general plan (POG) for this place: mixed zone with blocks of flats — draft (not in force yet), height up to 26 m, building coverage up to 35%, intensity up to 2.5, biologically active area from 30%.
- Building permits within 500 m in the last 3 years (GUNB): 4 — housing 2, industry and warehouses 1, schools, hospitals, sport 1.
- block of flats, new building · 227 m · permit 23.09.2024ZESPÓŁ 3 BUDYNKÓW WIELORODZINNYCH Z HALA GARAŻOWA, USŁUGAMI W PARTERZE WRAZ Z ZAGOSPODAROWANIEM TERENU, UKŁADEM KOMUNIKACYJNYM ORAZ INFRASTR
- industry or warehouse, new building · 310 m · permit 08.10.2025Budowa dwunastu budynków gospodarczo – magazynowych na terenie sportowo – rekreacyjnym Gdańskiego Klubu Sportowego GEDANIA 1922
- school, kindergarten, culture or science, new building · 310 m · permit 19.12.2024BUDOWA OBIEKTU KONTENEROWEGO O FUNKCJI USŁUGOWEJ- BUDYNKU EDUKACYJNEGO (SZKOŁY PODSTAWOWEJ I ŚREDNIEJ)
- block of flats, new building · 477 m · permit 27.05.2025BUDOWA BUDYNKU WIELORODZINNEGO Z LOKALAMI USŁUGOWYMI W PARTERZE ORAZ PODZIEMNĄ HALĄ GARAŻOWĄ I NIEZBĘDNYMI URZĄDZENIAMI BUDOWLANYMI
- block of flats, new building · 227 m · permit 23.09.2024
All land uses within 150 m
- blocks of flats · 0 m
- streets and roads · 110 m
Why the price is what it is here
What affects the price here
How we calculate thisDistrict Wrzeszcz Dolny: similar flats here are on average pricier by 14.3% compared with the city average.
We found no particular factors here that noticeably change the price. Enter the area and floor in the listing check and we will add their effect.
Developer prices nearby
| Development | Distance | Flats | Median zł/m² | Change |
|---|---|---|---|---|
| Aleja Generała Józefa Hallera 122 art.Locum S.A | 542 m | 44 | 20,463 | -3% |
| Leszczyńskich Robyg Morenova Sp. Z o.o. | 651 m | 108 | 21,000 | -6.3% |
| Jana Pawła II Zaspa Project Sp. z o.o. | 1,048 m | 210 | 19,357 | +3.2% |
| al. Jana Pawła II INPRO S. A. | 1,191 m | 152 | 18,900 | -3.5% |
| Aleja gen. Józefa Hallera 238 Invest Komfort Spółka Akcyjna Sp.K. | 1,487 m | 1 | 30,006 | — |
Asking prices from daily price lists (dane.gov.pl), 1.5 km radius.
What to check yourself before buying
- Land and mortgage register (KW) — owner, mortgages, encumbrances: free of charge at ekw.ms.gov.pl.
- Type of ownership — full ownership or cooperative right; share of the land in perpetual usufruct (annual fee).
- Fees — fees to the owners' association, repair fund, any arrears of the previous owner.
- Building — year built, condition of the roof and façade, planned repairs (owners' association minutes).
- Flat — which way the windows face, ventilation, damp, window frames, heating.
- For a new build — information prospectus, building permit, escrow bank account.
Location in detail: stops, schools, green space, sun
Location card
from the addressTransport
32 min to the centre at 7:45 on a weekday
- Kolonia Uroda 02 · 185 m · 18 departures 7–9 am35
- Kolonia Uroda 01 · 203 m · 16 departures 7–9 am235
- Ciołkowskiego 01 · 242 m · 5 departures 7–9 amN6124
- Grudziądzka 01 · 337 m · 16 departures 7–9 am235
- Grudziądzka 04 · 346 m · 0 departures 7–9 amN1N6
Time to other districts at 7:45: 10 of 35 within 30 min
| Wrzeszcz Dolny — your district | 10 min |
| Zaspa Rozstaje | 11 min |
| Brzeźno | 14 min |
| Młyniska | 17 min |
| Zaspa Młyniec | 20 min |
| Przymorze Wielkie | 21 min |
| Nowy Port | 27 min |
| Aniołki | 28 min |
| Wrzeszcz Górny | 29 min |
| Żabianka-Wejhera-Jelitkowo-Tysiąclecia | 30 min |
| Letnica | 31 min |
| Przymorze Małe | 31 min |
| Strzyża | 31 min |
| Śródmieście | 33 min |
| Oliwa | 34 min |
| Orunia-Św. Wojciech-Lipce | 34 min |
| VII Dwór | 34 min |
| Siedlce | 36 min |
| Chełm | 39 min |
| Suchanino | 41 min |
| Wzgórze Mickiewicza | 43 min |
| Piecki-Migowo | 44 min |
| Brętowo | 46 min |
| Stogi | 49 min |
| Przeróbka | 50 min |
| Jasień | 51 min |
| Matarnia | 54 min |
| Ujeścisko-Łostowice | 56 min |
| Orunia Górna-Gdańsk Południe | 57 min |
| Osowa | 62 min |
| Rudniki | 62 min |
| Krakowiec-Górki Zachodnie | 64 min |
| Kokoszki | 66 min |
| Olszynka | 88 min |
| Wyspa Sobieszewska | 98 min |
By public transport and on foot to where most of the district's addresses are; a weekday, by the timetable.
Schools and kindergartens
| NIEPUBLICZNA SZKOŁA PODSTAWOWA MISTRZOSTWA SPORTOWEGO GDAŃSKprivate | 429 m | 67% |
|---|---|---|
| NIEPUBLICZNA SZKOŁA PODSTAWOWA "NASZA SZKOŁA"private | 562 m | 79.6% |
| SZKOŁA PODSTAWOWA NR 52 IM. TADEUSZA KOŚCIUSZKI W GDAŃSKU | 742 m | 63.7% |
| SZKOŁA PODSTAWOWA NR 48 IM. GEN. JÓZEFA HALLERA W GDAŃSKU | 789 m | 78.2% |
The last column is the average 8th-grade exam result (Polish, maths, English), CKE. The city does not publish the school catchment area for each address — check at www.gdansk.pl/edukacja.
Kindergartens within 1 km: 4 (public: 2) · nearest: 1 min walk
Nearby
| Grocery shops | 9 within 500 m | nearest: 2 min walk |
|---|---|---|
| Pharmacies | 0 within 500 m | nearest: 11 min walk |
| Doctors, clinics | 10 within 1 km | nearest: 2 min walk |
| Playgrounds | 11 within 500 m | nearest: 1 min walk |
| Cafés and restaurants | 4 within 500 m | nearest: 2 min walk |
| City bike hire | 4 within 500 m | nearest: 3 min walk |
| Gyms | 1 within 1 km | nearest: 12 min walk |
| Park & Ride | 0 within 2 km | |
| EV chargers | 0 within 1 km |
Green space, noise, air
16% of the area within 500 m — parks, forests, lawns
Nearest green area: 2 min walk · park «Park Millenium» — 304 m
| Noise: roads | quiet (below 55 dB) |
|---|---|
| Noise: trams | quiet (below 55 dB) |
| Noise: railway | quiet (below 55 dB) |
| Noise: airport | quiet (below 55 dB) |
| Noise: industry | quiet (below 55 dB) |
Strategic noise map, LDWN (24 h). Limit for blocks of flats: 68 dB from roads, trams and railways (70 dB in a big city's centre zone), 60 dB from aircraft, 55 dB from industry. WHO recommends up to 53 dB from roads.
Risks and restrictions
| Flood once in 10 years | no |
|---|---|
| Flood once in 100 years | no |
| Flood once in 500 years | no, zone at 150 m |
| Flood if a levee breaks | no |
| Paid parking | no |
Flood zones — ISOK (Wody Polskie); 1 cell ≈ 7 m. Being in the Q1% zone affects insurance and mortgages.
What may be built nearby
| Local zoning plan (MPZP) | №XLI/1121/17 MPZP Wrzeszcz Dolny rejon ulic Hallera i Grudziądzkiej w mieście Gdańsku · resolution |
|---|---|
| Land use within 150 m | 004-M/U32 zabudowa mieszkaniowo-usługowa 007-KD81 ulice lokalne · 110 m 006-KX ciąg pieszy, pieszo-jezdny, pieszo-rowerowy, rowerowy · 131 m 062-KD82 ulice zbiorcze · 137 m 008-KD80 ulice dojazdowe · 148 m |
| City general plan (POG) | 694SW strefa wielofunkcyjna z zabudową mieszkaniową wielorodzinną draft (not in force yet), height up to 26 m, building coverage up to 35%, intensity up to 2.5, biologically active area from 30% |
MW — blocks of flats, MN — houses, U — services, ZP — parks, KD — roads.
Sun
Sources: GTFS, OpenStreetMap, city GIS, ISOK, GIOŚ, RSPO, CKE, GUGiK. Source status
Sales, charts and filters (576 sales)
Area: Radius 300 m · 576 sales with filters applied
Median price per m² by quarter
The band is the middle 50% of sales in the area. Quarters with fewer than 3 sales in the area are skipped. The last quarter is incomplete.
Distribution of price per m²
area median 11,860 zł/m² city median 12,651 zł/m² · k zł/m², 576 sales
Resales
26 sales — flats sold twice. Median price change +66.2% over a median of 10.7 mo. between deeds.
The first price mostly comes from the developer's handover deed and was agreed 1–3 years earlier, so the difference shows growth over a longer period.
| Address | Area | Bought | Price | Sold | Price | Difference |
|---|---|---|---|---|---|---|
| Bolesława Chrobrego 79E | 68.4 | 06.12.2022 | 775,000 | 04.08.2025 | 1,075,000 | +38.7% |
| Bolesława Chrobrego 79A | 35.6 | 18.05.2023 | 466,335 | 01.07.2025 | 760,000 | +63% |
| Aleja gen. Józefa Hallera 130 | 86.5 | 12.04.2023 | 920,958 | 03.06.2025 | 2,000,000 | +117.2% |
| Bolesława Chrobrego 79D | 32.9 | 21.11.2022 | 390,713 | 29.05.2025 | 600,000 | +53.6% |
| Bolesława Chrobrego 79A | 41.1 | 24.05.2023 | 502,311 | 12.05.2025 | 840,000 | +67.2% |
| Bolesława Chrobrego 79D | 76.7 | 13.12.2022 | 768,196 | 10.04.2025 | 1,599,000 | +108.2% |
| Bolesława Chrobrego 79E | 63.3 | 21.11.2022 | 630,000 | 10.02.2025 | 900,000 | +42.9% |
| Bolesława Chrobrego 79E | 40.2 | 15.11.2022 | 398,221 | 15.01.2025 | 894,000 | +124.5% |
| Bolesława Chrobrego 79A | 72.1 | 14.04.2023 | 909,076 | 30.12.2024 | 1,570,000 | +72.7% |
| Bolesława Chrobrego 79C | 92.6 | 11.04.2023 | 1,086,183 | 08.11.2024 | 2,120,000 | +95.2% |
| Bolesława Chrobrego 79C | 58.3 | 03.04.2023 | 663,522 | 25.10.2024 | 1,150,000 | +73.3% |
| Aleja gen. Józefa Hallera 130 | 35.9 | 02.11.2023 | 750,000 | 02.09.2024 | 820,000 | +9.3% |
| Bolesława Chrobrego 79D | 73.9 | 19.12.2022 | 799,000 | 23.08.2024 | 1,331,500 | +66.6% |
| Grudziądzka 6A | 64.9 | 18.05.2023 | 1,050,000 | 03.04.2024 | 1,250,000 | +19% |
| Aleja gen. Józefa Hallera 130 | 40 | 28.03.2023 | 483,069 | 22.02.2024 | 785,000 | +62.5% |
| Bolesława Chrobrego 79B | 41.4 | 24.04.2023 | 579,360 | 07.02.2024 | 840,000 | +45% |
| Bolesława Chrobrego 79C | 40.8 | 09.05.2023 | 457,318 | 08.12.2023 | 845,000 | +84.8% |
| Aleja gen. Józefa Hallera 130 | 35.9 | 16.02.2023 | 434,758 | 02.11.2023 | 750,000 | +72.5% |
| Bolesława Chrobrego 79A | 29.9 | 26.04.2023 | 388,830 | 21.09.2023 | 560,000 | +44% |
| Bolesława Chrobrego 79E | 84.8 | 29.12.2022 | 845,000 | 11.09.2023 | 1,560,000 | +84.6% |
| Bolesława Chrobrego 79A | 41.2 | 05.07.2023 | 495,000 | 31.08.2023 | 832,500 | +68.2% |
| Bolesława Chrobrego 79D | 37.4 | 09.12.2022 | 397,575 | 04.08.2023 | 790,000 | +98.7% |
| Bolesława Chrobrego 79C | 44.8 | 24.03.2023 | 524,063 | 31.07.2023 | 820,000 | +56.5% |
| Bolesława Chrobrego 79D | 50.5 | 18.05.2023 | 495,000 | 11.07.2023 | 710,000 | +43.4% |
| Aleja gen. Józefa Hallera 130 | 42.4 | 17.02.2023 | 473,548 | 15.05.2023 | 785,000 | +65.8% |
| Bolesława Chrobrego 79D | 38.5 | 15.11.2022 | 399,569 | 15.02.2023 | 550,000 | +37.6% |
Sales (576)
CSV| Date | Address | Floor | Rooms | Area | Price | zł/m² | Market |
|---|---|---|---|---|---|---|---|
| 23.01.2026 | Grudziądzka 8 | 5 | 3 | 51.6 | 1,080,000 | 20,930 | resale |
| 15.01.2026 | Grudziądzka 10 | 11 | 2 | 32.3 | 695,000 | 21,517 | resale |
| 07.01.2026 | Aleja gen. Józefa Hallera 132 | 6 | 2 | 39.4 | 950,000 | 24,118 | resale |
| 18.12.2025 | Grudziądzka 6A | 8 | 2 | 39.9 | 700,000 | 17,557 | resale |
| 09.12.2025 | Aleja gen. Józefa Hallera 132 | 2 | 3 | 55.6 | 960,000 | 17,269 | resale |
| 21.11.2025 | Aleja gen. Józefa Hallera 134 | 4 | 1 | 28.4 | 645,000 | 22,735 | resale |
| 25.09.2025 | Grudziądzka 12 | 4 | 2 | 28.4 | 600,000 | 21,134 | resale |
| 26.08.2025 | Aleja gen. Józefa Hallera 132 | 5 | 3 | 47.2 | 880,000 | 18,636 | resale |
| 25.08.2025 | Grudziądzka 6A | 2 | 3 | 63.2 | 1,230,000 | 19,468 | resale |
| 18.08.2025 | Grudziądzka 4 | 3 | 2 | 40.9 | 920,000 | 22,483 | resale |
| 04.08.2025 | Bolesława Chrobrego 79E | 2 | 3 | 68.4 | 1,075,000 | 15,712 | resale |
| 01.07.2025 | Bolesława Chrobrego 79A | 3 | 1 | 35.6 | 760,000 | 21,330 | resale |
| 06.06.2025 | Aleja gen. Józefa Hallera 134 | 8 | 3 | 49.3 | 975,000 | 19,757 | resale |
| 03.06.2025 | Aleja gen. Józefa Hallera 130 | 1 | 4 | 86.5 | 2,000,000 | 23,113 | resale |
| 29.05.2025 | Bolesława Chrobrego 79D | 6 | 1 | 32.9 | 600,000 | 18,243 | resale |
| 21.05.2025 | Grudziądzka 10 | 8 | 3 | 49 | 870,000 | 17,748 | resale |
| 12.05.2025 | Bolesława Chrobrego 79A | 3 | 2 | 41.1 | 840,000 | 20,443 | resale |
| 09.05.2025 | Aleja gen. Józefa Hallera 134 | 7 | 3 | 49.3 | 1,000,000 | 20,263 | resale |
| 15.04.2025 | Grudziądzka 4 | 8 | 1 | 36.5 | 732,000 | 20,038 | resale |
| 14.04.2025 | Grudziądzka 6A | 8 | 3 | 79.4 | 1,382,000 | 17,414 | resale |
| 10.04.2025 | Bolesława Chrobrego 79D | 4 | 4 | 76.7 | 1,599,000 | 20,861 | resale |
| 31.03.2025 | Grudziądzka 12 | 9 | 3 | 50.2 | 920,000 | 18,319 | resale |
| 24.03.2025 | Grudziądzka 10 | 8 | 3 | 49.1 | 935,000 | 19,054 | resale |
| 19.03.2025 | Aleja gen. Józefa Hallera 134 | 3 | 1 | 31.8 | 695,000 | 21,855 | resale |
| 28.02.2025 | Grudziądzka 4 | 4 | 1 | 49 | 980,000 | 20,012 | resale |
| 13.02.2025 | Grudziądzka 6A | 6 | 3 | 67.2 | 1,345,000 | 20,003 | resale |
| 10.02.2025 | Bolesława Chrobrego 79E | 4 | 3 | 63.3 | 900,000 | 14,227 | resale |
| 07.02.2025 | Grudziądzka 6A | 1 | 2 | 39.8 | 730,000 | 18,360 | resale |
| 05.02.2025 | Grudziądzka 10 | 10 | 2 | 38.2 | 843,000 | 22,051 | resale |
| 29.01.2025 | Grudziądzka 8 | 6 | 5 | 96.6 | 2,120,000 | 21,958 | resale |
| 29.01.2025 | Grudziądzka 10 | 3 | 2 | 38.1 | 800,000 | 21,014 | resale |
| 16.01.2025 | Grudziądzka 6 | 6 | 3 | 73.5 | 1,500,000 | 20,408 | resale |
| 15.01.2025 | Bolesława Chrobrego 79E | 3 | 1 | 40.2 | 894,000 | 22,250 | resale |
| 15.01.2025 | Grudziądzka 12 | 7 | 2 | 33.2 | 705,000 | 21,248 | resale |
| 03.01.2025 | Grudziądzka 10 | 5 | 2 | 30.1 | 655,000 | 21,725 | resale |
| 03.01.2025 | Grudziądzka 10 | 10 | 2 | 43.1 | 919,000 | 21,303 | resale |
| 30.12.2024 | Bolesława Chrobrego 79A | 4 | 4 | 72.1 | 1,570,000 | 21,769 | resale |
| 20.12.2024 | Grudziądzka 6 | 3 | 2 | 39.6 | 795,000 | 20,096 | resale |
| 18.11.2024 | Grudziądzka 10 | 9 | 3 | 65.2 | 1,200,000 | 18,396 | resale |
| 13.11.2024 | Grudziądzka 6A | 2 | 2 | 39.7 | 830,000 | 20,891 | resale |
| 08.11.2024 | Bolesława Chrobrego 79C | 1 | 4 | 92.6 | 2,120,000 | 22,907 | resale |
| 28.10.2024 | Grudziądzka 6 | 1 | 3 | 68.2 | 1,310,000 | 19,197 | resale |
| 25.10.2024 | Bolesława Chrobrego 79C | 1 | 3 | 58.3 | 1,150,000 | 19,709 | resale |
| 10.10.2024 | Aleja gen. Józefa Hallera 132 | 2 | 1 | 38.2 | 765,000 | 20,000 | resale |
| 02.09.2024 | Aleja gen. Józefa Hallera 130 | 3 | 1 | 35.9 | 820,000 | 22,822 | resale |
| 27.08.2024 | Grudziądzka 6 | 5 | 3 | 55 | 1,115,000 | 20,269 | resale |
| 23.08.2024 | Bolesława Chrobrego 79D | 1 | 3 | 73.9 | 1,331,500 | 18,010 | resale |
| 22.08.2024 | Grudziądzka 6A | 7 | 4 | 76.5 | 1,400,000 | 18,298 | resale |
| 30.07.2024 | Aleja gen. Józefa Hallera 132 | 5 | 2 | 42.3 | 905,000 | 21,395 | resale |
| 28.06.2024 | Grudziądzka 12 | 8 | 3 | 75.7 | 1,310,000 | 17,301 | resale |
| 20.05.2024 | Grudziądzka 4 | 3 | 2 | 38.4 | 820,000 | 21,371 | resale |
| 06.05.2024 | Bolesława Chrobrego 79C | 3 | 4 | 92.7 | 1,037,544 | 11,197 | new |
| 25.04.2024 | Aleja gen. Józefa Hallera 132 | 7 | 3 | 78 | 1,330,000 | 17,060 | resale |
| 23.04.2024 | Aleja gen. Józefa Hallera 132 | 2 | 2 | 42.1 | 782,000 | 18,575 | resale |
| 19.04.2024 | Bolesława Chrobrego 79A | 2 | 4 | 71.9 | 880,000 | 12,236 | new |
| 05.04.2024 | Grudziądzka 12 | 5 | 3 | 75.5 | 1,374,000 | 18,189 | resale |
| 03.04.2024 | Grudziądzka 6A | 8 | 4 | 64.9 | 1,250,000 | 19,269 | resale |
| 03.04.2024 | Grudziądzka 4 | 4 | 1 | 36.8 | 745,000 | 20,239 | resale |
| 21.03.2024 | Grudziądzka 10 | 10 | 3 | 65.3 | 1,350,000 | 20,664 | resale |
| 04.03.2024 | Bolesława Chrobrego 79C | 4 | 1 | 35.5 | 442,399 | 12,458 | new |
| 01.03.2024 | Grudziądzka 6A | 7 | 2 | 39.7 | 856,000 | 21,545 | resale |
| 22.02.2024 | Aleja gen. Józefa Hallera 130 | 4 | 2 | 40 | 785,000 | 19,610 | resale |
| 22.02.2024 | Aleja gen. Józefa Hallera 134 | 5 | 4 | 72.9 | 1,350,000 | 18,521 | resale |
| 07.02.2024 | Bolesława Chrobrego 79B | 1 | 2 | 41.4 | 840,000 | 20,309 | resale |
| 30.01.2024 | Aleja gen. Józefa Hallera 132 | 6 | 2 | 30.1 | 675,000 | 22,455 | resale |
| 26.01.2024 | Aleja gen. Józefa Hallera 130 | 4 | 1 | 35.9 | 394,121 | 10,987 | new |
| 25.01.2024 | Aleja gen. Józefa Hallera 132 | 2 | 2 | 40.7 | 800,000 | 19,666 | resale |
| 12.01.2024 | Grudziądzka 6 | 2 | 2 | 39.6 | 869,000 | 21,967 | resale |
| 09.01.2024 | Aleja gen. Józefa Hallera 134 | 6 | 4 | 81.7 | 1,515,000 | 18,548 | resale |
| 05.01.2024 | Bolesława Chrobrego 79B | 1 | 3 | 58.5 | 762,784 | 13,037 | new |
| 05.01.2024 | Grudziądzka 6A | 6 | 2 | 39.8 | 700,000 | 17,606 | resale |
| 12.12.2023 | Aleja gen. Józefa Hallera 130 | 4 | 4 | 73.3 | 803,465 | 10,967 | new |
| 08.12.2023 | Bolesława Chrobrego 79C | 3 | 1 | 40.8 | 845,000 | 20,721 | resale |
| 07.12.2023 | Grudziądzka 4 | 5 | 3 | 60.2 | 980,000 | 16,284 | resale |
| 05.12.2023 | Bolesława Chrobrego 79A | 4 | 3 | 54.6 | 675,990 | 12,376 | new |
| 04.12.2023 | Bolesława Chrobrego 79A | 3 | 4 | 72.2 | 862,820 | 11,944 | new |
| 30.11.2023 | Bolesława Chrobrego 79A | 5 | 1 | 34 | 442,000 | 12,981 | new |
| 29.11.2023 | Bolesława Chrobrego 79A | 4 | 3 | 67.1 | 940,460 | 14,010 | new |
| 16.11.2023 | Aleja gen. Józefa Hallera 130 | 4 | 2 | 44.2 | 528,358 | 11,943 | new |
| 14.11.2023 | Aleja gen. Józefa Hallera 134 | 6 | 1 | 31.4 | 640,000 | 20,369 | resale |
| 13.11.2023 | Bolesława Chrobrego 79A | 4 | 1 | 34.1 | 423,756 | 12,441 | new |
| 07.11.2023 | Grudziądzka 6A | 7 | 3 | 58.5 | 1,150,000 | 19,648 | resale |
| 02.11.2023 | Aleja gen. Józefa Hallera 130 | 3 | 1 | 35.9 | 750,000 | 20,874 | resale |
| 27.10.2023 | Bolesława Chrobrego 79A | 4 | 2 | 41.8 | 517,276 | 12,384 | new |
| 23.10.2023 | Grudziądzka 4 | 3 | 2 | 40.9 | 775,000 | 18,953 | resale |
| 20.10.2023 | Bolesława Chrobrego 79A | 2 | 3 | 59.6 | 692,214 | 11,607 | new |
| 17.10.2023 | Bolesława Chrobrego 79C | 5 | 3 | 62.8 | 734,532 | 11,704 | new |
| 06.10.2023 | Aleja gen. Józefa Hallera 134 | 7 | 2 | 33.2 | 720,000 | 21,661 | resale |
| 06.10.2023 | Grudziądzka 12 | 10 | 3 | 50.2 | 895,000 | 17,825 | resale |
| 29.09.2023 | Bolesława Chrobrego 79B | 1 | 2 | 43.7 | 597,222 | 13,676 | new |
| 29.09.2023 | Bolesława Chrobrego 79A | 3 | 1 | 29.9 | 378,734 | 12,662 | new |
| 21.09.2023 | Bolesława Chrobrego 79A | 4 | 3 | 67.2 | 828,164 | 12,329 | new |
| 21.09.2023 | Bolesława Chrobrego 79A | 5 | 1 | 29.9 | 560,000 | 18,723 | resale |
| 15.09.2023 | Aleja gen. Józefa Hallera 132 | 8 | 2 | 38.5 | 710,000 | 18,446 | resale |
| 15.09.2023 | Grudziądzka 12 | 3 | 2 | 33.2 | 630,000 | 19,005 | resale |
| 14.09.2023 | Aleja gen. Józefa Hallera 130 | 5 | 1 | 35.9 | 419,766 | 11,683 | new |
| 11.09.2023 | Bolesława Chrobrego 79E | 3 | 5 | 84.8 | 1,560,000 | 18,401 | resale |
| 08.09.2023 | Aleja gen. Józefa Hallera 134 | 6 | 1 | 29.7 | 390,000 | 13,136 | resale |
| 07.09.2023 | Bolesława Chrobrego 79B | 2 | 4 | 69.1 | 868,994 | 12,572 | new |
| 06.09.2023 | Bolesława Chrobrego 79A | 2 | 2 | 37.9 | 506,462 | 13,360 | new |
| 06.09.2023 | Bolesława Chrobrego 79A | 3 | 1 | 33.5 | 424,368 | 12,649 | new |
| 04.09.2023 | Bolesława Chrobrego 79A | 5 | 1 | 35 | 471,632 | 13,471 | new |
| 01.09.2023 | Aleja gen. Józefa Hallera 132 | 6 | 2 | 50 | 975,000 | 19,492 | resale |
| 01.09.2023 | Bolesława Chrobrego 79A | 3 | 3 | 68.5 | 847,772 | 12,380 | new |
| 31.08.2023 | Bolesława Chrobrego 79A | 2 | 2 | 41.2 | 832,500 | 20,226 | resale |
| 29.08.2023 | Grudziądzka 4 | 2 | 1 | 36.8 | 697,000 | 18,920 | resale |
| 29.08.2023 | Bolesława Chrobrego 79A | 2 | 1 | 33.7 | 419,499 | 12,467 | new |
| 24.08.2023 | Bolesława Chrobrego 79A | 2 | 3 | 68.2 | 863,811 | 12,657 | new |
| 24.08.2023 | Bolesława Chrobrego 79A | 4 | 3 | 66.4 | 847,938 | 12,772 | new |
| 23.08.2023 | Bolesława Chrobrego 79A | 2 | 4 | 78 | 966,355 | 12,392 | new |
| 17.08.2023 | Aleja gen. Józefa Hallera 130 | 2 | 2 | 38.9 | 452,302 | 11,627 | new |
| 09.08.2023 | Grudziądzka 4 | 3 | 3 | 61.8 | 1,060,000 | 17,149 | resale |
| 08.08.2023 | Bolesława Chrobrego 79B | 2 | 2 | 43.8 | 582,601 | 13,311 | new |
| 08.08.2023 | Aleja gen. Józefa Hallera 130 | 2 | 3 | 60.1 | 650,324 | 10,815 | new |
| 07.08.2023 | Bolesława Chrobrego 79A | 6 | 1 | 35.2 | 479,183 | 13,617 | new |
| 07.08.2023 | Bolesława Chrobrego 79A | 4 | 1 | 33.5 | 428,234 | 12,764 | new |
| 04.08.2023 | Bolesława Chrobrego 79D | 5 | 1 | 37.4 | 790,000 | 21,134 | resale |
| 02.08.2023 | Bolesława Chrobrego 79A | 3 | 4 | 81.9 | 1,006,681 | 12,292 | new |
| 01.08.2023 | Bolesława Chrobrego 79B | 2 | 5 | 89.8 | 1,129,497 | 12,581 | new |
| 31.07.2023 | Bolesława Chrobrego 79C | 1 | 2 | 44.8 | 820,000 | 18,324 | resale |
| 27.07.2023 | Aleja gen. Józefa Hallera 130 | 4 | 2 | 40.2 | 464,653 | 11,567 | new |
| 25.07.2023 | Aleja gen. Józefa Hallera 130 | 3 | 4 | 75.4 | 863,398 | 11,446 | new |
| 21.07.2023 | Bolesława Chrobrego 79B | 1 | 2 | 42.4 | 576,767 | 13,590 | new |
| 19.07.2023 | Bolesława Chrobrego 79A | 3 | 3 | 54.5 | 699,359 | 12,830 | new |
| 18.07.2023 | Bolesława Chrobrego 79B | 4 | 4 | 69.2 | 889,614 | 12,861 | new |
| 18.07.2023 | Bolesława Chrobrego 79B | 6 | 3 | 60.9 | 842,096 | 13,828 | new |
| 17.07.2023 | Bolesława Chrobrego 79B | 5 | 4 | 111 | 1,600,000 | 14,420 | new |
| 14.07.2023 | Bolesława Chrobrego 79B | 2 | 5 | 103.2 | 1,362,229 | 13,194 | new |
| 14.07.2023 | Bolesława Chrobrego 79A | 5 | 4 | 119.2 | 1,699,287 | 14,255 | new |
| 12.07.2023 | Bolesława Chrobrego 79C | 1 | 4 | 90 | 750,000 | 8,331 | new |
| 11.07.2023 | Bolesława Chrobrego 79D | 2 | 2 | 50.5 | 710,000 | 14,059 | resale |
| 11.07.2023 | Aleja gen. Józefa Hallera 130 | 3 | 2 | 40.2 | 475,882 | 11,841 | new |
| 07.07.2023 | Bolesława Chrobrego 79A | 1 | 4 | 82 | 1,097,992 | 13,387 | new |
| 05.07.2023 | Bolesława Chrobrego 79A | 2 | 2 | 41.2 | 495,000 | 12,026 | new |
| 05.07.2023 | Aleja gen. Józefa Hallera 130 | 3 | 3 | 68.8 | 770,991 | 11,213 | new |
| 04.07.2023 | Bolesława Chrobrego 79A | 3 | 3 | 66.3 | 831,882 | 12,547 | new |
| 03.07.2023 | Bolesława Chrobrego 79A | 1 | 2 | 40.1 | 525,332 | 13,101 | new |
| 30.06.2023 | Bolesława Chrobrego 79A | 4 | 1 | 35 | 466,133 | 13,333 | new |
| 29.06.2023 | Bolesława Chrobrego 79B | 4 | 4 | 90.3 | 1,076,000 | 11,918 | new |
| 26.06.2023 | Bolesława Chrobrego 79A | 1 | 3 | 68.3 | 970,000 | 14,204 | new |
| 26.06.2023 | Bolesława Chrobrego 79B | 3 | 2 | 42.3 | 586,584 | 13,871 | new |
| 23.06.2023 | Bolesława Chrobrego 79A | 2 | 1 | 35 | 446,090 | 12,731 | new |
| 23.06.2023 | Bolesława Chrobrego 79A | 1 | 2 | 41.8 | 546,346 | 13,077 | new |
| 22.06.2023 | Bolesława Chrobrego 79A | 2 | 3 | 81.9 | 1,000,000 | 12,203 | new |
| 21.06.2023 | Bolesława Chrobrego 79B | 4 | 2 | 44 | 502,254 | 11,402 | new |
| 21.06.2023 | Bolesława Chrobrego 79A | 5 | 3 | 67.1 | 735,617 | 10,958 | new |
| 21.06.2023 | Bolesława Chrobrego 79B | 2 | 2 | 41.2 | 487,582 | 11,820 | new |
| 19.06.2023 | Bolesława Chrobrego 79A | 6 | 5 | 105.9 | 1,411,503 | 13,324 | new |
| 19.06.2023 | Bolesława Chrobrego 79A | 2 | 3 | 66.1 | 830,251 | 12,570 | new |
| 16.06.2023 | Bolesława Chrobrego 79A | 3 | 2 | 41.8 | 512,545 | 12,274 | new |
| 15.06.2023 | Aleja gen. Józefa Hallera 130 | 2 | 2 | 38.9 | 444,087 | 11,416 | new |
| 12.06.2023 | Bolesława Chrobrego 79B | 1 | 1 | 40.1 | 569,289 | 14,211 | new |
| 12.06.2023 | Bolesława Chrobrego 79B | 2 | 2 | 34.9 | 417,248 | 11,966 | new |
| 12.06.2023 | Grudziądzka 4 | 4 | 3 | 73.5 | 1,260,000 | 17,141 | resale |
| 12.06.2023 | Bolesława Chrobrego 79A | 1 | 2 | 41.9 | 544,967 | 13,009 | new |
| 07.06.2023 | Bolesława Chrobrego 79A | 3 | 3 | 71.7 | 904,703 | 12,611 | new |
| 06.06.2023 | Aleja gen. Józefa Hallera 130 | 3 | 2 | 40.2 | 464,537 | 11,570 | new |
| 02.06.2023 | Bolesława Chrobrego 79A | 4 | 2 | 41.4 | 519,000 | 12,533 | new |
| 31.05.2023 | Bolesława Chrobrego 79A | 2 | 2 | 40.2 | 515,463 | 12,807 | new |
| 31.05.2023 | Bolesława Chrobrego 79A | 3 | 3 | 66.8 | 819,116 | 12,259 | new |
| 31.05.2023 | Aleja gen. Józefa Hallera 132 | 8 | 3 | 63.8 | 1,360,000 | 21,323 | resale |
| 31.05.2023 | Bolesława Chrobrego 79A | 4 | 2 | 40.4 | 498,013 | 12,339 | new |
| 30.05.2023 | Bolesława Chrobrego 79A | 2 | 3 | 54.4 | 667,667 | 12,280 | new |
| 29.05.2023 | Bolesława Chrobrego 79A | 5 | 3 | 67.4 | 824,510 | 12,240 | new |
| 29.05.2023 | Bolesława Chrobrego 79A | 4 | 4 | 77.8 | 1,000,129 | 12,855 | new |
| 26.05.2023 | Bolesława Chrobrego 79B | 4 | 2 | 42.3 | 615,000 | 14,532 | new |
| 26.05.2023 | Bolesława Chrobrego 79A | 1 | 2 | 41.2 | 535,390 | 12,989 | new |
| 26.05.2023 | Bolesława Chrobrego 79A | 6 | 5 | 107 | 1,520,284 | 14,212 | new |
| 24.05.2023 | Bolesława Chrobrego 79A | 3 | 2 | 41.1 | 502,311 | 12,225 | new |
| 19.05.2023 | Bolesława Chrobrego 79A | 1 | 3 | 54.3 | 726,120 | 13,380 | new |
| 19.05.2023 | Bolesława Chrobrego 79B | 6 | 4 | 69.3 | 861,118 | 12,417 | new |
| 19.05.2023 | Bolesława Chrobrego 79A | 3 | 2 | 41.4 | 510,000 | 12,316 | new |
| 19.05.2023 | Bolesława Chrobrego 79A | 4 | 1 | 29.8 | 413,525 | 13,900 | new |
| 19.05.2023 | Bolesława Chrobrego 79A | 2 | 1 | 35.5 | 443,990 | 12,524 | new |
| 18.05.2023 | Bolesława Chrobrego 79D | 2 | 2 | 50.5 | 495,000 | 9,802 | new |
| 18.05.2023 | Bolesława Chrobrego 79A | 3 | 1 | 35.6 | 466,335 | 13,088 | new |
| 18.05.2023 | Grudziądzka 6A | 8 | 4 | 64.9 | 1,050,000 | 16,186 | resale |
| 17.05.2023 | Bolesława Chrobrego 79A | 1 | 4 | 77.4 | 1,013,498 | 13,099 | new |
| 17.05.2023 | Bolesława Chrobrego 79A | 6 | 5 | 106.1 | 1,430,000 | 13,483 | new |
| 17.05.2023 | Bolesława Chrobrego 79A | 4 | 3 | 59.6 | 713,647 | 11,974 | new |
| 16.05.2023 | Bolesława Chrobrego 79A | 4 | 3 | 72 | 943,298 | 13,096 | new |
| 16.05.2023 | Bolesława Chrobrego 79A | 2 | 1 | 34.7 | 445,900 | 12,850 | new |
| 15.05.2023 | Bolesława Chrobrego 79A | 3 | 3 | 56.8 | 728,076 | 12,830 | new |
| 15.05.2023 | Bolesława Chrobrego 79A | 5 | 4 | 106.5 | 1,584,347 | 14,876 | new |
| 15.05.2023 | Bolesława Chrobrego 79A | 4 | 3 | 56.8 | 743,429 | 13,095 | new |
| 15.05.2023 | Bolesława Chrobrego 79B | 4 | 3 | 58.6 | 789,327 | 13,463 | new |
| 15.05.2023 | Aleja gen. Józefa Hallera 130 | 3 | 2 | 42.4 | 785,000 | 18,519 | resale |
| 15.05.2023 | Bolesława Chrobrego 79A | 3 | 1 | 33.5 | 433,575 | 12,950 | new |
| 12.05.2023 | Aleja gen. Józefa Hallera 130 | 2 | 2 | 40 | 456,944 | 11,421 | new |
| 12.05.2023 | Bolesława Chrobrego 79A | 4 | 3 | 60.2 | 763,098 | 12,680 | new |
| 12.05.2023 | Bolesława Chrobrego 79B | 3 | 1 | 40.1 | 569,574 | 14,214 | new |
| 12.05.2023 | Bolesława Chrobrego 79B | 2 | 1 | 40 | 557,906 | 13,962 | new |
| 11.05.2023 | Bolesława Chrobrego 79A | 4 | 2 | 38 | 493,053 | 12,982 | new |
| 10.05.2023 | Bolesława Chrobrego 79A | 3 | 3 | 78.1 | 899,000 | 11,518 | new |
| 10.05.2023 | Bolesława Chrobrego 79A | 1 | 1 | 33.4 | 423,225 | 12,675 | new |
| 09.05.2023 | Bolesława Chrobrego 79B | 3 | 3 | 90.7 | 1,195,000 | 13,174 | new |
| 09.05.2023 | Bolesława Chrobrego 79C | 3 | 1 | 40.8 | 457,318 | 11,214 | new |
| 09.05.2023 | Bolesława Chrobrego 79A | 4 | 1 | 34.5 | 443,715 | 12,854 | new |
| 08.05.2023 | Bolesława Chrobrego 79A | 4 | 4 | 82.1 | 1,021,631 | 12,450 | new |
| 08.05.2023 | Bolesława Chrobrego 79A | 1 | 1 | 41.5 | 532,000 | 12,810 | new |
| 08.05.2023 | Bolesława Chrobrego 79A | 3 | 3 | 59.7 | 757,462 | 12,692 | new |
| 05.05.2023 | Bolesława Chrobrego 79A | 5 | 4 | 72.2 | 894,793 | 12,397 | new |
| 05.05.2023 | Bolesława Chrobrego 79B | 5 | 4 | 69.2 | 918,337 | 13,269 | new |
| 04.05.2023 | Aleja gen. Józefa Hallera 130 | 2 | 2 | 42.9 | 498,652 | 11,613 | new |
| 04.05.2023 | Bolesława Chrobrego 79B | 5 | 3 | 61.1 | 805,395 | 13,173 | new |
| 04.05.2023 | Bolesława Chrobrego 79A | 3 | 1 | 34.5 | 457,741 | 13,287 | new |
| 04.05.2023 | Bolesława Chrobrego 79A | 4 | 1 | 38.3 | 499,000 | 13,032 | new |
| 04.05.2023 | Bolesława Chrobrego 79A | 5 | 2 | 38 | 540,721 | 14,211 | new |
| 28.04.2023 | Bolesława Chrobrego 79A | 5 | 1 | 35.6 | 474,599 | 13,335 | new |
| 28.04.2023 | Bolesława Chrobrego 79A | 2 | 2 | 41.8 | 504,517 | 12,076 | new |
| 28.04.2023 | Bolesława Chrobrego 79B | 3 | 4 | 103.4 | 1,338,353 | 12,942 | new |
| 28.04.2023 | Aleja gen. Józefa Hallera 130 | 2 | 1 | 36.5 | 420,808 | 11,545 | new |
| 28.04.2023 | Bolesława Chrobrego 79B | 4 | 1 | 35.1 | 515,147 | 14,672 | new |
| 27.04.2023 | Bolesława Chrobrego 79A | 5 | 3 | 60.3 | 738,021 | 12,243 | new |
| 27.04.2023 | Bolesława Chrobrego 79A | 4 | 3 | 68.4 | 875,927 | 12,802 | new |
| 26.04.2023 | Aleja gen. Józefa Hallera 130 | 2 | 1 | 33.7 | 399,763 | 11,855 | new |
| 26.04.2023 | Bolesława Chrobrego 79B | 4 | 2 | 41.4 | 592,850 | 14,334 | new |
| 26.04.2023 | Bolesława Chrobrego 79A | 5 | 1 | 29.9 | 388,830 | 13,000 | new |
| 26.04.2023 | Aleja gen. Józefa Hallera 130 | 4 | 1 | 33.7 | 415,000 | 12,322 | new |
| 26.04.2023 | Bolesława Chrobrego 79C | 2 | 4 | 90.2 | 1,056,891 | 11,718 | new |
| 26.04.2023 | Bolesława Chrobrego 79A | 4 | 1 | 35.8 | 446,630 | 12,476 | new |
| 25.04.2023 | Bolesława Chrobrego 79A | 4 | 2 | 41.2 | 514,875 | 12,509 | new |
| 25.04.2023 | Bolesława Chrobrego 79A | 6 | 1 | 33.9 | 437,037 | 12,881 | new |
| 25.04.2023 | Bolesława Chrobrego 79B | 2 | 3 | 60.9 | 786,934 | 12,913 | new |
| 24.04.2023 | Bolesława Chrobrego 79A | 3 | 1 | 35.3 | 436,359 | 12,358 | new |
| 24.04.2023 | Bolesława Chrobrego 79B | 1 | 2 | 41.4 | 579,360 | 14,008 | new |
| 24.04.2023 | Bolesława Chrobrego 79A | 3 | 2 | 37.9 | 506,790 | 13,375 | new |
| 24.04.2023 | Aleja gen. Józefa Hallera 130 | 3 | 1 | 35.7 | 402,855 | 11,288 | new |
| 24.04.2023 | Bolesława Chrobrego 79A | 3 | 3 | 60 | 751,121 | 12,515 | new |
| 21.04.2023 | Bolesława Chrobrego 79A | 2 | 2 | 41.2 | 500,000 | 12,145 | new |
| 21.04.2023 | Bolesława Chrobrego 79A | 2 | 3 | 66.6 | 794,397 | 11,921 | new |
| 21.04.2023 | Aleja gen. Józefa Hallera 134 | 4 | 1 | 34.2 | 677,500 | 19,798 | resale |
| 21.04.2023 | Bolesława Chrobrego 79A | 3 | 2 | 40.4 | 494,021 | 12,240 | new |
| 21.04.2023 | Bolesława Chrobrego 79A | 2 | 3 | 71.9 | 881,934 | 12,264 | new |
| 21.04.2023 | Bolesława Chrobrego 79B | 3 | 3 | 58.7 | 764,740 | 13,024 | new |
| 20.04.2023 | Bolesława Chrobrego 79A | 6 | 4 | 72.1 | 909,453 | 12,607 | new |
| 20.04.2023 | Bolesława Chrobrego 79B | 4 | 1 | 40.2 | 566,690 | 14,086 | new |
| 20.04.2023 | Bolesława Chrobrego 79A | 3 | 3 | 66.8 | 815,851 | 12,204 | new |
| 20.04.2023 | Bolesława Chrobrego 79B | 1 | 4 | 103.4 | 1,383,661 | 13,387 | new |
| 19.04.2023 | Bolesława Chrobrego 79A | 6 | 3 | 60.2 | 783,049 | 13,005 | new |
| 19.04.2023 | Bolesława Chrobrego 79A | 1 | 3 | 66.1 | 845,640 | 12,797 | new |
| 19.04.2023 | Bolesława Chrobrego 79B | 4 | 5 | 103.3 | 1,353,297 | 13,097 | new |
| 19.04.2023 | Bolesława Chrobrego 79A | 6 | 4 | 119.5 | 1,697,984 | 14,211 | new |
| 19.04.2023 | Aleja gen. Józefa Hallera 130 | 1 | 3 | 56.5 | 653,958 | 11,579 | new |
| 19.04.2023 | Bolesława Chrobrego 79A | 4 | 1 | 33.4 | 452,562 | 13,542 | new |
| 19.04.2023 | Aleja gen. Józefa Hallera 130 | 1 | 2 | 42.3 | 489,694 | 11,563 | new |
| 19.04.2023 | Bolesława Chrobrego 79B | 4 | 3 | 61 | 788,190 | 12,928 | new |
| 18.04.2023 | Bolesława Chrobrego 79B | 6 | 4 | 110.8 | 1,630,000 | 14,714 | new |
| 18.04.2023 | Bolesława Chrobrego 79A | 3 | 2 | 37.9 | 484,316 | 12,782 | new |
| 18.04.2023 | Bolesława Chrobrego 79A | 6 | 1 | 29.9 | 407,682 | 13,635 | new |
| 18.04.2023 | Bolesława Chrobrego 79A | 2 | 3 | 66.6 | 805,406 | 12,090 | new |
| 18.04.2023 | Bolesława Chrobrego 79D | 1 | 1 | 27.9 | 288,670 | 10,335 | new |
| 18.04.2023 | Bolesława Chrobrego 79A | 3 | 2 | 41.2 | 505,000 | 12,266 | new |
| 18.04.2023 | Bolesława Chrobrego 79D | 2 | 1 | 28 | 294,600 | 10,514 | new |
| 17.04.2023 | Bolesława Chrobrego 79A | 1 | 3 | 58.8 | 745,686 | 12,688 | new |
| 17.04.2023 | Bolesława Chrobrego 79A | 4 | 2 | 41.3 | 514,377 | 12,467 | new |
| 17.04.2023 | Aleja gen. Józefa Hallera 130 | 1 | 2 | 44.1 | 518,471 | 11,762 | new |
| 14.04.2023 | Bolesława Chrobrego 79A | 2 | 1 | 33.4 | 420,623 | 12,582 | new |
| 14.04.2023 | Aleja gen. Józefa Hallera 130 | 5 | 1 | 35 | 378,808 | 10,832 | new |
| 14.04.2023 | Bolesława Chrobrego 79A | 4 | 4 | 72.1 | 909,076 | 12,605 | new |
| 14.04.2023 | Bolesława Chrobrego 79A | 5 | 2 | 38 | 478,615 | 12,592 | new |
| 14.04.2023 | Aleja gen. Józefa Hallera 130 | 1 | 2 | 42.9 | 489,658 | 11,411 | new |
| 14.04.2023 | Bolesława Chrobrego 79B | 2 | 2 | 42.4 | 565,935 | 13,351 | new |
| 13.04.2023 | Bolesława Chrobrego 79A | 3 | 1 | 33.9 | 430,587 | 12,698 | new |
| 13.04.2023 | Bolesława Chrobrego 79A | 2 | 2 | 41.2 | 509,618 | 12,360 | new |
| 13.04.2023 | Bolesława Chrobrego 79B | 3 | 3 | 69.6 | 899,000 | 12,924 | new |
| 13.04.2023 | Bolesława Chrobrego 79A | 2 | 1 | 29.9 | 381,340 | 12,767 | new |
| 13.04.2023 | Bolesława Chrobrego 79A | 2 | 1 | 33.8 | 410,092 | 12,115 | new |
| 13.04.2023 | Bolesława Chrobrego 79B | 3 | 2 | 41.5 | 590,711 | 14,220 | new |
| 13.04.2023 | Bolesława Chrobrego 79B | 3 | 1 | 35.2 | 516,467 | 14,668 | new |
| 13.04.2023 | Bolesława Chrobrego 79A | 1 | 2 | 41.2 | 523,064 | 12,696 | new |
| 12.04.2023 | Aleja gen. Józefa Hallera 130 | 2 | 1 | 35.9 | 414,769 | 11,566 | new |
| 12.04.2023 | Bolesława Chrobrego 79B | 3 | 2 | 43.9 | 598,591 | 13,635 | new |
| 12.04.2023 | Bolesława Chrobrego 79B | 1 | 4 | 89.9 | 1,165,908 | 12,970 | new |
| 12.04.2023 | Bolesława Chrobrego 79A | 2 | 3 | 56.6 | 723,722 | 12,784 | new |
| 12.04.2023 | Aleja gen. Józefa Hallera 130 | 4 | 3 | 69.2 | 745,171 | 10,773 | new |
| 12.04.2023 | Aleja gen. Józefa Hallera 130 | 1 | 4 | 86.5 | 920,958 | 10,643 | new |
| 11.04.2023 | Bolesława Chrobrego 79A | 2 | 2 | 38.1 | 508,333 | 13,349 | new |
| 11.04.2023 | Aleja gen. Józefa Hallera 130 | 3 | 3 | 60.1 | 648,489 | 10,792 | new |
| 11.04.2023 | Bolesława Chrobrego 79C | 1 | 4 | 92.6 | 1,086,183 | 11,736 | new |
| 11.04.2023 | Aleja gen. Józefa Hallera 130 | 2 | 2 | 40.1 | 459,313 | 11,443 | new |
| 07.04.2023 | Aleja gen. Józefa Hallera 130 | 4 | 1 | 33.7 | 414,766 | 12,300 | new |
| 07.04.2023 | Bolesława Chrobrego 79B | 2 | 3 | 58.5 | 762,393 | 13,037 | new |
| 06.04.2023 | Aleja gen. Józefa Hallera 130 | 2 | 2 | 43 | 499,791 | 11,628 | new |
| 06.04.2023 | Bolesława Chrobrego 79B | 3 | 3 | 61.2 | 776,522 | 12,684 | new |
| 06.04.2023 | Bolesława Chrobrego 79A | 6 | 1 | 35.7 | 484,790 | 13,580 | new |
| 06.04.2023 | Bolesława Chrobrego 79A | 2 | 3 | 59.8 | 764,143 | 12,783 | new |
| 05.04.2023 | Bolesława Chrobrego 79C | 3 | 2 | 45.8 | 530,232 | 11,577 | new |
| 04.04.2023 | Aleja gen. Józefa Hallera 130 | 1 | 3 | 60.2 | 720,316 | 11,963 | new |
| 03.04.2023 | Bolesława Chrobrego 79C | 1 | 3 | 58.3 | 663,522 | 11,371 | new |
| 03.04.2023 | Aleja gen. Józefa Hallera 130 | 3 | 2 | 43 | 514,522 | 11,952 | new |
| 03.04.2023 | Aleja gen. Józefa Hallera 130 | 5 | 1 | 36.5 | 419,345 | 11,495 | new |
| 31.03.2023 | Aleja gen. Józefa Hallera 130 | 2 | 1 | 35.8 | 408,316 | 11,399 | new |
| 31.03.2023 | Aleja gen. Józefa Hallera 130 | 2 | 4 | 73.1 | 811,558 | 11,104 | new |
| 30.03.2023 | Bolesława Chrobrego 79C | 3 | 1 | 35.5 | 428,879 | 12,064 | new |
| 29.03.2023 | Aleja gen. Józefa Hallera 130 | 4 | 2 | 40 | 467,080 | 11,680 | new |
| 29.03.2023 | Aleja gen. Józefa Hallera 130 | 4 | 2 | 43.2 | 516,076 | 11,952 | new |
| 29.03.2023 | Aleja gen. Józefa Hallera 130 | 5 | 2 | 39 | 419,322 | 10,741 | new |
| 28.03.2023 | Aleja gen. Józefa Hallera 130 | 4 | 2 | 40 | 483,069 | 12,068 | new |
| 28.03.2023 | Bolesława Chrobrego 79C | 3 | 3 | 62.8 | 759,121 | 12,086 | new |
Showing 300 most recent. All 576 — in the CSV.