Kwadrato Gdańsk

This city's sales in the register end on 05.02.2026: the city publishes them late, so prices lag the market by several months.

Address · 80-180 · Ujeścisko-Łostowice

Płocka 107 sale prices and the building's surroundings

Typical price here
9,847 zł/m²
middle 50% of sales: 8,297 – 11,530 zł/m²
388 sales over 24 months · Radius 500 m
price per m² by quarter, 2023–2025: 8,711 → 12,045
Typical flat 56.4 m² ≈ 555,014 zł
≈ 2,656 zł per month with a 20% down payment and a 30-year mortgage
Compared with the city-19.5%
Change over the year+13.3%
Typical flat56.4 m²
Check a listing
Refine: rooms, floor, market

Location

Pros

  • separate cycle track 3 min away
  • bike-share station 4 min away
  • quiet: noise below 55 dB
  • lots of green space: 37% within 500 m
  • grocery shops within 500 m: 7

Things to watch out for

  • 40 min to the centre by public transport
Transport3/10
weak
40 min to the centre; rush-hour departures nearby: 112
Shops nearby4/10
weak
within 500 m grocery shops: 7, pharmacies: 1; doctors within 1 km: 4
Schools and kindergartens8/10
good
school 10 min away (exam 70%); kindergartens within 1 km: 18
Quiet10/10
excellent
noise below 55 dB
Green space6/10
average
37% green space within 500 m, park 19 min away
Low risk10/10
excellent
outside flood zones; road accidents with injuries nearby: 0
On the map:

Risks

  • noise below 55 dB according to the noise map
  • outside ISOK flood zones
  • NO₂ 13.5 µg/m³ per year — below the 2030 EU limit (20)
  • PM2.5 dust 13.7 µg/m³ a year — within the Polish limit of 20, but above the EU limit from 2030 (10)
  • no plants with a risk of a major accident (SEVESO) within 2 km
  • no plants of the PRTR pollutant register within 1 km
  • Road accidents with injuries nearby in 3 years: 0

Sources: the city's strategic noise map, ISOK flood maps (Wody Polskie), EEA annual air quality model (1 km), road accident data, SEVESO and PRTR registers (GIOŚ). The maps are a general guide, not a verdict on an individual building.

What may be built nearby

  • A local zoning plan (MPZP) is in force №XLI/1362/05 «MPZP Zakoniczyn na wschód od ulicy Unruga w mieście Gdańsku» — what can be built nearby is already set.
  • Allowed by the plan within 150 m: streets and roads (104 m); services: shops, offices, venues (147 m).
  • City general plan (POG) for this place: mixed zone with blocks of flats — draft (not in force yet), height up to 15 m, building coverage up to 35%, intensity up to 0.7, biologically active area from 40%.
  • No building permits found within 500 m in the last 3 years (GUNB register; some permits have no usable address and cannot be placed on the map).
All land uses within 150 m
  • single-family houses · 0 m
  • streets and roads · 104 m
  • utility networks · 131 m
  • services: shops, offices, venues · 147 m

What buying will cost

For a typical flat here — 555,014 zł, 56.4 m², 80% mortgage over 30 years at 5.98%.

Cash up front126,229 zł
Monthly payment2,656 zł
Taxes and notary15,226 zł

Calculate for your situation →

Why the price is what it is here

What affects the price here

How we calculate this

District Ujeścisko-Łostowice: similar flats here are on average cheaper by 17.8% compared with the city average.

Green space nearby · 37%+0.6%

Effect on the price per m² compared with similar flats in the same district, based on 2022–2026 sales. These are statistical links, not a guarantee for a specific flat.

Developer prices nearby
DevelopmentDistanceFlatsMedian zł/m²Change
ul. Bieszczadzka
KAJAR Investment
1,012 m6710,500-11.1%
ul. Bieszczadzka
ROBYG Jabłoniowa
1,012 m22710,695-6.9%
Warszawska
Euro Styl
1,279 m1414,290+3.5%
Warszawska 0
Euro Styl
1,279 m613,900+2%
Knyszyńska 16A
Litus Development 8 Sp.k
1,343 m110,350—
Wielkopolska 53
Bravo Developer Wielkopolska
1,408 m10512,635-1.8%

Asking prices from daily price lists (dane.gov.pl), 1.5 km radius.

What to check yourself before buying
  • Land and mortgage register (KW) — owner, mortgages, encumbrances: free of charge at ekw.ms.gov.pl.
  • Type of ownership — full ownership or cooperative right; share of the land in perpetual usufruct (annual fee).
  • Fees — fees to the owners' association, repair fund, any arrears of the previous owner.
  • Building — year built, condition of the roof and façade, planned repairs (owners' association minutes).
  • Flat — which way the windows face, ventilation, damp, window frames, heating.
  • For a new build — information prospectus, building permit, escrow bank account.
Location in detail: stops, schools, green space, sun

Location card

from the address

Transport

40 min to the centre at 7:45 on a weekday

  • Człuchowska 01 · 309 m · 5 departures 7–9 am
    118
  • Bramińskiego 01 · 367 m · 5 departures 7–9 am
    118
  • Bramińskiego 02 · 386 m · 5 departures 7–9 am
    118
  • Niepołomicka 02 · 482 m · 45 departures 7–9 am
    N1N2113155175176213255256262295N14
  • Człuchowska 02 · 486 m · 5 departures 7–9 am
    118
Time to other districts at 7:45: 3 of 35 within 30 min
Ujeścisko-Łostowice — your district7 min
Wzgórze Mickiewicza29 min
Chełm30 min
Piecki-Migowo32 min
Suchanino33 min
Jasień34 min
Orunia Górna-Gdańsk Południe35 min
Orunia-Św. Wojciech-Lipce37 min
Siedlce39 min
Śródmieście42 min
Kokoszki45 min
Młyniska45 min
Aniołki46 min
Brętowo46 min
Wrzeszcz Górny50 min
Letnica54 min
Nowy Port54 min
Wrzeszcz Dolny54 min
Zaspa Młyniec57 min
Strzyża59 min
Przeróbka60 min
Rudniki62 min
Stogi62 min
Oliwa63 min
Przymorze Małe63 min
Zaspa Rozstaje63 min
Brzeźno64 min
VII Dwór66 min
Przymorze Wielkie70 min
Żabianka-Wejhera-Jelitkowo-Tysiąclecia70 min
Matarnia74 min
Krakowiec-Górki Zachodnie79 min
Olszynka88 min
Wyspa Sobieszewska98 min
Osowa102 min

By public transport and on foot to where most of the district's addresses are; a weekday, by the timetable.

Schools and kindergartens

SZKOŁA PODSTAWOWA NR 12 IM. PRZYJACIÓŁ GDAŃSKA579 m70.5%
CHRZEŚCIJAŃSKA SZKOŁA MONTESSORI NR 2private599 m78.8%
PUBLICZNA SZKOŁA PODSTAWOWA FUTURI681 m—
PUBLICZNA SZKOŁA PODSTAWOWA "OLIMPIJCZYK" W GDAŃSKU Z ODDZIA752 m57.5%

The last column is the average 8th-grade exam result (Polish, maths, English), CKE. The city does not publish the school catchment area for each address — check at www.gdansk.pl/edukacja.

Kindergartens within 1 km: 18 (public: 8) · nearest: 3 min walk

Universities

Uniwersytet Gdański 4.9 km38 min
Politechnika Gdańska 4.9 km41 min
Gdański Uniwersytet Medyczny 4.9 km45 min
Uniwersytet WSB Merito w Gdańsku non-public7.2 km57 min
Akademia Wychowania Fizycznego i Sportu im. Jędrzeja Śniadec 10.8 km63 min

The city's largest institutions by full-time students. Distance is a straight line to the nearest building of the institution; time is by public transport and on foot at 7:45 on a weekday.

Nearby

Grocery shops7 within 500 mnearest: 7 min walk
Pharmacies1 within 500 mnearest: 7 min walk
Doctors, clinics4 within 1 kmnearest: 12 min walk
Playgrounds16 within 500 mnearest: 3 min walk
Cafés and restaurants0 within 500 mnearest: 10 min walk
City bike hire3 within 500 mnearest: 4 min walk
Gyms0 within 1 kmnearest: 18 min walk
Park & Ride0 within 2 km
EV chargers0 within 1 km

Green space, noise, air

37% of the area within 500 m — parks, forests, lawns

Nearest green area: right nearby · park «Jar Wilanowski» — 1,115 m

Noise: roadsquiet (below 55 dB)
Noise: tramsquiet (below 55 dB)
Noise: railwayquiet (below 55 dB)
Noise: airportquiet (below 55 dB)
Noise: industryquiet (below 55 dB)

Strategic noise map, LDWN (24 h). Limit for blocks of flats: 68 dB from roads, trams and railways (70 dB in a big city's centre zone), 60 dB from aircraft, 55 dB from industry. WHO recommends up to 53 dB from roads.

Loading air quality…

Risks and restrictions

Flood once in 10 yearsno
Flood once in 100 yearsno
Flood once in 500 yearsno
Flood if a levee breaksno
Road accidents in 3 years, 300 m5
Paid parkingno

Flood zones — ISOK (Wody Polskie); 1 cell ≈ 7 m. Being in the Q1% zone affects insurance and mortgages.

What may be built nearby

Local zoning plan (MPZP)№XLI/1362/05 MPZP Zakoniczyn na wschód od ulicy Unruga w mieście Gdańsku · resolution
Land use within 150 m
023-M22 zabudowa mieszkaniowa ekstensywna
070-KD80 ulice dojazdowe · 104 m
072-W infrastruktura techniczna · 131 m
01.1 MN teren zabudowy mieszkaniowej jednorodzinnej · 135 m
073-U33 zabudowa usługowa komercyjna i publiczna · 147 m
City general plan (POG)1670SW strefa wielofunkcyjna z zabudową mieszkaniową wielorodzinną
draft (not in force yet), height up to 15 m, building coverage up to 35%, intensity up to 0.7, biologically active area from 40%

MW — blocks of flats, MN — houses, U — services, ZP — parks, KD — roads.

Sun

Calculating…

Sources: GTFS, OpenStreetMap, city GIS, ISOK, GIOŚ, RSPO, CKE, RAD-on, GUGiK. Source status

Sales, charts and filters (654 sales)

Area: Radius 500 m · 654 sales with filters applied

Market
Rooms
Area, m²
Floor
Period
Median, 12 mo.
11,885 zł/m²
83 sales
Difference from the city, 12 mo.
-6.1%
city: 12,651 zł/m²
Difference from the district
+1.8%
Ujeścisko-Łostowice: 11,670 zł/m²
Change over the year
+13.3%
prices within the same market (new builds with new builds)
Median price
649,000 zł
area 55.6 m²
All time
9,290 zł/m²
654 sales · primary market 83.5%
Company buyers
1.2%
share of sales in 12 mo.

Median price per m² by quarter

The band is the middle 50% of sales in the area. Quarters with fewer than 3 sales in the area are skipped. The last quarter is incomplete.

Distribution of price per m²

5,000–6,000 zł/m²: 86 sales6,000–7,000 zł/m²: 3 sales7,000–8,000 zł/m²: 23 sales8,000–9,000 zł/m²: 167 sales9,000–10,000 zł/m²: 161 sales10,000–11,000 zł/m²: 76 sales11,000–12,000 zł/m²: 59 sales12,000–13,000 zł/m²: 42 sales13,000–14,000 zł/m²: 18 sales14,000–15,000 zł/m²: 19 sales56789101112131415

area median 9,290 zł/m² city median 12,651 zł/m² · k zł/m², 654 sales

Resales

30 sales — flats sold twice. Median price change +54.5% over a median of 9.7 mo. between deeds.

The first price mostly comes from the developer's handover deed and was agreed 1–3 years earlier, so the difference shows growth over a longer period.

AddressAreaBoughtPriceSoldPriceDifference
Przemyska 2792.505.12.2024508,67009.01.20261,270,000+149.7%
Przemyska 2564.303.01.2025360,24423.12.2025812,000+125.4%
Przemyska 3167.503.07.2025781,43923.12.2025960,000+22.9%
kmdr. Tadeusza Bramińskiego 643.428.04.2025483,36515.12.2025601,365+24.4%
Przemyska 2566.206.12.2024358,02818.11.2025685,000+91.3%
Przemyska 3156.509.12.2024319,37720.10.2025625,000+95.7%
Przemyska 2567.805.12.2024378,33808.09.2025700,000+85%
Przemyska 2741.704.12.2024241,43028.08.2025515,000+113.3%
Płocka 1255.925.06.2024840,00014.08.2025815,000-3%
Stanisława Dąbka 3336.429.11.2024323,00012.08.2025625,000+93.5%
Przemyska 2983.113.11.2024458,91509.06.2025982,000+114%
kmdr. Tadeusza Bramińskiego 137.515.06.2023370,87205.06.2025550,000+48.3%
Przemyska 2976.120.11.2024400,20330.05.2025810,000+102.4%
kmdr. Tadeusza Bramińskiego 669.411.04.2024668,75129.05.2025959,000+43.4%
Płocka 147420.09.2023800,00015.05.2025880,000+10%
Przemyska 2758.413.11.2024329,31813.05.2025675,000+105%
Przemyska 3141.507.11.2024240,27324.03.2025536,000+123.1%
kmdr. Tadeusza Bramińskiego 245.628.08.2023390,78121.03.2025604,000+54.6%
kmdr. Tadeusza Bramińskiego 643.427.03.2024376,15514.03.2025622,500+65.5%
kmdr. Tadeusza Bramińskiego 558.107.12.2023557,41913.03.2025759,000+36.2%
kmdr. Tadeusza Bramińskiego 241.518.05.2023349,51223.12.2024500,000+43.1%
kmdr. Tadeusza Bramińskiego 354.826.05.2023433,61905.11.2024770,000+77.6%
kmdr. Tadeusza Bramińskiego 553.707.12.2023528,64030.10.2024730,000+38.1%
Płocka 1444.821.03.2024392,00008.08.2024479,000+22.2%
kmdr. Tadeusza Bramińskiego 245.725.05.2023381,39410.06.2024589,385+54.5%
Stanisława Dąbka 425.310.08.2023192,17901.02.2024325,000+69.1%
kmdr. Tadeusza Bramińskiego 354.830.05.2023481,65815.01.2024732,000+52%
kmdr. Tadeusza Bramińskiego 15514.06.2023452,97025.10.2023532,000+17.4%
kmdr. Tadeusza Bramińskiego 143.811.05.2023416,00413.10.2023552,500+32.8%
Płocka 551.724.03.2023450,00022.09.2023500,000+11.1%

Sales (654)

CSV
DateAddressFloorRoomsAreaPricezł/m²Market
16.01.2026Płocka 144357800,00014,023resale
14.01.2026Płocka 143244.5610,00013,714resale
09.01.2026Przemyska 274—92.51,270,00013,725resale
23.12.2025Przemyska 253—64.3812,00012,626resale
23.12.2025Przemyska 313—67.5960,00014,222resale
15.12.2025kmdr. Tadeusza Bramińskiego 63—43.4601,36513,847resale
15.12.2025Stanisława Dąbka 41234.5459,00013,297new
08.12.2025Przemyska 315—72.4424,8475,867new
08.12.2025Płocka 123240.3520,00012,900resale
08.12.2025Przemyska 275—104.7572,4175,470new
05.12.2025Płocka 951—160.21,370,0008,550new
02.12.2025Płocka 142356.6650,00011,480resale
18.11.2025Przemyska 251—66.2685,00010,352resale
13.11.2025Stanisława Dąbka 33A3—50595,00011,912new
31.10.2025Płocka 102355.6700,00012,594resale
28.10.2025Stanisława Dąbka 33A1—54.5680,00012,466new
27.10.2025Stanisława Dąbka 33A3—36.7446,11712,169new
24.10.2025Zamojska 154452.2569,00010,902resale
22.10.2025Stanisława Dąbka 41225.6380,00014,844resale
21.10.2025Stanisława Dąbka 33A2—50.3570,00011,330new
21.10.2025Stanisława Dąbka 33A1—50.1579,28711,553new
20.10.2025Przemyska 311—56.5625,00011,054resale
10.10.2025Stanisława Dąbka 33A2—54.7658,49912,045new
10.10.2025Stanisława Dąbka 33A2—36.7450,00012,258new
10.10.2025Stanisława Dąbka 33A1—32384,65012,035new
10.10.2025Stanisława Dąbka 33A1—36.6405,00011,057new
08.10.2025Stanisława Dąbka 33A2—52.5649,00012,352new
03.10.2025Stanisława Dąbka 33A1—52.8568,68610,777new
02.10.2025Stanisława Dąbka 33A2—32400,00012,516new
02.10.2025Płocka 142130.3458,00015,135resale
08.09.2025Przemyska 254—67.8700,00010,332resale
08.09.2025Płocka 122357.1740,00012,967resale
02.09.2025Płocka 101347.5720,00015,171resale
28.08.2025Przemyska 274—41.7515,00012,344resale
18.08.2025Płocka 105246.7700,00015,005resale
14.08.2025Płocka 124355.9815,00014,572resale
12.08.2025Stanisława Dąbka 331—36.4625,00017,151resale
12.08.2025Przemyska 275—84.21,017,80312,092new
12.08.2025Przemyska 294—84.21,028,48412,219new
18.07.2025Płocka 871—119.91,037,0008,646new
18.07.2025kmdr. Tadeusza Bramińskiego 82—89.3847,6389,487resale
04.07.2025Stanisława Dąbka 24350.5570,00011,278resale
03.07.2025Przemyska 313—67.5781,43911,577new
27.06.2025Płocka 101347.9735,00015,354resale
25.06.2025Płocka 931—160.41,386,0008,641new
23.06.2025Płocka 951—160.31,386,0008,645new
16.06.2025Płocka 931—160.61,340,0008,345new
11.06.2025Kaliska 3B1453.9670,00012,433resale
09.06.2025Przemyska 293—83.1982,00011,821resale
05.06.2025kmdr. Tadeusza Bramińskiego 14237.5550,00014,663resale
30.05.2025Przemyska 292—76.1810,00010,645resale
29.05.2025kmdr. Tadeusza Bramińskiego 63—69.4959,00013,824resale
28.05.2025Płocka 114342.3490,00011,584resale
26.05.2025Płocka 143130.1450,00014,965resale
15.05.2025Płocka 144474880,00011,885resale
13.05.2025Przemyska 274—58.4675,00011,552resale
12.05.2025Przemyska 311—86.5995,69711,511new
28.04.2025kmdr. Tadeusza Bramińskiego 63—43.4483,36511,130new
24.04.2025Płocka 7D3461.9620,00010,015resale
11.04.2025Przemyska 10B3351.1580,00011,350resale
02.04.2025Przemyska 274—64.4806,45612,523new
24.03.2025Przemyska 312—39.9474,83211,904new
24.03.2025Przemyska 315—41.5536,00012,916resale
24.03.2025Przemyska 294—72.3402,4795,564new
21.03.2025Płocka 144244.2552,00012,503resale
21.03.2025kmdr. Tadeusza Bramińskiego 24245.6604,00013,234resale
18.03.2025Płocka 891—134.21,180,0008,790new
14.03.2025kmdr. Tadeusza Bramińskiego 62—43.4622,50014,357resale
13.03.2025Przemyska 184247.3725,00015,315resale
13.03.2025kmdr. Tadeusza Bramińskiego 55—58.1759,00013,066resale
10.03.2025Stanisława Dąbka 331—36.7339,5989,258new
05.03.2025Płocka 1051—134.21,200,0008,940new
03.03.2025Przemyska 24C1242.2499,00011,825resale
03.03.2025Przemyska 255—83.3917,47011,011new
26.02.2025Przemyska 254—62348,0955,614new
24.02.2025Przemyska 251—61.5649,66210,562new
21.02.2025Przemyska 271—40452,40911,299new
21.02.2025Kaliska 3C3473730,00010,003resale
18.02.2025Przemyska 291—83.6965,69211,550new
17.02.2025Przemyska 294—76.5424,5695,547new
14.02.2025Przemyska 295—59.9767,98612,817new
12.02.2025Stanisława Dąbka 333—44518,00011,786new
06.02.2025Kaliska 8B3360.4480,0007,948resale
05.02.2025Płocka 1111—1201,090,0009,083new
31.01.2025Stanisława Dąbka 331—54.3535,5689,863new
30.01.2025Stanisława Dąbka 332—50590,00011,800new
30.01.2025kmdr. Tadeusza Bramińskiego 61—89.1798,6358,961resale
30.01.2025Stanisława Dąbka 332—71.3890,00012,479new
29.01.2025Przemyska 312—64.2727,80411,338new
29.01.2025Płocka 143356.4680,00012,059resale
29.01.2025Przemyska 255—93.41,177,78712,610new
24.01.2025Płocka 125136430,00011,954resale
22.01.2025Przemyska 272—91.81,049,70011,437new
21.01.2025Płocka 1231—134.41,246,9479,278new
17.01.2025Przemyska 254—40.3233,8565,806new
17.01.2025Płocka 143357.4780,00013,582resale
15.01.2025Przemyska 312—41237,5915,796new
15.01.2025Przemyska 314—41.5240,2205,790new
13.01.2025Przemyska 293—41.3506,22612,248new
13.01.2025Stanisława Dąbka 333—45.4434,0009,553new
13.01.2025Stanisława Dąbka 331—44480,00010,902new
08.01.2025Przemyska 313—36.8493,47713,402new
08.01.2025Przemyska 314—65.9791,74912,005new
03.01.2025Przemyska 314—67.3721,33410,712new
03.01.2025Stanisława Dąbka 171469.2820,00011,841resale
03.01.2025Przemyska 254—59.7336,1565,628new
03.01.2025Przemyska 253—64.3360,2445,602new
30.12.2024Przemyska 253—40.5213,0145,260new
30.12.2024Przemyska 252—39.8209,2275,260new
30.12.2024Przemyska 292—40.1232,7525,809new
30.12.2024Przemyska 253—40.6213,5925,260new
30.12.2024Przemyska 292—41.3239,3265,792new
30.12.2024Przemyska 313—55.7315,1175,654new
30.12.2024Przemyska 314—40232,6475,809new
30.12.2024Przemyska 274—37.1217,1315,853new
30.12.2024Przemyska 273—40.6235,6975,801new
30.12.2024Przemyska 314—41.5240,4835,789new
30.12.2024Przemyska 253—40.3211,9625,260new
23.12.2024kmdr. Tadeusza Bramińskiego 22241.5500,00012,051resale
20.12.2024Stanisława Dąbka 332—94.2834,9438,861new
20.12.2024Stanisława Dąbka 331—71.9770,00010,708new
20.12.2024Płocka 143248.5630,00012,979resale
20.12.2024Przemyska 315—81.9923,90511,280new
19.12.2024Przemyska 264475.3750,0009,960resale
18.12.2024Płocka 1291—133.51,250,0009,362new
18.12.2024Płocka 991—119.81,050,0008,768new
16.12.2024Przemyska 294—41.6218,8525,260new
16.12.2024Przemyska 311—57.6302,7435,260new
12.12.2024Płocka 891—134.21,160,0008,646new
10.12.2024Płocka 1131—134.81,157,7448,589new
09.12.2024Stanisława Dąbka 332—44.1505,00011,451new
09.12.2024Przemyska 253—66.6768,04611,529new
09.12.2024Przemyska 311—56.5319,3775,649new
06.12.2024Przemyska 295—40.3513,07912,716new
06.12.2024Stanisława Dąbka 332—45.7523,00011,457new
06.12.2024Przemyska 251—66.2358,0285,411new
06.12.2024Przemyska 293—76.1422,4665,549new
05.12.2024Stanisława Dąbka 332—36.4362,9459,963new
05.12.2024Przemyska 254—67.8378,3385,584new
05.12.2024Przemyska 293—71.2821,57911,533new
05.12.2024Stanisława Dąbka 333—36.8384,47010,462new
05.12.2024Przemyska 274—92.5508,6705,497new
05.12.2024Stanisława Dąbka 331—30.8274,2408,907new
04.12.2024Przemyska 274—41.7241,4305,787new
04.12.2024Przemyska 272—40.2233,5415,807new
04.12.2024Przemyska 252—37.4196,4995,260new
04.12.2024Przemyska 252—39.7230,7535,814new
04.12.2024Przemyska 253—40.4212,3305,260new
03.12.2024Przemyska 252—65.9368,7125,593new
02.12.2024Płocka 1211—134.61,250,0009,284new
02.12.2024Przemyska 311—63.5356,2475,606new
02.12.2024Przemyska 272—57.9666,75111,508new
02.12.2024Przemyska 273—41.7241,1675,788new
02.12.2024Stanisława Dąbka 333—34.5350,00010,136new
02.12.2024Przemyska 251—40252,5416,309new
02.12.2024Przemyska 252—59678,41511,495new
02.12.2024Przemyska 251—64.4706,42010,968new
29.11.2024Przemyska 252—63.7345,0365,417new
29.11.2024Stanisława Dąbka 331—36.4323,0008,864new
29.11.2024Przemyska 252—39.8231,3325,812new
29.11.2024Przemyska 254—37.8199,0235,260new
29.11.2024Przemyska 291—76.2422,8345,548new
29.11.2024Przemyska 312—36.3507,21313,954new
29.11.2024Przemyska 295—105.7612,8865,799new
29.11.2024Przemyska 254—40.5212,8565,260new
29.11.2024Przemyska 253—38199,7605,260new
29.11.2024Przemyska 255—77.2869,22811,261new
28.11.2024Przemyska 292—71.1395,8525,569new
28.11.2024Przemyska 275—59.7737,81712,367new
28.11.2024Przemyska 312—41.2499,01812,127new
28.11.2024Stanisława Dąbka 331—45.8515,00011,257new
27.11.2024Przemyska 313—40.4247,5936,125new
27.11.2024Stanisława Dąbka 332—36.7415,00011,323new
27.11.2024Przemyska 273—92.6508,7765,497new
27.11.2024Stanisława Dąbka 333—93.8855,5309,120new
27.11.2024Przemyska 252—39.9209,7535,260new
27.11.2024Przemyska 255—53300,6535,675new
27.11.2024Przemyska 311—40232,4435,810new
27.11.2024Przemyska 272—41.2243,9585,914new
27.11.2024Przemyska 312—39.8231,5955,812new
27.11.2024Przemyska 314—56348,5906,224new
27.11.2024Przemyska 313—41.4239,6425,791new
26.11.2024Stanisława Dąbka 332—34.5343,2559,949new
26.11.2024Przemyska 314—40.5234,7505,803new
26.11.2024Stanisława Dąbka 333—49.8475,0009,546new
26.11.2024Stanisława Dąbka 333—36.3365,00010,047new
26.11.2024Przemyska 313—40.2233,5415,807new
26.11.2024Przemyska 311—77.2427,7785,545new
26.11.2024Przemyska 312—55.5313,8025,656new
26.11.2024Stanisława Dąbka 333—71.5794,45011,105new
25.11.2024Przemyska 251—40.3222,1195,508new
25.11.2024Przemyska 251—41.1485,27111,807new
25.11.2024Przemyska 272—68.4382,0195,581new
25.11.2024Przemyska 252—66.4380,4475,726new
25.11.2024Przemyska 274—40.6235,6455,801new
25.11.2024Przemyska 291—71.3396,9045,568new
25.11.2024Przemyska 313—65.4366,2405,596new
25.11.2024Przemyska 253—67.6377,7065,585new
22.11.2024Przemyska 294—40.4503,80312,467new
22.11.2024Przemyska 254—40.5228,9095,655new
22.11.2024Przemyska 291—41.4480,40211,610new
22.11.2024Przemyska 292—56.5319,1675,649new
22.11.2024Przemyska 292—83.4460,7035,523new
22.11.2024Przemyska 253—59.6327,4205,495new
22.11.2024Przemyska 291—56.3318,3255,650new
22.11.2024Płocka 1011—119.61,040,0008,694new
22.11.2024Przemyska 315—40.5234,9085,803new
22.11.2024Płocka 1291—134.71,250,0009,279new
22.11.2024Płocka 1011—123.11,069,0008,682new
21.11.2024Płocka 971—1601,410,0008,811new
21.11.2024Przemyska 255—58305,0045,260new
21.11.2024Przemyska 273—37.1194,9735,260new
21.11.2024Przemyska 275—40.3478,33711,855new
21.11.2024Przemyska 273—58.2624,65610,737new
21.11.2024Przemyska 271—58305,1095,260new
21.11.2024Przemyska 251—90.5475,8895,260new
21.11.2024Przemyska 315—78.3914,75311,689new
20.11.2024Przemyska 315—87.61,032,30311,791new
20.11.2024Przemyska 314—65.5366,5035,595new
20.11.2024Przemyska 294—56.6297,9045,260new
20.11.2024Przemyska 254—64.3738,52511,493new
20.11.2024Płocka 1031—1201,073,7138,950new
20.11.2024Płocka 1031—135.41,146,9468,472new
20.11.2024Przemyska 272—41.3459,52211,137new
20.11.2024Płocka 1271—134.31,250,0009,307new
20.11.2024Przemyska 292—76.1400,2035,260new
20.11.2024Przemyska 313—65.8724,00711,000new
19.11.2024Przemyska 312—65.6770,65011,753new
19.11.2024Przemyska 271—41.1490,20511,924new
19.11.2024Przemyska 274—41.6517,04812,438new
19.11.2024Przemyska 311—65.7722,54610,993new
19.11.2024Przemyska 314—36.7516,11814,048new
18.11.2024Przemyska 315—41.8530,39512,698new
18.11.2024Przemyska 293—56.5319,0625,649new
18.11.2024Płocka 911—1521,325,0008,717new
18.11.2024Płocka 871—119.61,035,0008,655new
18.11.2024Przemyska 271—69698,21310,118new
18.11.2024Przemyska 273—64.3360,4025,602new
15.11.2024Płocka 1251—132.81,225,0009,224new
15.11.2024Przemyska 271—41.2514,98212,484new
15.11.2024Przemyska 271—41.2477,98311,587new
15.11.2024Przemyska 291—40474,19211,849new
14.11.2024Płocka 1071—119.81,040,0008,684new
14.11.2024Przemyska 272—36.9215,9745,856new
14.11.2024Płocka 971—160.41,410,0008,791new
14.11.2024Płocka 1151—1201,080,0009,002new
14.11.2024Przemyska 251—50.4265,1895,260new
14.11.2024Przemyska 273—41.7241,1155,788new
13.11.2024Przemyska 313—41.5486,64011,715new
13.11.2024Przemyska 293—40.1485,37912,110new
13.11.2024Przemyska 312—66724,45110,972new
13.11.2024Przemyska 254—35.9210,8195,872new
13.11.2024Przemyska 274—58.4329,3185,636new
13.11.2024Przemyska 295—84.1464,5425,521new
13.11.2024Przemyska 293—83.1458,9155,524new
13.11.2024Przemyska 271—83.7462,3885,522new
07.11.2024Przemyska 315—41.5240,2735,790new
05.11.2024Płocka 1071—119.81,080,0009,016new
05.11.2024kmdr. Tadeusza Bramińskiego 31354.8770,00014,056resale
30.10.2024kmdr. Tadeusza Bramińskiego 52—53.7730,00013,584resale
30.10.2024Przemyska 223347.6360,0007,557resale
23.10.2024Płocka 1171—134.81,200,0008,901new
22.10.2024Płocka 851—157.81,380,0008,746new
15.10.2024Płocka 1111—119.91,090,0009,090new
09.10.2024Płocka 1191—151.91,276,8058,408new
09.10.2024Płocka 1231—134.51,250,0009,296new
08.10.2024Płocka 1211—153.81,450,0009,428new
03.10.2024kmdr. Tadeusza Bramińskiego 83—61632,73110,373new
02.10.2024Płocka 1151—119.91,090,0009,088new
01.10.2024Płocka 1091—134.61,148,7208,536new
30.09.2024Płocka 22359.4760,00012,795resale
30.09.2024Płocka 1171—134.81,199,0008,895new
23.09.2024kmdr. Tadeusza Bramińskiego 41489.1722,0348,100new
20.09.2024Płocka 1271—134.41,259,0009,367new
17.09.2024Płocka 1131—134.51,180,0008,773new
13.09.2024Płocka 1091—134.5997,7007,419new
11.09.2024Płocka 1051—133.91,065,1577,952new
09.09.2024kmdr. Tadeusza Bramińskiego 81—41.5402,1559,683new
06.09.2024Przemyska 10B1343.3460,00010,624resale
29.08.2024Płocka 101239.2500,00012,758resale
26.08.2024kmdr. Tadeusza Bramińskiego 81—48.3568,17511,751new
26.08.2024kmdr. Tadeusza Bramińskiego 82—69.5658,0249,468new
26.08.2024Przemyska 12B4465.7599,0009,117resale
08.08.2024Płocka 141244.8479,00010,694resale
26.07.2024Przemyska 262470.3660,0009,388resale
15.07.2024kmdr. Tadeusza Bramińskiego 61—64.8578,7968,931new
11.07.2024kmdr. Tadeusza Bramińskiego 62—89.4846,1559,469new
11.07.2024Stanisława Dąbka 151241.3545,00013,180resale
08.07.2024Płocka 102240.5550,00013,584resale
03.07.2024kmdr. Tadeusza Bramińskiego 84—48.4546,00411,279new
01.07.2024Płocka 105236.8520,00014,111resale
27.06.2024Płocka 143247.2610,00012,929resale
25.06.2024Płocka 124355.9840,00015,019resale
25.06.2024kmdr. Tadeusza Bramińskiego 25360.9538,6738,844new
21.06.2024kmdr. Tadeusza Bramińskiego 63—61.1601,4899,851new
20.06.2024kmdr. Tadeusza Bramińskiego 22489.4726,8748,132new
20.06.2024kmdr. Tadeusza Bramińskiego 22489.4726,8748,132new
14.06.2024Płocka 103242.2582,00013,782resale
10.06.2024kmdr. Tadeusza Bramińskiego 64—89.5873,5859,762new
10.06.2024kmdr. Tadeusza Bramińskiego 22245.7589,38512,902resale

Showing 300 most recent. All 654 — in the CSV.

Data: Rejestr Cen Nieruchomości (GUGiK), PRG addresses, district boundaries from the city's open data or OpenStreetMap. Sales up to 05.02.2026; entries reach the register about 1.5 months after the sale on average, so the last ~3 months are incomplete. The price is the gross price from the notarial deed; only sales of whole flats on the open market are included.