Kwadrato Gdańsk

This city's sales in the register end on 05.02.2026: the city publishes them late, so prices lag the market by several months.

Address · 80-180 · Ujeścisko-Łostowice

Płocka 93 sale prices and the building's surroundings

Typical price here
10,081 zł/m²
middle 50% of sales: 8,646 – 11,730 zł/m²
475 sales over 24 months · Radius 500 m
price per m² by quarter, 2023–2025: 8,711 → 11,328
Typical flat 55.9 m² ≈ 563,811 zł
≈ 2,698 zł per month with a 20% down payment and a 30-year mortgage
Compared with the city-17.6%
Change over the year+9.7%
Typical flat55.9 m²
Check a listing
Refine: rooms, floor, market

Location

Pros

  • separate cycle track 3 min away
  • bike-share station 3 min away
  • quiet: noise below 55 dB
  • lots of green space: 36% within 500 m
  • grocery shops within 500 m: 5

Things to watch out for

  • 40 min to the centre by public transport
Transport3/10
weak
40 min to the centre; rush-hour departures nearby: 112
Shops nearby3/10
weak
within 500 m grocery shops: 5, pharmacies: 1; doctors within 1 km: 3
Schools and kindergartens9/10
excellent
school 10 min away (exam 70%); kindergartens within 1 km: 18
Quiet10/10
excellent
noise below 55 dB
Green space6/10
average
36% green space within 500 m, park 19 min away
Low risk10/10
excellent
outside flood zones; road accidents with injuries nearby: 0
On the map:

Risks

  • noise below 55 dB according to the noise map
  • outside ISOK flood zones
  • NO₂ 13.6 µg/m³ per year — below the 2030 EU limit (20)
  • PM2.5 dust 13.6 µg/m³ a year — within the Polish limit of 20, but above the EU limit from 2030 (10)
  • no plants with a risk of a major accident (SEVESO) within 2 km
  • no plants of the PRTR pollutant register within 1 km
  • Road accidents with injuries nearby in 3 years: 0

Sources: the city's strategic noise map, ISOK flood maps (Wody Polskie), EEA annual air quality model (1 km), road accident data, SEVESO and PRTR registers (GIOŚ). The maps are a general guide, not a verdict on an individual building.

What may be built nearby

  • A local zoning plan (MPZP) is in force №XLI/1362/05 «MPZP Zakoniczyn na wschód od ulicy Unruga w mieście Gdańsku» — what can be built nearby is already set.
  • Allowed by the plan within 150 m: streets and roads (75 m); blocks of flats (119 m).
  • City general plan (POG) for this place: mixed zone with blocks of flats — draft (not in force yet), height up to 15 m, building coverage up to 35%, intensity up to 0.7, biologically active area from 40%.
  • No building permits found within 500 m in the last 3 years (GUNB register; some permits have no usable address and cannot be placed on the map).
All land uses within 150 m
  • single-family houses · 0 m
  • streets and roads · 75 m
  • blocks of flats · 119 m
  • utility networks · 137 m
  • parks, allotments, cemeteries · 138 m

What buying will cost

For a typical flat here — 563,811 zł, 55.9 m², 80% mortgage over 30 years at 5.98%.

Cash up front128,199 zł
Monthly payment2,698 zł
Taxes and notary15,436 zł

Calculate for your situation →

Why the price is what it is here

What affects the price here

How we calculate this

District Ujeścisko-Łostowice: similar flats here are on average cheaper by 17.8% compared with the city average.

Green space nearby · 36%+0.5%

Effect on the price per m² compared with similar flats in the same district, based on 2022–2026 sales. These are statistical links, not a guarantee for a specific flat.

Developer prices nearby
DevelopmentDistanceFlatsMedian zł/m²Change
ul. Bieszczadzka
KAJAR Investment Sp. z o.o.
1,032 m6710,500-11.1%
ul. Bieszczadzka
ROBYG Jabłoniowa Sp. z o.o.
1,032 m22710,695-6.9%
Warszawska
Euro Styl S.A.
1,237 m1414,290+3.5%
Warszawska 0
Euro Styl S.A.
1,237 m613,900+2%
Knyszyńska 16A
Litus Development 8 Sp. z o.o. Sp.k
1,384 m110,350—
Wielkopolska 53
Bravo Developer Sp. z o.o. Wielkopolska Sp. k.
1,443 m10512,635-1.8%

Asking prices from daily price lists (dane.gov.pl), 1.5 km radius.

What to check yourself before buying
  • Land and mortgage register (KW) — owner, mortgages, encumbrances: free of charge at ekw.ms.gov.pl.
  • Type of ownership — full ownership or cooperative right; share of the land in perpetual usufruct (annual fee).
  • Fees — fees to the owners' association, repair fund, any arrears of the previous owner.
  • Building — year built, condition of the roof and façade, planned repairs (owners' association minutes).
  • Flat — which way the windows face, ventilation, damp, window frames, heating.
  • For a new build — information prospectus, building permit, escrow bank account.
Location in detail: stops, schools, green space, sun

Location card

from the address

Transport

40 min to the centre at 7:45 on a weekday

  • Człuchowska 01 · 285 m · 5 departures 7–9 am
    118
  • Bramińskiego 01 · 364 m · 5 departures 7–9 am
    118
  • Bramińskiego 02 · 383 m · 5 departures 7–9 am
    118
  • Człuchowska 02 · 455 m · 5 departures 7–9 am
    118
  • Niepołomicka 02 · 523 m · 45 departures 7–9 am
    N1N2113155175176213255256262295N14
Time to other districts at 7:45: 3 of 35 within 30 min
Ujeścisko-Łostowice — your district6 min
Wzgórze Mickiewicza29 min
Chełm30 min
Piecki-Migowo32 min
Suchanino33 min
Jasień34 min
Orunia Górna-Gdańsk Południe35 min
Orunia-Św. Wojciech-Lipce37 min
Siedlce39 min
Śródmieście42 min
Kokoszki45 min
Młyniska45 min
Aniołki46 min
Brętowo46 min
Wrzeszcz Górny50 min
Letnica54 min
Nowy Port54 min
Wrzeszcz Dolny54 min
Zaspa Młyniec57 min
Strzyża59 min
Przeróbka60 min
Rudniki62 min
Stogi62 min
Oliwa63 min
Przymorze Małe63 min
Zaspa Rozstaje63 min
Brzeźno64 min
VII Dwór66 min
Przymorze Wielkie70 min
Żabianka-Wejhera-Jelitkowo-Tysiąclecia70 min
Matarnia74 min
Krakowiec-Górki Zachodnie79 min
Olszynka88 min
Wyspa Sobieszewska98 min
Osowa102 min

By public transport and on foot to where most of the district's addresses are; a weekday, by the timetable.

Schools and kindergartens

SZKOŁA PODSTAWOWA NR 12 IM. PRZYJACIÓŁ GDAŃSKA551 m70.5%
CHRZEŚCIJAŃSKA SZKOŁA MONTESSORI NR 2private613 m78.8%
PUBLICZNA SZKOŁA PODSTAWOWA FUTURI654 m—
PUBLICZNA SZKOŁA PODSTAWOWA "OLIMPIJCZYK" W GDAŃSKU Z ODDZIA761 m57.5%

The last column is the average 8th-grade exam result (Polish, maths, English), CKE. The city does not publish the school catchment area for each address — check at www.gdansk.pl/edukacja.

Kindergartens within 1 km: 18 (public: 8) · nearest: 3 min walk

Nearby

Grocery shops5 within 500 mnearest: 7 min walk
Pharmacies1 within 500 mnearest: 7 min walk
Doctors, clinics3 within 1 kmnearest: 13 min walk
Playgrounds16 within 500 mnearest: 3 min walk
Cafés and restaurants0 within 500 mnearest: 10 min walk
City bike hire3 within 500 mnearest: 3 min walk
Gyms0 within 1 kmnearest: 18 min walk
Park & Ride0 within 2 km
EV chargers0 within 1 km

Green space, noise, air

36% of the area within 500 m — parks, forests, lawns

Nearest green area: right nearby · park «Jar Wilanowski» — 1,095 m

Noise: roadsquiet (below 55 dB)
Noise: tramsquiet (below 55 dB)
Noise: railwayquiet (below 55 dB)
Noise: airportquiet (below 55 dB)
Noise: industryquiet (below 55 dB)

Strategic noise map, LDWN (24 h). Limit for blocks of flats: 68 dB from roads, trams and railways (70 dB in a big city's centre zone), 60 dB from aircraft, 55 dB from industry. WHO recommends up to 53 dB from roads.

Loading air quality…

Risks and restrictions

Flood once in 10 yearsno
Flood once in 100 yearsno
Flood once in 500 yearsno
Flood if a levee breaksno
Road accidents in 3 years, 300 m10
Paid parkingno

Flood zones — ISOK (Wody Polskie); 1 cell ≈ 7 m. Being in the Q1% zone affects insurance and mortgages.

What may be built nearby

Local zoning plan (MPZP)№XLI/1362/05 MPZP Zakoniczyn na wschód od ulicy Unruga w mieście Gdańsku · resolution
Land use within 150 m
023-M22 zabudowa mieszkaniowa ekstensywna
017-KD80 ulice dojazdowe · 75 m
01.1 MN teren zabudowy mieszkaniowej jednorodzinnej · 94 m
02.1 MW teren zabudowy mieszkaniowej wielorodzinnej · 119 m
072-W infrastruktura techniczna · 137 m
05.1 ZP teren zieleni urządzonej · 138 m
City general plan (POG)1670SW strefa wielofunkcyjna z zabudową mieszkaniową wielorodzinną
draft (not in force yet), height up to 15 m, building coverage up to 35%, intensity up to 0.7, biologically active area from 40%

MW — blocks of flats, MN — houses, U — services, ZP — parks, KD — roads.

Sun

Calculating…

Sources: GTFS, OpenStreetMap, city GIS, ISOK, GIOŚ, RSPO, CKE, GUGiK. Source status

Sales, charts and filters (743 sales)

Area: Radius 500 m · 743 sales with filters applied

Market
Rooms
Area, m²
Floor
Period
Median, 12 mo.
11,580 zł/m²
104 sales
Difference from the city, 12 mo.
-8.5%
city: 12,651 zł/m²
Difference from the district
-0.8%
Ujeścisko-Łostowice: 11,670 zł/m²
Change over the year
+9.7%
prices within the same market (new builds with new builds)
Median price
649,831 zł
area 57.1 m²
All time
9,504 zł/m²
743 sales · primary market 83%
Company buyers
2.9%
share of sales in 12 mo.

Median price per m² by quarter

The band is the middle 50% of sales in the area. Quarters with fewer than 3 sales in the area are skipped. The last quarter is incomplete.

Distribution of price per m²

5,000–6,000 zł/m²: 94 sales6,000–7,000 zł/m²: 4 sales7,000–8,000 zł/m²: 23 sales8,000–9,000 zł/m²: 171 sales9,000–10,000 zł/m²: 165 sales10,000–11,000 zł/m²: 90 sales11,000–12,000 zł/m²: 96 sales12,000–13,000 zł/m²: 58 sales13,000–14,000 zł/m²: 23 sales14,000–15,000 zł/m²: 19 sales56789101112131415

area median 9,504 zł/m² city median 12,651 zł/m² · k zł/m², 743 sales

Resales

33 sales — flats sold twice. Median price change +54.5% over a median of 8.8 mo. between deeds.

The first price mostly comes from the developer's handover deed and was agreed 1–3 years earlier, so the difference shows growth over a longer period.

AddressAreaBoughtPriceSoldPriceDifference
Przemyska 2792.505.12.2024508,67009.01.20261,270,000+149.7%
Przemyska 2564.303.01.2025360,24423.12.2025812,000+125.4%
Przemyska 3167.503.07.2025781,43923.12.2025960,000+22.9%
kmdr. Tadeusza Bramińskiego 643.428.04.2025483,36515.12.2025601,365+24.4%
Przemyska 3027.430.07.2025245,00003.12.2025380,000+55.1%
Przemyska 3535.426.05.2025480,00028.11.2025495,000+3.1%
Przemyska 2566.206.12.2024358,02818.11.2025685,000+91.3%
Przemyska 3156.509.12.2024319,37720.10.2025625,000+95.7%
Przemyska 2567.805.12.2024378,33808.09.2025700,000+85%
Przemyska 2741.704.12.2024241,43028.08.2025515,000+113.3%
Płocka 1255.925.06.2024840,00014.08.2025815,000-3%
Stanisława Dąbka 3336.429.11.2024323,00012.08.2025625,000+93.5%
Przemyska 3340.529.11.2024496,44601.08.2025520,000+4.7%
Przemyska 2983.113.11.2024458,91509.06.2025982,000+114%
kmdr. Tadeusza Bramińskiego 137.515.06.2023370,87205.06.2025550,000+48.3%
Przemyska 2976.120.11.2024400,20330.05.2025810,000+102.4%
kmdr. Tadeusza Bramińskiego 669.411.04.2024668,75129.05.2025959,000+43.4%
Płocka 147420.09.2023800,00015.05.2025880,000+10%
Przemyska 2758.413.11.2024329,31813.05.2025675,000+105%
Przemyska 3141.507.11.2024240,27324.03.2025536,000+123.1%
kmdr. Tadeusza Bramińskiego 245.628.08.2023390,78121.03.2025604,000+54.6%
kmdr. Tadeusza Bramińskiego 643.427.03.2024376,15514.03.2025622,500+65.5%
kmdr. Tadeusza Bramińskiego 558.107.12.2023557,41913.03.2025759,000+36.2%
kmdr. Tadeusza Bramińskiego 241.518.05.2023349,51223.12.2024500,000+43.1%
kmdr. Tadeusza Bramińskiego 354.826.05.2023433,61905.11.2024770,000+77.6%
kmdr. Tadeusza Bramińskiego 553.707.12.2023528,64030.10.2024730,000+38.1%
Płocka 1444.821.03.2024392,00008.08.2024479,000+22.2%
kmdr. Tadeusza Bramińskiego 245.725.05.2023381,39410.06.2024589,385+54.5%
Stanisława Dąbka 425.310.08.2023192,17901.02.2024325,000+69.1%
kmdr. Tadeusza Bramińskiego 354.830.05.2023481,65815.01.2024732,000+52%
kmdr. Tadeusza Bramińskiego 15514.06.2023452,97025.10.2023532,000+17.4%
kmdr. Tadeusza Bramińskiego 143.811.05.2023416,00413.10.2023552,500+32.8%
Płocka 551.724.03.2023450,00022.09.2023500,000+11.1%

Sales (743)

CSV
DateAddressFloorRoomsAreaPricezł/m²Market
16.01.2026Płocka 144357800,00014,023resale
14.01.2026Płocka 143244.5610,00013,714resale
09.01.2026Przemyska 274—92.51,270,00013,725resale
23.12.2025Przemyska 253—64.3812,00012,626resale
23.12.2025Przemyska 313—67.5960,00014,222resale
16.12.2025kmdr. Tadeusza Bramińskiego 104—69.5720,92210,376new
15.12.2025kmdr. Tadeusza Bramińskiego 63—43.4601,36513,847resale
15.12.2025Stanisława Dąbka 41234.5459,00013,297new
08.12.2025Przemyska 315—72.4424,8475,867new
08.12.2025Płocka 123240.3520,00012,900resale
08.12.2025Przemyska 334—45.1259,0505,748new
08.12.2025Przemyska 275—104.7572,4175,470new
08.12.2025Przemyska 334—44.9258,2085,749new
05.12.2025Płocka 951—160.21,370,0008,550new
03.12.2025Przemyska 303127.4380,00013,869resale
02.12.2025Płocka 142356.6650,00011,480resale
28.11.2025Przemyska 355235.4495,00013,987resale
18.11.2025Przemyska 251—66.2685,00010,352resale
13.11.2025Gorzowska 3A36103.51,037,50010,026resale
31.10.2025Płocka 102355.6700,00012,594resale
24.10.2025Zamojska 154452.2569,00010,902resale
22.10.2025Stanisława Dąbka 41225.6380,00014,844resale
20.10.2025Przemyska 311—56.5625,00011,054resale
08.10.2025kmdr. Tadeusza Bramińskiego 104—89.4998,77011,176new
02.10.2025Płocka 142130.3458,00015,135resale
17.09.2025kmdr. Tadeusza Bramińskiego 101—64.8643,7709,932new
11.09.2025kmdr. Tadeusza Bramińskiego 105—61.2671,15610,974new
08.09.2025Przemyska 254—67.8700,00010,332resale
08.09.2025Płocka 122357.1740,00012,967resale
02.09.2025Płocka 101347.5720,00015,171resale
28.08.2025Przemyska 274—41.7515,00012,344resale
18.08.2025Płocka 105246.7700,00015,005resale
14.08.2025Płocka 124355.9815,00014,572resale
12.08.2025Stanisława Dąbka 331—36.4625,00017,151resale
12.08.2025Przemyska 275—84.21,017,80312,092new
12.08.2025Przemyska 294—84.21,028,48412,219new
01.08.2025Przemyska 335—40.5520,00012,846resale
30.07.2025Przemyska 303127.4245,0008,942resale
30.07.2025Przemyska 335—84.11,066,09812,672new
18.07.2025Płocka 871—119.91,037,0008,646new
18.07.2025kmdr. Tadeusza Bramińskiego 82—89.3847,6389,487resale
16.07.2025kmdr. Tadeusza Bramińskiego 101—41.5508,77012,245new
16.07.2025kmdr. Tadeusza Bramińskiego 103—43.5503,79611,592new
14.07.2025kmdr. Tadeusza Bramińskiego 102—61678,37011,121new
10.07.2025Przemyska 333—72.6778,88310,725new
04.07.2025Stanisława Dąbka 24350.5570,00011,278resale
03.07.2025Przemyska 313—67.5781,43911,577new
03.07.2025Przemyska 331—58.5732,40712,528new
30.06.2025kmdr. Tadeusza Bramińskiego 103—47.2537,81011,399new
27.06.2025Płocka 101347.9735,00015,354resale
25.06.2025Płocka 931—160.41,386,0008,641new
23.06.2025Płocka 951—160.31,386,0008,645new
16.06.2025Płocka 931—160.61,340,0008,345new
11.06.2025Kaliska 3B1453.9670,00012,433resale
09.06.2025kmdr. Tadeusza Bramińskiego 102—69.4745,50010,736new
09.06.2025Przemyska 293—83.1982,00011,821resale
09.06.2025kmdr. Tadeusza Bramińskiego 105—89.5987,19111,035new
05.06.2025kmdr. Tadeusza Bramińskiego 14237.5550,00014,663resale
30.05.2025Przemyska 292—76.1810,00010,645resale
29.05.2025kmdr. Tadeusza Bramińskiego 63—69.4959,00013,824resale
28.05.2025kmdr. Tadeusza Bramińskiego 103—65700,96210,782new
28.05.2025Przemyska 354358.2500,0008,590resale
28.05.2025Płocka 114342.3490,00011,584resale
26.05.2025Przemyska 355235.4480,00013,563resale
26.05.2025Płocka 143130.1450,00014,965resale
20.05.2025kmdr. Tadeusza Bramińskiego 101—48.4531,77010,994new
15.05.2025Płocka 144474880,00011,885resale
13.05.2025Przemyska 274—58.4675,00011,552resale
12.05.2025Przemyska 311—86.5995,69711,511new
28.04.2025kmdr. Tadeusza Bramińskiego 63—43.4483,36511,130new
25.04.2025kmdr. Tadeusza Bramińskiego 105—41.5493,77011,907new
24.04.2025Płocka 7D3461.9620,00010,015resale
16.04.2025kmdr. Tadeusza Bramińskiego 104—45.7538,77011,779new
11.04.2025Przemyska 10B3351.1580,00011,350resale
02.04.2025Przemyska 274—64.4806,45612,523new
01.04.2025kmdr. Tadeusza Bramińskiego 101—43.4522,77012,048new
24.03.2025Przemyska 312—39.9474,83211,904new
24.03.2025Przemyska 315—41.5536,00012,916resale
24.03.2025Przemyska 294—72.3402,4795,564new
21.03.2025Płocka 144244.2552,00012,503resale
21.03.2025kmdr. Tadeusza Bramińskiego 24245.6604,00013,234resale
20.03.2025kmdr. Tadeusza Bramińskiego 101—47.1536,77011,396new
18.03.2025Płocka 891—134.21,180,0008,790new
18.03.2025Przemyska 301127.4340,00012,409resale
14.03.2025kmdr. Tadeusza Bramińskiego 102—64.9691,77010,666new
14.03.2025kmdr. Tadeusza Bramińskiego 62—43.4622,50014,357resale
13.03.2025Przemyska 184247.3725,00015,315resale
13.03.2025kmdr. Tadeusza Bramińskiego 55—58.1759,00013,066resale
10.03.2025Stanisława Dąbka 331—36.7339,5989,258new
10.03.2025kmdr. Tadeusza Bramińskiego 105—69.5767,77011,049new
05.03.2025Płocka 1051—134.21,200,0008,940new
03.03.2025Przemyska 24C1242.2499,00011,825resale
03.03.2025Przemyska 255—83.3917,47011,011new
26.02.2025Przemyska 254—62348,0955,614new
24.02.2025Przemyska 251—61.5649,66210,562new
21.02.2025Przemyska 271—40452,40911,299new
21.02.2025Kaliska 3C3473730,00010,003resale
19.02.2025kmdr. Tadeusza Bramińskiego 105—45.7549,68012,025new
18.02.2025Przemyska 291—83.6965,69211,550new
17.02.2025Przemyska 294—76.5424,5695,547new
14.02.2025Przemyska 295—59.9767,98612,817new
12.02.2025Stanisława Dąbka 333—44518,00011,786new
06.02.2025Kaliska 8B3360.4480,0007,948resale
06.02.2025Przemyska 302353.9660,00012,245resale
05.02.2025Płocka 1111—1201,090,0009,083new
03.02.2025Przemyska 351240.5520,00012,827resale
31.01.2025Stanisława Dąbka 331—54.3535,5689,863new
30.01.2025Stanisława Dąbka 332—50590,00011,800new
30.01.2025kmdr. Tadeusza Bramińskiego 61—89.1798,6358,961resale
30.01.2025Stanisława Dąbka 332—71.3890,00012,479new
29.01.2025Przemyska 312—64.2727,80411,338new
29.01.2025Płocka 143356.4680,00012,059resale
29.01.2025Przemyska 255—93.41,177,78712,610new
24.01.2025Płocka 125136430,00011,954resale
22.01.2025Przemyska 272—91.81,049,70011,437new
21.01.2025Przemyska 333—77.8905,93811,647new
21.01.2025Płocka 1231—134.41,246,9479,278new
17.01.2025Przemyska 254—40.3233,8565,806new
17.01.2025Przemyska 332—44.9542,85312,080new
17.01.2025Płocka 143357.4780,00013,582resale
16.01.2025kmdr. Tadeusza Bramińskiego 103—61697,77011,444new
16.01.2025kmdr. Tadeusza Bramińskiego 102—47543,77111,562new
15.01.2025Przemyska 312—41237,5915,796new
15.01.2025Przemyska 314—41.5240,2205,790new
13.01.2025Przemyska 293—41.3506,22612,248new
13.01.2025Stanisława Dąbka 333—45.4434,0009,553new
13.01.2025Stanisława Dąbka 331—44480,00010,902new
10.01.2025Przemyska 331—58.4661,42511,334new
08.01.2025Przemyska 313—36.8493,47713,402new
08.01.2025Przemyska 314—65.9791,74912,005new
03.01.2025Przemyska 314—67.3721,33410,712new
03.01.2025Stanisława Dąbka 171469.2820,00011,841resale
03.01.2025Przemyska 254—59.7336,1565,628new
03.01.2025Przemyska 253—64.3360,2445,602new
03.01.2025kmdr. Tadeusza Bramińskiego 105—65730,67211,238new
30.12.2024Przemyska 253—40.5213,0145,260new
30.12.2024Przemyska 252—39.8209,2275,260new
30.12.2024Przemyska 335—84.1486,1215,783new
30.12.2024Przemyska 292—40.1232,7525,809new
30.12.2024Przemyska 253—40.6213,5925,260new
30.12.2024Przemyska 292—41.3239,3265,792new
30.12.2024Przemyska 313—55.7315,1175,654new
30.12.2024Przemyska 314—40232,6475,809new
30.12.2024Przemyska 274—37.1217,1315,853new
30.12.2024Przemyska 273—40.6235,6975,801new
30.12.2024Przemyska 314—41.5240,4835,789new
30.12.2024Przemyska 253—40.3211,9625,260new
23.12.2024kmdr. Tadeusza Bramińskiego 22241.5500,00012,051resale
20.12.2024Stanisława Dąbka 332—94.2834,9438,861new
20.12.2024Stanisława Dąbka 331—71.9770,00010,708new
20.12.2024Płocka 143248.5630,00012,979resale
20.12.2024Przemyska 315—81.9923,90511,280new
19.12.2024Przemyska 264475.3750,0009,960resale
18.12.2024Przemyska 304483.3695,0008,343resale
18.12.2024Płocka 1291—133.51,250,0009,362new
18.12.2024Płocka 991—119.81,050,0008,768new
16.12.2024Przemyska 294—41.6218,8525,260new
16.12.2024Przemyska 311—57.6302,7435,260new
12.12.2024kmdr. Tadeusza Bramińskiego 104—61.1704,47011,532new
12.12.2024Przemyska 331—45544,98112,111new
12.12.2024Płocka 891—134.21,160,0008,646new
11.12.2024kmdr. Tadeusza Bramińskiego 104—47.1553,73811,752new
10.12.2024Płocka 1131—134.81,157,7448,589new
09.12.2024Stanisława Dąbka 332—44.1505,00011,451new
09.12.2024kmdr. Tadeusza Bramińskiego 105—48.4572,77011,832new
09.12.2024Przemyska 253—66.6768,04611,529new
09.12.2024Przemyska 311—56.5319,3775,649new
09.12.2024Przemyska 332—72.6760,17910,475new
06.12.2024Przemyska 295—40.3513,07912,716new
06.12.2024Stanisława Dąbka 332—45.7523,00011,457new
06.12.2024Przemyska 331—45533,69811,857new
06.12.2024Przemyska 333—45.1553,75212,270new
06.12.2024Przemyska 251—66.2358,0285,411new
06.12.2024Przemyska 293—76.1422,4665,549new
05.12.2024Stanisława Dąbka 332—36.4362,9459,963new
05.12.2024Przemyska 254—67.8378,3385,584new
05.12.2024Przemyska 293—71.2821,57911,533new
05.12.2024Stanisława Dąbka 333—36.8384,47010,462new
05.12.2024Przemyska 274—92.5508,6705,497new
05.12.2024Stanisława Dąbka 331—30.8274,2408,907new
05.12.2024Przemyska 335—77905,35611,756new
05.12.2024kmdr. Tadeusza Bramińskiego 104—48.4567,59711,720new
04.12.2024Przemyska 274—41.7241,4305,787new
04.12.2024Przemyska 272—40.2233,5415,807new
04.12.2024Przemyska 333—45.1570,10112,630new
04.12.2024kmdr. Tadeusza Bramińskiego 103—41.5484,49711,666new
04.12.2024Przemyska 252—37.4196,4995,260new
04.12.2024kmdr. Tadeusza Bramińskiego 104—41.5487,77011,748new
04.12.2024Przemyska 252—39.7230,7535,814new
04.12.2024Przemyska 253—40.4212,3305,260new
04.12.2024Przemyska 331—72.7732,56110,081new
03.12.2024Przemyska 252—65.9368,7125,593new
03.12.2024Przemyska 332—58.3657,10411,265new
03.12.2024Przemyska 334—77.7871,83411,225new
02.12.2024kmdr. Tadeusza Bramińskiego 104—43.5511,02611,740new
02.12.2024Płocka 1211—134.61,250,0009,284new
02.12.2024Przemyska 311—63.5356,2475,606new
02.12.2024Przemyska 272—57.9666,75111,508new
02.12.2024Przemyska 334—44.9536,91911,955new
02.12.2024kmdr. Tadeusza Bramińskiego 103—45.7520,77011,395new
02.12.2024Przemyska 273—41.7241,1675,788new
02.12.2024Stanisława Dąbka 333—34.5350,00010,136new
02.12.2024kmdr. Tadeusza Bramińskiego 101—60.8662,04010,882new
02.12.2024Przemyska 251—40252,5416,309new
02.12.2024Przemyska 252—59678,41511,495new
02.12.2024Przemyska 251—64.4706,42010,968new
02.12.2024kmdr. Tadeusza Bramińskiego 104—65733,08211,276new
29.11.2024Przemyska 335—43.8540,86312,334new
29.11.2024Przemyska 252—63.7345,0365,417new
29.11.2024Stanisława Dąbka 331—36.4323,0008,864new
29.11.2024Przemyska 252—39.8231,3325,812new
29.11.2024Przemyska 254—37.8199,0235,260new
29.11.2024Przemyska 291—76.2422,8345,548new
29.11.2024Przemyska 312—36.3507,21313,954new
29.11.2024Przemyska 332—77.5850,21310,965new
29.11.2024Przemyska 295—105.7612,8865,799new
29.11.2024Przemyska 254—40.5212,8565,260new
29.11.2024Przemyska 253—38199,7605,260new
29.11.2024Przemyska 255—77.2869,22811,261new
29.11.2024Przemyska 335—40.5496,44612,264new
29.11.2024Przemyska 334—58.6710,83012,128new
28.11.2024Przemyska 292—71.1395,8525,569new
28.11.2024kmdr. Tadeusza Bramińskiego 105—47.1541,77011,498new
28.11.2024Przemyska 335—55.8385,2216,910new
28.11.2024kmdr. Tadeusza Bramińskiego 101—89.3900,66410,082new
28.11.2024kmdr. Tadeusza Bramińskiego 105—43.5522,77012,023new
28.11.2024Przemyska 275—59.7737,81712,367new
28.11.2024Przemyska 332—43.8504,17611,498new
28.11.2024kmdr. Tadeusza Bramińskiego 102—45.7502,77010,997new
28.11.2024Przemyska 312—41.2499,01812,127new
28.11.2024Przemyska 333—45564,95112,543new
28.11.2024Przemyska 335—55.3313,1205,657new
28.11.2024kmdr. Tadeusza Bramińskiego 102—48.4540,54311,171new
28.11.2024Przemyska 331—45.1259,1025,748new
28.11.2024Stanisława Dąbka 331—45.8515,00011,257new
27.11.2024kmdr. Tadeusza Bramińskiego 103—48.4548,77011,329new
27.11.2024Przemyska 313—40.4247,5936,125new
27.11.2024Stanisława Dąbka 332—36.7415,00011,323new
27.11.2024Przemyska 273—92.6508,7765,497new
27.11.2024Stanisława Dąbka 333—93.8855,5309,120new
27.11.2024Przemyska 252—39.9209,7535,260new
27.11.2024Przemyska 255—53300,6535,675new
27.11.2024Przemyska 311—40232,4435,810new
27.11.2024Przemyska 272—41.2243,9585,914new
27.11.2024Przemyska 312—39.8231,5955,812new
27.11.2024Przemyska 314—56348,5906,224new
27.11.2024Przemyska 313—41.4239,6425,791new
26.11.2024Stanisława Dąbka 332—34.5343,2559,949new
26.11.2024Przemyska 314—40.5234,7505,803new
26.11.2024Stanisława Dąbka 333—49.8475,0009,546new
26.11.2024Stanisława Dąbka 333—36.3365,00010,047new
26.11.2024Przemyska 313—40.2233,5415,807new
26.11.2024Przemyska 311—77.2427,7785,545new
26.11.2024Przemyska 312—55.5313,8025,656new
26.11.2024Stanisława Dąbka 333—71.5794,45011,105new
25.11.2024Przemyska 251—40.3222,1195,508new
25.11.2024Przemyska 332—58.6717,80312,247new
25.11.2024Przemyska 251—41.1485,27111,807new
25.11.2024Przemyska 272—68.4382,0195,581new
25.11.2024Przemyska 252—66.4380,4475,726new
25.11.2024Przemyska 274—40.6235,6455,801new
25.11.2024kmdr. Tadeusza Bramińskiego 102—41.5478,77011,528new
25.11.2024Przemyska 291—71.3396,9045,568new
25.11.2024Przemyska 313—65.4366,2405,596new
25.11.2024Przemyska 253—67.6377,7065,585new
22.11.2024Przemyska 294—40.4503,80312,467new
22.11.2024Przemyska 254—40.5228,9095,655new
22.11.2024Przemyska 291—41.4480,40211,610new
22.11.2024Przemyska 292—56.5319,1675,649new
22.11.2024Przemyska 292—83.4460,7035,523new
22.11.2024Przemyska 253—59.6327,4205,495new
22.11.2024Przemyska 291—56.3318,3255,650new
22.11.2024Płocka 1011—119.61,040,0008,694new
22.11.2024Przemyska 315—40.5234,9085,803new
22.11.2024Płocka 1291—134.71,250,0009,279new
22.11.2024Płocka 1011—123.11,069,0008,682new
21.11.2024Płocka 971—1601,410,0008,811new
21.11.2024Przemyska 255—58305,0045,260new
21.11.2024Przemyska 273—37.1194,9735,260new
21.11.2024Przemyska 275—40.3478,33711,855new
21.11.2024Przemyska 273—58.2624,65610,737new
21.11.2024Przemyska 271—58305,1095,260new
21.11.2024Przemyska 251—90.5475,8895,260new
21.11.2024Przemyska 315—78.3914,75311,689new
20.11.2024Przemyska 315—87.61,032,30311,791new
20.11.2024Przemyska 314—65.5366,5035,595new
20.11.2024Przemyska 294—56.6297,9045,260new
20.11.2024Przemyska 334—58.4656,05911,228new
20.11.2024Przemyska 254—64.3738,52511,493new
20.11.2024Płocka 1031—1201,073,7138,950new
20.11.2024Płocka 1031—135.41,146,9468,472new
20.11.2024Przemyska 331—73.2756,52510,332new
20.11.2024Przemyska 272—41.3459,52211,137new
20.11.2024Płocka 1271—134.31,250,0009,307new
20.11.2024Przemyska 333—58.5697,76511,930new
20.11.2024Przemyska 292—76.1400,2035,260new
20.11.2024kmdr. Tadeusza Bramińskiego 102—43.5478,77011,011new
20.11.2024Przemyska 313—65.8724,00711,000new
19.11.2024Przemyska 312—65.6770,65011,753new
19.11.2024Przemyska 271—41.1490,20511,924new

Showing 300 most recent. All 743 — in the CSV.

Data: Rejestr Cen Nieruchomości (GUGiK), PRG addresses, district boundaries from the city's open data or OpenStreetMap. Sales up to 05.02.2026; entries reach the register about 1.5 months after the sale on average, so the last ~3 months are incomplete. The price is the gross price from the notarial deed; only sales of whole flats on the open market are included.