Kwadrato Gdańsk

This city's sales in the register end on 05.02.2026: the city publishes them late, so prices lag the market by several months.

Address · 80-871 · Młyniska

Twarda 18D sale prices and the building's surroundings

Typical price here
16,372 zł/m²
middle 50% of sales: 14,756 – 17,815 zł/m²
594 sales over 24 months · District Młyniska
price per m² by quarter, 2022–2025: 8,596 → 12,172
Typical flat 46.7 m² ≈ 764,670 zł
≈ 3,660 zł per month with a 20% down payment and a 30-year mortgage
Compared with the city+33.9%
Change over the year-3%
Typical flat46.7 m²
Check a listing
Refine: rooms, floor, market

Location

Pros

  • tram 3 min away
  • separate cycle track 3 min away
  • bike-share station 3 min away
  • quiet: noise below 55 dB
  • grocery shops within 500 m: 8

Things to watch out for

No obvious drawbacks found.

    Transport8/10
    good
    22 min to the centre; rush-hour departures nearby: 500
    Shops nearby3/10
    weak
    within 500 m grocery shops: 8, pharmacies: 0; doctors within 1 km: 5
    Schools and kindergartens6/10
    average
    school 7 min away (exam 51%); kindergartens within 1 km: 2
    Quiet10/10
    excellent
    noise below 55 dB
    Green space4/10
    weak
    9% green space within 500 m, park 8 min away
    Low risk9/10
    excellent
    outside flood zones; road accidents with injuries nearby: 2
    On the map:

    Risks

    • noise below 55 dB according to the noise map
    • outside ISOK flood zones
    • NO₂ 14.1 µg/m³ per year — below the 2030 EU limit (20)
    • PM2.5 dust 14.1 µg/m³ a year — within the Polish limit of 20, but above the EU limit from 2030 (10)
    • no plants with a risk of a major accident (SEVESO) within 2 km
    • plant of the PRTR pollutant register 549 m away: machinery and equipment
    • Road accidents with injuries nearby in 3 years: 2

    Sources: the city's strategic noise map, ISOK flood maps (Wody Polskie), EEA annual air quality model (1 km), road accident data, SEVESO and PRTR registers (GIOŚ). The maps are a general guide, not a verdict on an individual building.

    What may be built nearby

    • A local zoning plan (MPZP) is in force №XLV/1378/02 «MPZP Młyniska - Letnica w Gdańsku w mieście Gdańsku» — what can be built nearby is already set.
    • Allowed by the plan within 150 m: blocks of flats (0 m); streets and roads (50 m); services: shops, offices, venues (67 m); industry, warehouses, business (101 m).
    • City general plan (POG) for this place: mixed zone with blocks of flats — draft (not in force yet), height up to 19 m, building coverage up to 50%, intensity up to 1.5, biologically active area from 20%.
    • Building permits within 500 m in the last 3 years (GUNB): 3 — services and offices 1, industry and warehouses 2.
      • hotel or dormitory, new building · 304 m · permit 03.01.2024
        BUDOWA obiektu hotelowego z halą garażową w kondygnacji podziemnej, wbudowaną stacją trafo i rozdzielnią elektryczną
      • industry or warehouse, extension · 369 m · permit 05.11.2025
        Rozbudowa budynku hali C-167 i C-167d w zakresie montażu bramy zewnętrznej wraz z jej podkonstrukcją
      • industry or warehouse, new building · 420 m · permit 13.02.2026
        Budowa silników gazowych o łacznej mocy w paliwie 85MW w PGE Energia Ciepła SA Oddział Wybrzeże na terenie Elektrociepłowni Gdańsk
    All land uses within 150 m
    • blocks of flats · 0 m
    • streets and roads · 50 m
    • services: shops, offices, venues · 67 m
    • industry, warehouses, business · 101 m

    What buying will cost

    For a typical flat here — 764,670 zł, 46.7 m², 80% mortgage over 30 years at 5.98%.

    Cash up front173,178 zł
    Monthly payment3,660 zł
    Taxes and notary20,244 zł

    Calculate for your situation →

    Why the price is what it is here

    What affects the price here

    How we calculate this

    District Młyniska: similar flats here are on average pricier by 27.2% compared with the city average.

    Green space nearby · 9%-0.1%

    Effect on the price per m² compared with similar flats in the same district, based on 2022–2026 sales. These are statistical links, not a guarantee for a specific flat.

    What to check yourself before buying
    • Land and mortgage register (KW) — owner, mortgages, encumbrances: free of charge at ekw.ms.gov.pl.
    • Type of ownership — full ownership or cooperative right; share of the land in perpetual usufruct (annual fee).
    • Fees — fees to the owners' association, repair fund, any arrears of the previous owner.
    • Building — year built, condition of the roof and façade, planned repairs (owners' association minutes).
    • Flat — which way the windows face, ventilation, damp, window frames, heating.
    • For a new build — information prospectus, building permit, escrow bank account.
    Location in detail: stops, schools, green space, sun

    Location card

    from the address

    Transport

    22 min to the centre at 7:45 on a weekday

    • Węzeł Kliniczna 05 · 121 m · 3 departures 7–9 am
      283
    • Węzeł Kliniczna 03 · 130 m · 12 departures 7–9 am
      58
    • Twarda 01 · 140 m · 46 departures 7–9 am
      2378
    • Węzeł Kliniczna 01 · 157 m · 23 departures 7–9 am
      2710
    • Węzeł Kliniczna 02 · 158 m · 17 departures 7–9 am
      3710
    Time to other districts at 7:45: 22 of 35 within 30 min
    Młyniska — your district2 min
    Letnica14 min
    Nowy Port14 min
    Wrzeszcz Dolny14 min
    Aniołki18 min
    Zaspa Młyniec21 min
    Orunia-Św. Wojciech-Lipce22 min
    Wrzeszcz Górny22 min
    Śródmieście23 min
    Brzeźno24 min
    Suchanino25 min
    VII Dwór25 min
    Oliwa26 min
    Przymorze Małe26 min
    Siedlce26 min
    Strzyża26 min
    Stogi28 min
    Zaspa Rozstaje28 min
    Chełm29 min
    Przeróbka30 min
    Przymorze Wielkie30 min
    Żabianka-Wejhera-Jelitkowo-Tysiąclecia30 min
    Olszynka33 min
    Wzgórze Mickiewicza33 min
    Brętowo34 min
    Piecki-Migowo34 min
    Krakowiec-Górki Zachodnie37 min
    Orunia Górna-Gdańsk Południe39 min
    Rudniki42 min
    Jasień44 min
    Kokoszki45 min
    Ujeścisko-Łostowice46 min
    Matarnia49 min
    Osowa62 min
    Wyspa Sobieszewska98 min

    By public transport and on foot to where most of the district's addresses are; a weekday, by the timetable.

    Schools and kindergartens

    SZKOŁA PODSTAWOWA NR 69 IM GENERAŁA STANISŁAWA SOSABOWSKIEGO388 m50.8%
    CENTRUM KSZTAŁCENIA ZAWODOWEGO I USTAWICZNEGO NR 1 SZKOŁA PO853 m—
    NIEPUBLICZNA SZKOŁA PODSTAWOWA MENTAL ARTSprivate884 m76.5%
    SZKOŁA PODSTAWOWA NR 15 IM. DR URSZULI MROCZKIEWICZ W GDAŃSK1,014 m75.6%

    The last column is the average 8th-grade exam result (Polish, maths, English), CKE. The city does not publish the school catchment area for each address — check at www.gdansk.pl/edukacja.

    Kindergartens within 1 km: 2 (public: 1) · nearest: 13 min walk

    Universities

    Uniwersytet Gdański 2.6 km14 min
    Politechnika Gdańska 957 m13 min
    Gdański Uniwersytet Medyczny 1 km16 min
    Uniwersytet WSB Merito w Gdańsku non-public3.5 km21 min
    Akademia Wychowania Fizycznego i Sportu im. Jędrzeja Śniadec 6.7 km27 min

    The city's largest institutions by full-time students. Distance is a straight line to the nearest building of the institution; time is by public transport and on foot at 7:45 on a weekday.

    Nearby

    Grocery shops8 within 500 mnearest: 2 min walk
    Pharmacies0 within 500 mnearest: 17 min walk
    Doctors, clinics5 within 1 kmnearest: 2 min walk
    Playgrounds4 within 500 mnearest: 1 min walk
    Cafés and restaurants2 within 500 mnearest: 7 min walk
    City bike hire5 within 500 mnearest: 3 min walk
    Gyms0 within 1 kmnearest: 21 min walk
    Park & Ride0 within 2 km
    EV chargers0 within 1 km

    Green space, noise, air

    9% of the area within 500 m — parks, forests, lawns

    Nearest green area: 2 min walk · park «Park im. Steffensów» — 431 m

    Noise: roadsquiet (below 55 dB)
    Noise: tramsquiet (below 55 dB)
    Noise: railwayquiet (below 55 dB)
    Noise: airportquiet (below 55 dB)
    Noise: industryquiet (below 55 dB)

    Strategic noise map, LDWN (24 h). Limit for blocks of flats: 68 dB from roads, trams and railways (70 dB in a big city's centre zone), 60 dB from aircraft, 55 dB from industry. WHO recommends up to 53 dB from roads.

    Loading air quality…

    Risks and restrictions

    Flood once in 10 yearsno
    Flood once in 100 yearsno
    Flood once in 500 yearsno
    Flood if a levee breaksno
    Road accidents in 3 years, 300 m38 · with injuries: 2
    Paid parkingno

    Flood zones — ISOK (Wody Polskie); 1 cell ≈ 7 m. Being in the Q1% zone affects insurance and mortgages.

    What may be built nearby

    Local zoning plan (MPZP)№XLV/1378/02 MPZP Młyniska - Letnica w Gdańsku w mieście Gdańsku · resolution
    Land use within 150 m
    040-32 zabudowa mieszkaniowo-usługowa
    079-81 ulice lokalne · 50 m
    042-33 zabudowa usługowa komercyjna i publiczna · 67 m
    111-83 ulice główne, ulice główne przyspieszone · 76 m
    001-P/U41 zabudowa produkcyjno - usługowo-składowa · 101 m
    City general plan (POG)988SW strefa wielofunkcyjna z zabudową mieszkaniową wielorodzinną
    draft (not in force yet), height up to 19 m, building coverage up to 50%, intensity up to 1.5, biologically active area from 20%

    MW — blocks of flats, MN — houses, U — services, ZP — parks, KD — roads.

    Sun

    Calculating…

    Sources: GTFS, OpenStreetMap, city GIS, ISOK, GIOŚ, RSPO, CKE, RAD-on, GUGiK. Source status

    Sales, charts and filters (829 sales)

    Area: District Młyniska · 829 sales with filters applied

    Market
    Rooms
    Area, m²
    Floor
    Period
    Median, 12 mo.
    15,407 zł/m²
    73 sales
    Difference from the city, 12 mo.
    +21.8%
    city: 12,651 zł/m²
    Change over the year
    -3%
    prices within the same market (new builds with new builds)
    Median price
    680,000 zł
    area 45.3 m²
    All time
    15,564 zł/m²
    829 sales · primary market 85.5%
    Company buyers
    4.1%
    share of sales in 12 mo.

    Median price per m² by quarter

    The band is the middle 50% of sales in the area. Quarters with fewer than 3 sales in the area are skipped. The last quarter is incomplete.

    Distribution of price per m²

    8,000–9,000 zł/m²: 12 sales9,000–10,000 zł/m²: 12 sales10,000–11,000 zł/m²: 19 sales11,000–12,000 zł/m²: 32 sales12,000–13,000 zł/m²: 77 sales13,000–14,000 zł/m²: 92 sales14,000–15,000 zł/m²: 117 sales15,000–16,000 zł/m²: 105 sales16,000–17,000 zł/m²: 124 sales17,000–18,000 zł/m²: 97 sales18,000–19,000 zł/m²: 84 sales19,000–20,000 zł/m²: 22 sales20,000–21,000 zł/m²: 15 sales21,000–22,000 zł/m²: 11 sales22,000–23,000 zł/m²: 10 sales891011121314151617181920212223

    area median 15,564 zł/m² city median 12,651 zł/m² · k zł/m², 829 sales

    Resales

    33 sales — flats sold twice. Median price change +28.5% over a median of 7.4 mo. between deeds.

    The first price mostly comes from the developer's handover deed and was agreed 1–3 years earlier, so the difference shows growth over a longer period.

    AddressAreaBoughtPriceSoldPriceDifference
    ks. Jerzego Popiełuszki 241.407.04.2025670,75016.12.2025895,000+33.4%
    ks. Jerzego Popiełuszki 24129.11.2024665,79505.12.2025750,000+12.6%
    ks. Jerzego Popiełuszki 236.204.12.2024664,41028.11.2025660,000-0.7%
    ks. Jerzego Popiełuszki 2270.808.08.20241,110,68106.10.20251,242,000+11.8%
    ks. Jerzego Popiełuszki 253.504.03.2025940,16805.09.20251,200,000+27.6%
    ks. Jerzego Popiełuszki 264.528.11.2024920,68301.08.20251,500,000+62.9%
    ks. Jerzego Popiełuszki 2678.721.02.2024969,42328.07.20251,042,000+7.5%
    ks. Jerzego Popiełuszki 262.302.12.2024926,44907.07.20251,345,000+45.2%
    ks. Jerzego Popiełuszki 229.922.11.2024456,37404.07.2025680,000+49%
    ks. Jerzego Popiełuszki 24125.109.10.20231,825,39803.07.20252,809,000+53.9%
    ks. Jerzego Popiełuszki 290.129.11.20241,429,49901.07.20251,662,649+16.3%
    Okrąg 2/443.412.12.2024645,00023.06.2025595,000-7.8%
    ks. Jerzego Popiełuszki 2282.528.10.20241,276,10226.05.20251,377,000+7.9%
    ks. Jerzego Popiełuszki 2282.307.11.20241,332,88216.05.20251,562,000+17.2%
    Mikołaja Reja 30C4204.12.2024430,00014.01.2025548,000+27.4%
    ks. Jerzego Popiełuszki 24117.626.09.20231,603,45308.01.20252,892,000+80.4%
    Okrąg 2/443.414.06.2024395,00012.12.2024645,000+63.3%
    ks. Jerzego Popiełuszki 2260.911.07.2024975,91503.12.20241,482,000+51.9%
    ks. Jerzego Popiełuszki 2451.510.11.2023832,37129.11.20241,312,000+57.6%
    ks. Jerzego Popiełuszki 2260.816.07.2024877,10725.11.20241,040,000+18.6%
    ks. Jerzego Popiełuszki 2476.919.10.20231,114,24022.11.20241,210,500+8.6%
    ks. Jerzego Popiełuszki 24117.303.01.20241,680,33415.11.20242,160,000+28.5%
    ks. Jerzego Popiełuszki 244928.09.2023772,76905.11.2024892,000+15.4%
    ks. Jerzego Popiełuszki 2425.628.11.2023382,00010.09.2024717,000+87.7%
    ks. Jerzego Popiełuszki 2653.322.09.2023693,66610.06.20241,092,000+57.4%
    ks. Jerzego Popiełuszki 2456.906.12.2023620,71222.05.20241,080,000+74%
    ks. Jerzego Popiełuszki 2478.313.10.2023990,92911.04.20241,400,000+41.3%
    ks. Jerzego Popiełuszki 2644.227.09.2023590,26126.03.2024848,000+43.7%
    ks. Jerzego Popiełuszki 2458.212.10.2023657,33326.03.20241,027,000+56.2%
    ks. Jerzego Popiełuszki 2425.624.10.2023378,35028.11.2023382,000+1%
    Twarda 3A43.105.10.2022385,00021.09.2023408,000+6%
    Mikołaja Reja 26B41.304.05.2023395,00007.09.2023470,000+19%
    Twarda 5D4412.10.2022320,00014.06.2023546,000+70.6%

    Sales (829)

    CSV
    DateAddressFloorRoomsAreaPricezł/m²Market
    02.01.2026Mikołaja Reja 24C11343.2630,00014,583resale
    16.12.2025ks. Jerzego Popiełuszki 25—41.4895,00021,613resale
    05.12.2025ks. Jerzego Popiełuszki 27—41750,00018,270resale
    28.11.2025Marynarki Polskiej 138A4341.6440,00010,577resale
    28.11.2025ks. Jerzego Popiełuszki 210—36.2660,00018,237resale
    28.11.2025Twarda 5B2342.7395,0009,244resale
    25.11.2025ks. Jerzego Popiełuszki 212—90.41,650,00018,252new
    24.11.2025Okrąg 18/201464.2600,0009,352resale
    14.11.2025Twarda 5A3—42.6450,00010,563resale
    12.11.2025Twarda 1C1343.5446,75010,270resale
    23.10.2025Marynarki Polskiej 138A5453.4650,00012,172resale
    22.10.2025ks. Jerzego Popiełuszki 223—82.41,361,94716,534new
    20.10.2025Twarda 5B—342.9350,0008,159resale
    17.10.2025ks. Jerzego Popiełuszki 211—80.91,400,20517,308new
    10.10.2025ks. Jerzego Popiełuszki 27—85.21,194,50014,022new
    10.10.2025Mikołaja Reja 24D6335.7420,00011,765resale
    06.10.2025ks. Jerzego Popiełuszki 225—70.81,242,00017,540resale
    02.10.2025Mikołaja Reja 26C——42400,0009,533resale
    26.09.2025ks. Jerzego Popiełuszki 212—150.22,820,80418,780new
    26.09.2025Twarda 18B3225.8350,00013,566resale
    19.09.2025ks. Jerzego Popiełuszki 228—771,107,79614,385new
    05.09.2025ks. Jerzego Popiełuszki 212—53.51,200,00022,409resale
    25.08.2025Marynarki Polskiej 1425456730,00013,047resale
    20.08.2025Mikołaja Reja 24B4342.5550,00012,941resale
    19.08.2025Twarda 18C3—41.9475,00011,326resale
    01.08.2025ks. Jerzego Popiełuszki 25—64.51,500,00023,259resale
    01.08.2025Mikołaja Reja 24A3344.5545,00012,247resale
    28.07.2025ks. Jerzego Popiełuszki 262—78.71,042,00013,235resale
    10.07.2025Zielony Trójkąt 4A2343.3510,00011,778resale
    07.07.2025ks. Jerzego Popiełuszki 22—62.31,345,00021,596resale
    04.07.2025ks. Jerzego Popiełuszki 22—29.9680,00022,750resale
    03.07.2025ks. Jerzego Popiełuszki 249—125.12,809,00022,461resale
    01.07.2025ks. Jerzego Popiełuszki 210—90.11,662,64918,464resale
    24.06.2025ks. Jerzego Popiełuszki 211—63.81,080,00016,925new
    23.06.2025Okrąg 2/42243.4595,00013,716resale
    17.06.2025Mikołaja Reja 30D3442.1527,50012,530resale
    11.06.2025ks. Jerzego Popiełuszki 224—49.1765,95715,609new
    04.06.2025ks. Jerzego Popiełuszki 23—29.8570,84219,143new
    04.06.2025ks. Jerzego Popiełuszki 224—82.51,380,97416,737new
    27.05.2025ks. Jerzego Popiełuszki 224—70.81,184,14716,718new
    26.05.2025ks. Jerzego Popiełuszki 228—82.51,377,00016,693resale
    21.05.2025ks. Jerzego Popiełuszki 223—82.61,395,97816,896new
    16.05.2025ks. Jerzego Popiełuszki 222—82.31,562,00018,968resale
    14.05.2025Marynarki Polskiej 136A2341.6450,00010,817resale
    09.05.2025ks. Jerzego Popiełuszki 25—41.4623,87815,070new
    09.05.2025ks. Jerzego Popiełuszki 212—82.91,527,97118,429new
    05.05.2025ks. Jerzego Popiełuszki 29—76.11,097,25114,420new
    28.04.2025Zielony Trójkąt 4C5342.4546,00012,877resale
    15.04.2025ks. Jerzego Popiełuszki 212—74.61,478,60319,831new
    08.04.2025ks. Jerzego Popiełuszki 22—81.31,146,36914,106new
    07.04.2025ks. Jerzego Popiełuszki 25—41.4670,75016,198new
    07.04.2025Marynarki Polskiej 1349335.2448,00012,727resale
    07.04.2025ks. Jerzego Popiełuszki 25—41.4667,56516,136new
    07.04.2025Zielony Trójkąt 4D3—43.3470,00010,855resale
    07.04.2025ks. Jerzego Popiełuszki 222—45.3952,46221,044new
    02.04.2025Mikołaja Reja 28C2442.3569,00013,452resale
    29.03.2025Twarda 194228.7420,00014,655resale
    28.03.2025Marynarki Polskiej 138A10341.6557,00013,389resale
    21.03.2025Mikołaja Reja 24F6226.5399,00015,057resale
    19.03.2025ks. Jerzego Popiełuszki 26—85.21,178,08313,834new
    10.03.2025ks. Jerzego Popiełuszki 224—82.21,380,04516,779new
    06.03.2025ks. Jerzego Popiełuszki 26—82.41,356,45516,452new
    04.03.2025ks. Jerzego Popiełuszki 212—53.5940,16817,557new
    28.02.2025ks. Jerzego Popiełuszki 211—52.3913,32417,473new
    27.02.2025ks. Jerzego Popiełuszki 24—29.8530,38617,816new
    21.02.2025ks. Jerzego Popiełuszki 27—61.8924,20414,947new
    20.02.2025ks. Jerzego Popiełuszki 28—29.8580,90119,500new
    19.02.2025ks. Jerzego Popiełuszki 225—82.51,335,25716,181new
    17.02.2025Mikołaja Reja 24F3—26.5415,00815,661resale
    13.02.2025Twarda 173—47.5420,0008,850new
    13.02.2025ks. Jerzego Popiełuszki 27—28.9507,36517,568new
    10.02.2025Mikołaja Reja 24D5—42.5475,00011,176resale
    07.02.2025ks. Jerzego Popiełuszki 210—58.8906,06315,407new
    31.01.2025ks. Jerzego Popiełuszki 23—41.5714,68917,226new
    30.01.2025ks. Jerzego Popiełuszki 27—54.6856,61615,686new
    30.01.2025ks. Jerzego Popiełuszki 26—54.5804,20514,751new
    29.01.2025ks. Jerzego Popiełuszki 222—66.91,067,77315,951new
    29.01.2025ks. Jerzego Popiełuszki 25—29.6572,86119,353new
    29.01.2025ks. Jerzego Popiełuszki 227—82.41,429,70617,355new
    28.01.2025ks. Jerzego Popiełuszki 223—82.21,378,63216,768new
    27.01.2025ks. Jerzego Popiełuszki 228—103.62,061,50419,891new
    23.01.2025ks. Jerzego Popiełuszki 212—92.11,909,43220,734new
    23.01.2025ks. Jerzego Popiełuszki 211—89.91,817,25520,207new
    21.01.2025Twarda 1B2341545,00013,293resale
    20.01.2025ks. Jerzego Popiełuszki 228—25.5533,82020,893new
    17.01.2025ks. Jerzego Popiełuszki 24—54.4777,62414,284new
    17.01.2025ks. Jerzego Popiełuszki 26—30.5529,04417,357new
    16.01.2025ks. Jerzego Popiełuszki 28—64.2943,05014,685new
    16.01.2025ks. Jerzego Popiełuszki 223—77.61,262,84016,265new
    15.01.2025ks. Jerzego Popiełuszki 28—61.8922,07014,920new
    15.01.2025Twarda 5C1342.9575,00013,403resale
    14.01.2025Mikołaja Reja 30C2442548,00013,048resale
    14.01.2025ks. Jerzego Popiełuszki 26—81.31,390,80017,115new
    14.01.2025ks. Jerzego Popiełuszki 23—62.51,005,52916,086new
    14.01.2025ks. Jerzego Popiełuszki 24—62.51,004,53116,072new
    14.01.2025ks. Jerzego Popiełuszki 210—58.6958,38016,352new
    13.01.2025ks. Jerzego Popiełuszki 28—41.2720,25317,482new
    13.01.2025ks. Jerzego Popiełuszki 26—61.8912,89714,779new
    13.01.2025ks. Jerzego Popiełuszki 25—41.3679,11416,432new
    10.01.2025ks. Jerzego Popiełuszki 27—36.3646,93617,812new
    10.01.2025ks. Jerzego Popiełuszki 28—41.2730,86117,735new
    09.01.2025ks. Jerzego Popiełuszki 227—67.11,057,66515,767new
    09.01.2025ks. Jerzego Popiełuszki 224—771,217,89515,825new
    09.01.2025Marynarki Polskiej 1404336.3510,00014,050resale
    08.01.2025ks. Jerzego Popiełuszki 249—117.62,892,00024,600resale
    07.01.2025ks. Jerzego Popiełuszki 29—59.1829,70514,034new
    03.01.2025ks. Jerzego Popiełuszki 25—31503,00816,237new
    03.01.2025ks. Jerzego Popiełuszki 25—29.8494,41516,569new
    02.01.2025ks. Jerzego Popiełuszki 25—36.3605,84016,681new
    30.12.2024ks. Jerzego Popiełuszki 22—46.6762,06216,353new
    30.12.2024ks. Jerzego Popiełuszki 27—41.2692,34216,804new
    30.12.2024ks. Jerzego Popiełuszki 25—811,376,79816,995new
    30.12.2024ks. Jerzego Popiełuszki 25—40.8685,69716,810new
    30.12.2024ks. Jerzego Popiełuszki 26—40.7687,52116,880new
    30.12.2024ks. Jerzego Popiełuszki 27—68.4949,44213,879new
    30.12.2024ks. Jerzego Popiełuszki 23—29.5488,33416,542new
    30.12.2024ks. Jerzego Popiełuszki 24—29.6508,81517,172new
    30.12.2024ks. Jerzego Popiełuszki 26—68.4944,81613,813new
    30.12.2024ks. Jerzego Popiełuszki 28—41647,11315,779new
    30.12.2024Marynarki Polskiej 1428—35.7400,00011,204resale
    30.12.2024ks. Jerzego Popiełuszki 23—81.21,191,27014,667new
    27.12.2024ks. Jerzego Popiełuszki 22—39.7603,28915,208new
    27.12.2024ks. Jerzego Popiełuszki 22—30.5538,67917,679new
    27.12.2024ks. Jerzego Popiełuszki 29—61.9980,64215,847new
    27.12.2024ks. Jerzego Popiełuszki 22—49.6702,41214,156resale
    27.12.2024ks. Jerzego Popiełuszki 27—64.3937,13414,570new
    27.12.2024ks. Jerzego Popiełuszki 26—62.51,004,13216,066new
    27.12.2024ks. Jerzego Popiełuszki 24—64.4903,93214,045new
    27.12.2024ks. Jerzego Popiełuszki 23—30.7476,08615,518new
    27.12.2024ks. Jerzego Popiełuszki 28—46.7723,46315,508new
    23.12.2024ks. Jerzego Popiełuszki 29—57.3848,05514,811new
    23.12.2024ks. Jerzego Popiełuszki 25—61.9920,74414,872new
    23.12.2024ks. Jerzego Popiełuszki 27—38.2540,67314,150new
    23.12.2024ks. Jerzego Popiełuszki 27—46.7729,30015,620new
    23.12.2024ks. Jerzego Popiełuszki 22—40.8622,94015,268new
    23.12.2024ks. Jerzego Popiełuszki 25—851,186,22513,957new
    23.12.2024ks. Jerzego Popiełuszki 26—29.6559,28918,869new
    20.12.2024ks. Jerzego Popiełuszki 23—41.5715,34217,216new
    20.12.2024ks. Jerzego Popiełuszki 28—38.5549,02014,268new
    20.12.2024ks. Jerzego Popiełuszki 25—29.1485,50116,707new
    20.12.2024ks. Jerzego Popiełuszki 24—36.2599,64916,569new
    20.12.2024ks. Jerzego Popiełuszki 22—46.8690,34414,757new
    20.12.2024ks. Jerzego Popiełuszki 28—851,255,98714,778new
    20.12.2024ks. Jerzego Popiełuszki 24—57.3801,42213,989new
    20.12.2024ks. Jerzego Popiełuszki 25—46.7692,46214,837new
    19.12.2024ks. Jerzego Popiełuszki 23—36.3621,97817,130new
    19.12.2024ks. Jerzego Popiełuszki 28—30.5560,47618,376new
    19.12.2024ks. Jerzego Popiełuszki 24—36.5637,33517,480new
    19.12.2024ks. Jerzego Popiełuszki 28—40.7672,39716,509new
    19.12.2024Mikołaja Reja 24F9335440,00012,571resale
    18.12.2024ks. Jerzego Popiełuszki 27—41.5698,08116,837new
    18.12.2024ks. Jerzego Popiełuszki 29—90.21,354,79815,022new
    18.12.2024ks. Jerzego Popiełuszki 23—29.1434,04414,916new
    18.12.2024ks. Jerzego Popiełuszki 23—62864,47313,952new
    18.12.2024ks. Jerzego Popiełuszki 27—40.8672,76016,497new
    18.12.2024ks. Jerzego Popiełuszki 23—46.5775,85116,678new
    17.12.2024ks. Jerzego Popiełuszki 24—851,145,87213,487new
    17.12.2024ks. Jerzego Popiełuszki 25—38.5531,48213,801new
    17.12.2024ks. Jerzego Popiełuszki 24—46.4744,92916,068new
    16.12.2024ks. Jerzego Popiełuszki 210—52.3919,15617,568new
    16.12.2024ks. Jerzego Popiełuszki 26—29.1503,11417,307new
    16.12.2024ks. Jerzego Popiełuszki 24—41.4760,55318,353new
    16.12.2024ks. Jerzego Popiełuszki 29—52.5842,60016,056new
    16.12.2024ks. Jerzego Popiełuszki 26—30.9549,45317,787new
    16.12.2024ks. Jerzego Popiełuszki 23—40.7588,66414,463new
    16.12.2024ks. Jerzego Popiełuszki 27—62.51,040,31216,642new
    16.12.2024ks. Jerzego Popiełuszki 28—29.5560,08918,973new
    16.12.2024ks. Jerzego Popiełuszki 23—67.3898,59613,356new
    16.12.2024ks. Jerzego Popiełuszki 26—64.3865,47513,452new
    13.12.2024ks. Jerzego Popiełuszki 25—46.5763,48916,405new
    13.12.2024ks. Jerzego Popiełuszki 28—62.61,030,68016,470new
    12.12.2024ks. Jerzego Popiełuszki 24—29.8470,53815,769new
    12.12.2024ks. Jerzego Popiełuszki 24—61.9924,85814,939new
    12.12.2024ks. Jerzego Popiełuszki 210—73.71,180,12816,010new
    12.12.2024Okrąg 2/42243.4645,00014,869resale
    11.12.2024ks. Jerzego Popiełuszki 27—40.8667,08416,362new
    11.12.2024ks. Jerzego Popiełuszki 26—46.6753,35816,153new
    10.12.2024ks. Jerzego Popiełuszki 28—30.1538,51517,909new
    10.12.2024ks. Jerzego Popiełuszki 210—62.2962,78815,466new
    10.12.2024ks. Jerzego Popiełuszki 29—38.4653,84517,045new
    10.12.2024ks. Jerzego Popiełuszki 25—36.4626,45217,191new
    10.12.2024ks. Jerzego Popiełuszki 27—31617,96419,909new
    09.12.2024ks. Jerzego Popiełuszki 28—46.6807,55617,322new
    09.12.2024ks. Jerzego Popiełuszki 25—57.3780,94413,636new
    09.12.2024ks. Jerzego Popiełuszki 22—50.5691,79913,702new
    09.12.2024ks. Jerzego Popiełuszki 225—82.51,405,32317,028new
    09.12.2024ks. Jerzego Popiełuszki 27—36.4609,46316,725new
    09.12.2024ks. Jerzego Popiełuszki 28—57.4807,40514,066new
    09.12.2024ks. Jerzego Popiełuszki 26—41.1674,18016,399new
    09.12.2024ks. Jerzego Popiełuszki 28—41.5743,80017,927new
    09.12.2024ks. Jerzego Popiełuszki 23—41.4714,78617,257new
    09.12.2024ks. Jerzego Popiełuszki 225—82.41,389,90416,876new
    09.12.2024ks. Jerzego Popiełuszki 22—36.3586,09616,124new
    09.12.2024ks. Jerzego Popiełuszki 242—78.31,087,99713,893new
    09.12.2024ks. Jerzego Popiełuszki 23—40.8651,89415,970new
    09.12.2024ks. Jerzego Popiełuszki 25—62.31,060,65017,022new
    09.12.2024ks. Jerzego Popiełuszki 22—41.4708,52217,114new
    06.12.2024ks. Jerzego Popiełuszki 24—38.5631,60416,401new
    06.12.2024ks. Jerzego Popiełuszki 210—38.5667,74617,340new
    06.12.2024ks. Jerzego Popiełuszki 28—811,358,22516,762new
    06.12.2024ks. Jerzego Popiełuszki 22—29.3436,76414,886new
    06.12.2024ks. Jerzego Popiełuszki 26—57.5801,65213,949new
    06.12.2024ks. Jerzego Popiełuszki 211—82.71,520,69018,395new
    06.12.2024ks. Jerzego Popiełuszki 29—62.4951,05515,241new
    06.12.2024ks. Jerzego Popiełuszki 22—36.2564,77915,593new
    06.12.2024ks. Jerzego Popiełuszki 24—30.7578,45518,861new
    06.12.2024ks. Jerzego Popiełuszki 27—46.6732,47015,722new
    05.12.2024ks. Jerzego Popiełuszki 23—57.5782,74613,625new
    05.12.2024ks. Jerzego Popiełuszki 211—79.21,579,67619,955new
    05.12.2024ks. Jerzego Popiełuszki 22—31437,63314,131new
    05.12.2024ks. Jerzego Popiełuszki 23—64.4938,44814,572new
    05.12.2024ks. Jerzego Popiełuszki 28—68.4971,51214,197new
    05.12.2024ks. Jerzego Popiełuszki 22—29.6529,00017,872new
    05.12.2024ks. Jerzego Popiełuszki 210—73.11,269,12517,366new
    05.12.2024ks. Jerzego Popiełuszki 26—64.4868,32613,485new
    04.12.2024ks. Jerzego Popiełuszki 23—38.4512,45413,342new
    04.12.2024ks. Jerzego Popiełuszki 23—68.6931,29913,578new
    04.12.2024ks. Jerzego Popiełuszki 26—41653,70215,928new
    04.12.2024ks. Jerzego Popiełuszki 25—64.3869,93713,521new
    04.12.2024ks. Jerzego Popiełuszki 210—61.61,015,84416,480new
    04.12.2024ks. Jerzego Popiełuszki 28—36.4627,96717,257new
    04.12.2024ks. Jerzego Popiełuszki 23—36.4568,55115,624new
    04.12.2024ks. Jerzego Popiełuszki 26—36.3654,34418,001new
    04.12.2024ks. Jerzego Popiełuszki 27—41.4678,27216,391new
    04.12.2024ks. Jerzego Popiełuszki 210—36.2664,41018,359new
    04.12.2024ks. Jerzego Popiełuszki 28—30.9575,40018,621new
    04.12.2024Mikołaja Reja 30C2442430,00010,238resale
    04.12.2024ks. Jerzego Popiełuszki 28—67.2941,73214,010new
    03.12.2024ks. Jerzego Popiełuszki 223—60.91,482,00024,331resale
    03.12.2024ks. Jerzego Popiełuszki 27—29.6518,31817,511new
    03.12.2024ks. Jerzego Popiełuszki 22—41.5677,76316,343new
    03.12.2024ks. Jerzego Popiełuszki 28—82.41,352,29716,407new
    03.12.2024ks. Jerzego Popiełuszki 29—74.61,221,80016,380new
    03.12.2024ks. Jerzego Popiełuszki 22—31528,83117,032new
    03.12.2024ks. Jerzego Popiełuszki 24—81.11,293,39015,956new
    03.12.2024ks. Jerzego Popiełuszki 27—81.41,371,28316,855new
    03.12.2024ks. Jerzego Popiełuszki 28—36.4684,21518,813new
    03.12.2024ks. Jerzego Popiełuszki 25—67.2908,94913,520new
    03.12.2024ks. Jerzego Popiełuszki 27—67.3929,52113,812new
    03.12.2024ks. Jerzego Popiełuszki 25—68.4946,54213,842new
    03.12.2024ks. Jerzego Popiełuszki 25—54.5794,27014,574new
    03.12.2024ks. Jerzego Popiełuszki 26—67.3874,31012,999new
    03.12.2024ks. Jerzego Popiełuszki 24—67.2904,95813,461new
    03.12.2024ks. Jerzego Popiełuszki 26—36.3667,43718,366new
    02.12.2024ks. Jerzego Popiełuszki 210—57.5971,17116,902new
    02.12.2024ks. Jerzego Popiełuszki 29—73.91,211,78116,400new
    02.12.2024ks. Jerzego Popiełuszki 22—62.3926,44914,876new
    02.12.2024ks. Jerzego Popiełuszki 211—72.91,571,44621,553new
    02.12.2024ks. Jerzego Popiełuszki 23—54.5741,10213,593new
    02.12.2024ks. Jerzego Popiełuszki 25—30.1559,30018,600new
    02.12.2024ks. Jerzego Popiełuszki 28—40.7698,43917,178new
    02.12.2024ks. Jerzego Popiełuszki 25—40.7641,54515,763new
    02.12.2024ks. Jerzego Popiełuszki 225—82.31,245,27015,127new
    02.12.2024ks. Jerzego Popiełuszki 229—1352,232,82316,536new
    02.12.2024ks. Jerzego Popiełuszki 24—40.7673,94916,567new
    02.12.2024ks. Jerzego Popiełuszki 210—74.91,240,40616,570new
    29.11.2024ks. Jerzego Popiełuszki 23—64.2832,61412,959new
    29.11.2024ks. Jerzego Popiełuszki 22—41.4725,45217,536new
    29.11.2024ks. Jerzego Popiełuszki 26—40.8677,31116,617new
    29.11.2024ks. Jerzego Popiełuszki 27—41665,79516,219new
    29.11.2024ks. Jerzego Popiełuszki 245—51.51,312,00025,491resale
    29.11.2024ks. Jerzego Popiełuszki 24—31559,54518,073new
    29.11.2024ks. Jerzego Popiełuszki 26—29.7579,52119,493new
    29.11.2024ks. Jerzego Popiełuszki 210—90.11,429,49915,875new
    29.11.2024ks. Jerzego Popiełuszki 27—41.3675,98216,380new
    29.11.2024ks. Jerzego Popiełuszki 23—40.9700,64517,147new
    28.11.2024ks. Jerzego Popiełuszki 24—40.8650,19715,917new
    28.11.2024ks. Jerzego Popiełuszki 28—54.4857,74715,756new
    28.11.2024ks. Jerzego Popiełuszki 24—46.8710,31415,181new
    28.11.2024ks. Jerzego Popiełuszki 26—38.4594,10015,487new
    28.11.2024ks. Jerzego Popiełuszki 29—58.8937,21815,931new
    28.11.2024ks. Jerzego Popiełuszki 28—64.4944,29814,665new
    28.11.2024ks. Jerzego Popiełuszki 222—76.51,116,50314,589new
    28.11.2024ks. Jerzego Popiełuszki 24—28.9507,53117,586new
    28.11.2024ks. Jerzego Popiełuszki 25—64.5920,68314,276new
    28.11.2024ks. Jerzego Popiełuszki 24—68.4938,55513,726new
    28.11.2024ks. Jerzego Popiełuszki 23—30.6548,89517,908new
    28.11.2024ks. Jerzego Popiełuszki 26—30.1539,19717,890new
    27.11.2024ks. Jerzego Popiełuszki 26—41.3717,15217,377new
    27.11.2024ks. Jerzego Popiełuszki 27—57.3816,82214,245new
    27.11.2024ks. Jerzego Popiełuszki 27—30.7588,45119,155new
    27.11.2024ks. Jerzego Popiełuszki 23—46.7699,71414,977new
    26.11.2024ks. Jerzego Popiełuszki 24—41.3637,90515,438new
    26.11.2024ks. Jerzego Popiełuszki 24—41.3695,74216,834new
    26.11.2024ks. Jerzego Popiełuszki 27—30.1546,53618,163new
    26.11.2024Twarda 18B1226390,00015,000resale
    26.11.2024ks. Jerzego Popiełuszki 23—41.5703,95216,975new
    26.11.2024ks. Jerzego Popiełuszki 25—41.1591,53414,389new
    26.11.2024ks. Jerzego Popiełuszki 24—41.1601,54114,640new
    26.11.2024ks. Jerzego Popiełuszki 26—46.6700,05615,013new
    26.11.2024ks. Jerzego Popiełuszki 25—30.7586,40219,126new
    26.11.2024ks. Jerzego Popiełuszki 26—41.4664,04016,040new
    26.11.2024ks. Jerzego Popiełuszki 29—36.2656,16918,146new
    25.11.2024ks. Jerzego Popiełuszki 23—85.31,117,62513,104new
    25.11.2024ks. Jerzego Popiełuszki 22—40.9675,37416,505new
    25.11.2024ks. Jerzego Popiełuszki 27—82.41,320,07516,026new
    25.11.2024ks. Jerzego Popiełuszki 210—75.91,169,66215,409new
    25.11.2024ks. Jerzego Popiełuszki 22—29.7503,54116,943new
    25.11.2024ks. Jerzego Popiełuszki 27—29.7543,53718,289new
    25.11.2024ks. Jerzego Popiełuszki 226—60.81,040,00017,102resale

    Showing 300 most recent. All 829 — in the CSV.

    Data: Rejestr Cen Nieruchomości (GUGiK), PRG addresses, district boundaries from the city's open data or OpenStreetMap. Sales up to 05.02.2026; entries reach the register about 1.5 months after the sale on average, so the last ~3 months are incomplete. The price is the gross price from the notarial deed; only sales of whole flats on the open market are included.