Kwadrato Kraków
Address · 30-150 · Krowodrza

Jana Buszka 27 sale prices and the building's surroundings

Typical price here
19,692 zł/m²
middle 50% of sales: 18,587 – 21,129 zł/m²
41 sales over 24 months · Radius 300 m
price per m² by quarter, 2022–2026: 10,017 → 20,237
Typical flat 63.5 m² ≈ 1,250,462 zł
≈ 5,985 zł per month with a 20% down payment and a 30-year mortgage
Compared with the city+33.4%
Change over the year—
Typical flat63.5 m²
Check a listing
Refine: rooms, floor, market

The building has only 1 sale in 24 months — showing the nearest area with at least 20 sales.

Location

Pros

  • separate cycle track 5 min away
  • quiet: noise below 55 dB
  • lots of green space: 34% within 500 m
  • grocery shops within 500 m: 7

Things to watch out for

  • rare-flood zone (once in 500 years or if a levee breaks)
  • PM2.5 dust above the Polish limit
Transport5/10
average
28 min to the centre; rush-hour departures nearby: 165
Shops nearby4/10
weak
within 500 m grocery shops: 7, pharmacies: 1; doctors within 1 km: 5
Schools and kindergartens9/10
excellent
school 11 min away (exam 80%); kindergartens within 1 km: 7
Quiet10/10
excellent
noise below 55 dB
Green space7/10
good
34% green space within 500 m, park 11 min away
Low risk3/10
weak
air worse than the Polish limit
On the map:

Risks

In a rare-flood zone (ISOK): once in 500 years — water 0.5–2 m, if a levee breaks — water up to 0.5 m

PM2.5 dust 20.4 µg/m³ a year (2024) — above the Polish limit of 20

  • noise below 55 dB according to the noise map
  • NO₂ 19.7 µg/m³ per year — below the 2030 EU limit (20)
  • no plants with a risk of a major accident (SEVESO) within 2 km
  • no plants of the PRTR pollutant register within 1 km
  • Road accidents with injuries nearby in 3 years: 2

Sources: the city's strategic noise map, ISOK flood maps (Wody Polskie), EEA annual air quality model (1 km), road accident data, SEVESO and PRTR registers (GIOŚ). The maps are a general guide, not a verdict on an individual building.

What may be built nearby

  • A local zoning plan (MPZP) is in force №XII/218/19 «ARMII KRAJOWEJ - PIASTOWSKA» — what can be built nearby is already set.
  • Allowed by the plan within 150 m: blocks of flats (0 m); streets and roads (19 m); services: shops, offices, venues (126 m).
  • Building permits within 500 m in the last 3 years (GUNB): 9 — housing 4, services and offices 2, industry and warehouses 3.
    • hotel or dormitory, new building · 126 m · permit 09.05.2024
      Budynek hotelowy z infrastrukturą techniczna.
    • industry or warehouse, new building · 128 m · permit 10.01.2025
      Budowa budynku hotelowo-usługowego.
    • hotel or dormitory, new building · 131 m · permit 03.07.2024
      Budowa budynku hotelowo-biurowo-apartamentowego wraz z rozbiórką budynków niemieszkalnych.
    • block of flats, new building · 182 m · permit 05.12.2024
      BUDOWA BUDYNKU MIESZKALNEGO WIELORODZINNEGO.
All land uses within 150 m
  • blocks of flats · 0 m
  • streets and roads · 19 m
  • parks, allotments, cemeteries · 22 m
  • utility networks · 33 m
  • internal access roads · 108 m
  • services: shops, offices, venues · 126 m

What buying will cost

For a typical flat here — 1,250,462 zł, 63.5 m², 80% mortgage over 30 years at 5.98%.

Cash up front281,349 zł
Monthly payment5,985 zł
Taxes and notary31,256 zł

Calculate for your situation →

Why the price is what it is here

What affects the price here

How we calculate this

District Krowodrza: similar flats here are on average pricier by 17.8% compared with the city average.

Green space nearby · 34%-2.3%

Effect on the price per m² compared with similar flats in the same district, based on 2022–2026 sales. These are statistical links, not a guarantee for a specific flat.

Developer prices nearby
DevelopmentDistanceFlatsMedian zł/m²Change
Odlewnicza/Bakałarzy
EKO-PARK
444 m5621,100-4.5%
Odlewnicza 54
EKO-PARK
510 m1417,191-1.2%
Głowackiego 22
GVD Głowackiego
1,326 m5924,126+3%
JESIONOWA4YOU
Kliw Inwestycje
1,465 m929,700—
Jesionowa działka 85/2 obr. 10 Kraków- Krowodrza
JR 33
1,465 m418,183-4.3%

Asking prices from daily price lists (dane.gov.pl), 1.5 km radius.

What to check yourself before buying
  • Land and mortgage register (KW) — owner, mortgages, encumbrances: free of charge at ekw.ms.gov.pl.
  • Type of ownership — full ownership or cooperative right; share of the land in perpetual usufruct (annual fee).
  • Fees — fees to the owners' association, repair fund, any arrears of the previous owner.
  • Building — year built, condition of the roof and façade, planned repairs (owners' association minutes).
  • Flat — which way the windows face, ventilation, damp, window frames, heating.
  • For a new build — information prospectus, building permit, escrow bank account.
Location in detail: stops, schools, green space, sun

Location card

from the address

Transport

28 min to the centre at 7:45 on a weekday (1 transfer(s))

  • Przybyszewskiego · 312 m · 104 departures 7–9 am
    139164173199310501511601
  • Armii Krajowej · 515 m · 47 departures 7–9 am
    164173199601
  • Miasteczko Studenckie AGH · 565 m · 14 departures 7–9 am
    102159
Time to other districts at 7:45: 3 of 18 within 30 min
Krowodrza — your district22 min
Bronowice21 min
Stare Miasto29 min
Grzegórzki31 min
Zwierzyniec31 min
Prądnik Biały35 min
Prądnik Czerwony37 min
Łagiewniki-Borek Fałęcki45 min
Podgórze45 min
Podgórze Duchackie48 min
Czyżyny50 min
Mistrzejowice53 min
Bieńczyce53 min
Bieżanów-Prokocim55 min
Dębniki57 min
Swoszowice63 min
Wzgórza Krzesławickie73 min
Nowa Huta101 min

By public transport and on foot to where most of the district's addresses are; a weekday, by the timetable.

Schools and kindergartens

SZKOŁA PODSTAWOWA NR 93 IM. LUCJANA RYDLA W KRAKOWIE619 m80.2%
NIEPUBLICZNA SZKOŁA PODSTAWOWA MISTRZOSTWA SPORTOWEGO IM. TAprivate910 m70%
SZKOŁA PODSTAWOWA Z ODDZIAŁAMI INTEGRACYJNYMI NR 12 IM. JANU1,241 m72.8%
SZKOŁA PODSTAWOWA NR 153 IM. KSIĘDZA PROFESORA JÓZEFA TISCHN1,317 m72.3%

The last column is the average 8th-grade exam result (Polish, maths, English), CKE. The city does not publish the school catchment area for each address — check at www.edukacja.krakow.pl.

Kindergartens within 1 km: 7 (public: 2) · nearest: 7 min walk

Universities

Uniwersytet Jagielloński w Krakowie 1.8 km18 min
Akademia Górniczo-Hutnicza im. Stanisława Staszica w Krakowi 1.4 km17 min
Uniwersytet Komisji Edukacji Narodowej w Krakowie 1.1 km17 min
Uniwersytet Ekonomiczny w Krakowie 4.1 km27 min
Politechnika Krakowska im. Tadeusza Kościuszki 1.2 km18 min

The city's largest institutions by full-time students. Distance is a straight line to the nearest building of the institution; time is by public transport and on foot at 7:45 on a weekday.

Nearby

Grocery shops7 within 500 mnearest: 2 min walk
Pharmacies1 within 500 mnearest: 7 min walk
Doctors, clinics5 within 1 kmnearest: 7 min walk
Playgrounds9 within 500 mnearest: 2 min walk
Cafés and restaurants5 within 500 mnearest: 4 min walk
City bike hire0 within 500 mnearest: 26 min walk
Gyms4 within 1 kmnearest: 7 min walk
Park & Ride0 within 2 kmnearest: 59 min walk
EV chargers0 within 1 km

Green space, noise, air

34% of the area within 500 m — parks, forests, lawns

Nearest green area: right nearby · park «Park Młynówka Królewska» — 626 m

Noise: roadsquiet (below 55 dB)
Noise: tramsquiet (below 55 dB)
Noise: railwayquiet (below 55 dB)
Noise: industryquiet (below 55 dB)

Strategic noise map, LDWN (24 h). Limit for blocks of flats: 68 dB from roads, trams and railways (70 dB in a big city's centre zone), 60 dB from aircraft, 55 dB from industry. WHO recommends up to 53 dB from roads.

Loading air quality…

Risks and restrictions

Flood once in 10 yearsno
Flood once in 100 yearsno
Flood once in 500 yearsin a flood zone · water 0.5–2 m
Flood if a levee breaksin a flood zone · water up to 0.5 m
Road accidents in 3 years, 300 m20 · with injuries: 2
Paid parkingno

Flood zones — ISOK (Wody Polskie); 1 cell ≈ 7 m. Being in the Q1% zone affects insurance and mortgages.

What may be built nearby

Local zoning plan (MPZP)№XII/218/19 ARMII KRAJOWEJ - PIASTOWSKA · resolution
Land use within 150 m
MWi tereny zabudowy mieszkaniowej wielorodzinnej istniejącej
KDL tereny dróg publicznych - klasy lokalnej · 19 m
MW tereny zabudowy mieszkaniowej wielorodzinnej · 19 m
ZPo tereny zieleni urządzonej · 22 m
K Teren infrastruktury technicznej - kanalizacja · 33 m
KDX tereny ciągów pieszych · 64 m
ZPg Tereny zieleni urządzonej - ogrody · 67 m
MW/U tereny zabudowy mieszkaniowej wielorodzinnej lub usługowej · 88 m
City-owned land within 200 mnone

MW — blocks of flats, MN — houses, U — services, ZP — parks, KD — roads.

Sun

Calculating…

Sources: GTFS, OpenStreetMap, city GIS, ISOK, GIOŚ, RSPO, CKE, RAD-on, GUGiK. Source status

Sales, charts and filters (446 sales)

Area: Radius 300 m · 446 sales with filters applied

Market
Rooms
Area, m²
Floor
Period
Median, 12 mo.
21,047 zł/m²
20 sales
Difference from the city, 12 mo.
+40.2%
city: 15,016 zł/m²
Difference from the district
+20.3%
Krowodrza: 17,491 zł/m²
Change over the year
—
too few sales to compare
Median price
1,167,500 zł
area 60.1 m²
All time
11,631 zł/m²
446 sales · primary market 82.7%
Company buyers
5%
share of sales in 12 mo.

Median price per m² by quarter

The band is the middle 50% of sales in the area. Quarters with fewer than 3 sales in the area are skipped. The last quarter is incomplete.

Distribution of price per m²

8,000–9,000 zł/m²: 9 sales9,000–10,000 zł/m²: 89 sales10,000–11,000 zł/m²: 108 sales11,000–12,000 zł/m²: 21 sales12,000–13,000 zł/m²: 9 sales13,000–14,000 zł/m²: 11 sales14,000–15,000 zł/m²: 20 sales15,000–16,000 zł/m²: 38 sales16,000–17,000 zł/m²: 37 sales17,000–18,000 zł/m²: 19 sales18,000–19,000 zł/m²: 23 sales19,000–20,000 zł/m²: 15 sales20,000–21,000 zł/m²: 15 sales21,000–22,000 zł/m²: 10 sales22,000–23,000 zł/m²: 7 sales23,000–24,000 zł/m²: 4 sales24,000–25,000 zł/m²: 3 sales25,000–26,000 zł/m²: 8 sales8101214161820222426

area median 11,631 zł/m² city median 15,016 zł/m² · k zł/m², 446 sales

Resales

27 sales — flats sold twice. Median price change +37.8% over a median of 5.7 mo. between deeds.

The first price mostly comes from the developer's handover deed and was agreed 1–3 years earlier, so the difference shows growth over a longer period.

AddressAreaBoughtPriceSoldPriceDifference
Brązownicza 1468.120.12.20231,271,70625.06.20261,660,000+30.5%
Stanisława Przybyszewskiego 64B54.104.07.2022500,20415.06.20261,095,000+118.9%
Stanisława Przybyszewskiego 64E30.316.09.2022413,64006.03.2026670,000+62%
Brązownicza 1496.621.02.20251,900,00009.12.20252,255,000+18.7%
Brązownicza 149429.04.20251,937,52021.08.20251,940,000+0.1%
Brązownicza 1281.531.08.20231,366,97908.07.20252,500,000+82.9%
Brązownicza 1449.904.09.2023772,37014.05.2025830,000+7.5%
Stanisława Przybyszewskiego 64D63.527.07.2022608,52531.01.20251,291,000+112.2%
Brązownicza 1469.823.05.20241,315,74220.09.20241,490,000+13.2%
Brązownicza 1451.406.10.2023786,45229.07.20241,215,000+54.5%
Brązownicza 1470.415.02.20241,312,51821.06.20241,782,500+35.8%
Brązownicza 1483.820.12.20231,509,59830.04.20242,055,000+36.1%
Brązownicza 1470.619.01.20241,329,13630.04.20241,775,400+33.6%
Brązownicza 14101.722.11.20231,914,43024.04.20242,517,800+31.5%
Brązownicza 1262.826.10.20231,042,80016.04.20241,593,000+52.8%
Stanisława Przybyszewskiego 64L43.508.11.2022519,81902.04.2024840,000+61.6%
Brązownicza 147421.09.20231,164,40807.03.20241,390,000+19.4%
Brązownicza 1468.521.09.20231,131,70519.01.20241,515,000+33.9%
Armii Krajowej 736.112.11.2022420,00022.12.2023610,000+45.2%
Brązownicza 1449.929.08.2023776,13018.12.20231,135,000+46.2%
Brązownicza 1468.230.08.20231,074,25015.12.20231,500,000+39.6%
Brązownicza 1483.723.10.20231,400,05307.12.20231,620,800+15.8%
Brązownicza 147530.08.20231,165,29424.11.20231,605,500+37.8%
Stanisława Przybyszewskiego 64C59.215.07.2022580,73803.07.20231,145,000+97.2%
Stanisława Przybyszewskiego 8573.813.01.20231,055,97512.06.20231,490,000+41.1%
Stanisława Przybyszewskiego 64D60.411.07.2022558,88424.05.20231,000,000+78.9%
Stanisława Przybyszewskiego 64D63.413.07.2022709,44625.04.2023970,000+36.7%

Sales (446)

CSV
DateAddressFloorRoomsAreaPricezł/m²Market
08.10.2026Stanisława Przybyszewskiego 682363.41,220,00019,246resale
01.09.2026Stanisława Przybyszewskiego 646360.11,280,00021,291resale
28.08.2026Stanisława Przybyszewskiego 64K1353.61,185,00022,108resale
11.08.2026Stanisława Przybyszewskiego 851494.32,050,00021,748resale
17.07.2026Stanisława Przybyszewskiego 832489.41,890,00021,129resale
29.06.2026Stanisława Przybyszewskiego 64K1239.1930,00023,779resale
25.06.2026Brązownicza 141368.11,660,00024,362resale
15.06.2026Stanisława Przybyszewskiego 64B2354.11,095,00020,237resale
20.05.2026Stanisława Przybyszewskiego 64H2360.11,100,00018,309resale
14.04.2026Stanisława Przybyszewskiego 851246.2990,00021,433resale
13.04.2026Stanisława Przybyszewskiego 681365.71,051,00015,999resale
09.04.2026Armii Krajowej 72236.2520,00014,373resale
12.03.2026Stanisława Przybyszewskiego 832359.71,200,00020,117resale
06.03.2026Stanisława Przybyszewskiego 64E1130.3670,00022,127resale
19.02.2026Stanisława Przybyszewskiego 644363.31,285,00020,284resale
11.02.2026Stanisława Przybyszewskiego 64H5360.11,260,00020,965resale
28.01.2026Brązownicza 141370.71,150,00016,268new
19.12.2025Jana Buszka 274135.7660,00018,467resale
10.12.2025Stanisława Przybyszewskiego 64H4235.3820,00023,243resale
09.12.2025Brązownicza 142496.62,255,00023,339resale
22.08.2025Stanisława Przybyszewskiego 681250.3867,50017,243resale
21.08.2025Brązownicza 1434941,940,00020,632resale
01.08.2025Stanisława Przybyszewskiego 831372.71,345,00018,513resale
01.08.2025Stanisława Przybyszewskiego 684248.8960,00019,692resale
16.07.2025Brązownicza 143496.71,985,00020,532new
08.07.2025Brązownicza 124381.52,500,00030,686resale
24.06.2025Stanisława Przybyszewskiego 684363.31,200,00018,960resale
18.06.2025Brązownicza 1424101.51,886,90418,587new
14.05.2025Brązownicza 142349.9830,00016,640resale
29.04.2025Brązownicza 1434941,937,52020,605new
07.04.2025Stanisława Przybyszewskiego 64B10359.41,115,00018,784resale
04.04.2025Brązownicza 1413781,534,57019,666new
05.03.2025Brązownicza 122381.51,521,66418,666new
21.02.2025Brązownicza 142496.61,900,00019,665new
06.02.2025Brązownicza 142499.21,900,00019,163new
31.01.2025Stanisława Przybyszewskiego 64D4363.51,291,00020,331resale
30.01.2025Brązownicza 122377.21,345,86217,442new
20.12.2024Brązownicza 141496.81,961,47020,267new
28.11.2024Brązownicza 122483.21,613,69319,407new
25.11.2024Brązownicza 121377.31,332,77517,242new
19.11.2024Brązownicza 141256.41,067,92018,921new
09.10.2024Armii Krajowej 78236.3520,00014,309resale
20.09.2024Brązownicza 142369.81,490,00021,341resale
29.08.2024Brązownicza 141369.61,322,74818,997new
29.08.2024Stanisława Przybyszewskiego 64H43591,250,00021,179resale
29.07.2024Brązownicza 123381.61,586,72019,445new
29.07.2024Brązownicza 141251.41,215,00023,620resale
28.06.2024Stanisława Przybyszewskiego 64C3359.21,168,00019,720resale
21.06.2024Brązownicza 143370.41,782,50025,312resale
06.06.2024Brązownicza 144498.71,982,67020,088new
29.05.2024Brązownicza 141488.81,720,91419,373new
29.05.2024Brązownicza 1434991,994,98020,159new
24.05.2024Brązownicza 144392.11,297,09814,090new
23.05.2024Brązownicza 142369.81,315,74218,845new
30.04.2024Brązownicza 141383.82,055,00024,531resale
30.04.2024Brązownicza 144370.61,775,40025,162resale
26.04.2024Brązownicza 1424891,778,60019,984new
24.04.2024Brązownicza 1434101.72,517,80024,757resale
16.04.2024Brązownicza 122362.81,593,00025,366resale
03.04.2024Brązownicza 144493.92,393,29025,482new
02.04.2024Stanisława Przybyszewskiego 64L2243.5840,00019,315resale
21.03.2024Stanisława Przybyszewskiego 64D10363.41,400,00022,068resale
12.03.2024Stanisława Przybyszewskiego 64N2364.61,150,00017,799new
07.03.2024Brązownicza 1423741,390,00018,794resale
05.03.2024Brązownicza 142370.81,343,18818,985new
23.02.2024Stanisława Przybyszewskiego 834392.42,873,00031,100resale
15.02.2024Brązownicza 143370.41,312,51818,638new
31.01.2024Brązownicza 141498.91,793,40018,133new
19.01.2024Brązownicza 142368.51,515,00022,114resale
19.01.2024Brązownicza 144370.61,329,13618,837new
15.01.2024Brązownicza 141367.11,159,31517,275new
12.01.2024Brązownicza 1413681,269,02118,665new
03.01.2024Stanisława Przybyszewskiego 64J2243.5795,00018,297resale
22.12.2023Armii Krajowej 77236.1610,00016,883resale
20.12.2023Brązownicza 141368.11,271,70618,663new
20.12.2023Brązownicza 141383.81,509,59818,021new
18.12.2023Brązownicza 141349.91,135,00022,727resale
15.12.2023Brązownicza 143368.21,500,00022,010resale
13.12.2023Brązownicza 124377.41,342,84617,354new
12.12.2023Stanisława Przybyszewskiego 681365.21,070,00016,414resale
07.12.2023Brązownicza 142383.71,620,80019,357resale
01.12.2023Brązownicza 142375.21,258,80016,742new
24.11.2023Brązownicza 1433751,605,50021,401resale
24.11.2023Brązownicza 142368.11,213,20817,826new
22.11.2023Brązownicza 1434101.71,914,43018,824new
21.11.2023Stanisława Przybyszewskiego 834392.4750,0008,119resale
13.11.2023Brązownicza 1445112.72,032,40418,031new
08.11.2023Brązownicza 143369.71,116,41216,020new
31.10.2023Brązownicza 123377.31,195,66015,474new
30.10.2023Brązownicza 144383.81,322,08715,786new
26.10.2023Brązownicza 1423681,148,33416,877new
26.10.2023Brązownicza 142367.21,104,72616,447new
26.10.2023Brązownicza 122362.81,042,80016,605new
26.10.2023Brązownicza 144496.62,032,91521,038new
25.10.2023Brązownicza 142253850,05016,039new
23.10.2023Brązownicza 142383.71,400,05316,721new
18.10.2023Brązownicza 142248.5693,40714,300new
17.10.2023Brązownicza 143368.11,145,14816,826new
16.10.2023Brązownicza 142246.7765,70216,382new
16.10.2023Brązownicza 144349.9815,64216,359new
13.10.2023Brązownicza 121249.2694,15214,115new
13.10.2023Brązownicza 142498.22,036,44020,736new
13.10.2023Brązownicza 124242.5717,36016,895new
11.10.2023Brązownicza 141253.8920,48217,106new
10.10.2023Brązownicza 143383.91,305,18315,558new
06.10.2023Brązownicza 141251.4786,45215,289new
06.10.2023Brązownicza 143253.2860,87616,170new
06.10.2023Brązownicza 142372.11,120,01415,536new
05.10.2023Brązownicza 141246.7790,88516,946new
04.10.2023Stanisława Przybyszewskiego 831238.5750,00019,475resale
02.10.2023Brązownicza 143246.7763,50316,360new
29.09.2023Stanisława Przybyszewskiego 854177.32,100,00027,156new
29.09.2023Brązownicza 124362.8974,35515,518new
28.09.2023Stanisława Przybyszewskiego 851260.6876,69514,474new
28.09.2023Brązownicza 123362.71,018,00016,236resale
28.09.2023Brązownicza 1213681,070,20015,734new
28.09.2023Brązownicza 142369.21,090,42015,769new
28.09.2023Brązownicza 1444101.61,615,17615,901new
28.09.2023Armii Krajowej 73236.2545,00015,076resale
27.09.2023Brązownicza 1423711,199,31216,901new
21.09.2023Brązownicza 142368.51,131,70516,519new
21.09.2023Brązownicza 1423741,164,40815,744new
20.09.2023Brązownicza 123362.7915,80014,606new
19.09.2023Brązownicza 144251.4797,01015,512new
19.09.2023Brązownicza 144378.21,365,47517,472new
18.09.2023Brązownicza 143367.31,061,18815,766new
15.09.2023Brązownicza 143251.4815,52815,876new
15.09.2023Brązownicza 143498.12,086,25021,271new
14.09.2023Brązownicza 144246.7770,10016,504new
14.09.2023Brązownicza 144248.5774,79915,972new
13.09.2023Brązownicza 141392.11,599,94017,366new
13.09.2023Brązownicza 1413711,135,20015,984new
13.09.2023Brązownicza 1443741,185,60016,015new
12.09.2023Armii Krajowej 712235490,00013,996resale
11.09.2023Brązownicza 143248.4795,09016,421new
08.09.2023Brązownicza 142251.6789,30815,309new
08.09.2023Brązownicza 141369.21,107,35015,991new
07.09.2023Brązownicza 1433741,184,45016,000new
07.09.2023Brązownicza 143372.21,113,78115,420new
07.09.2023Brązownicza 121483.21,347,82516,210new
07.09.2023Brązownicza 141253.1866,70016,322new
07.09.2023Brązownicza 122242.5658,50815,480new
06.09.2023Brązownicza 143369.11,097,03715,869new
06.09.2023Brązownicza 124483.21,439,73817,298new
06.09.2023Brązownicza 1443751,182,44415,760new
06.09.2023Brązownicza 143350776,98015,536new
05.09.2023Brązownicza 143392.21,992,68821,608new
05.09.2023Brązownicza 123242.6689,65416,204new
05.09.2023Brązownicza 1434891,497,57716,821new
04.09.2023Brązownicza 142349.9772,37015,485new
04.09.2023Brązownicza 144369.81,117,05016,001new
04.09.2023Brązownicza 144299.72,194,16522,017new
04.09.2023Brązownicza 143371.11,139,25616,030new
04.09.2023Brązownicza 144372.3910,10712,583new
01.09.2023Brązownicza 144368.11,141,28016,764new
01.09.2023Jana Buszka 272238.6800,00020,736resale
31.08.2023Brązownicza 144368.11,103,86216,219new
31.08.2023Brązownicza 144253.2850,15015,977new
31.08.2023Brązownicza 141498.11,810,16018,456new
31.08.2023Brązownicza 124381.51,366,97916,779new
31.08.2023Brązownicza 142493.31,629,96917,478new
30.08.2023Brązownicza 142293.11,666,07217,901new
30.08.2023Brązownicza 123383.51,420,15017,002new
30.08.2023Brązownicza 141357.3863,41415,079new
30.08.2023Brązownicza 121242.5675,20015,895new
30.08.2023Brązownicza 1433751,165,29415,533new
30.08.2023Brązownicza 143368.21,074,25015,763new
29.08.2023Brązownicza 141349.9776,13015,541new
29.08.2023Brązownicza 143368.41,122,09816,407new
29.08.2023Brązownicza 144377.51,400,52018,078new
28.08.2023Stanisława Przybyszewskiego 64F4365.21,165,00017,874resale
24.08.2023Brązownicza 141375.11,192,34615,881new
20.07.2023Jana Buszka 27A3379.91,650,00020,661resale
07.07.2023Stanisława Przybyszewskiego 681247.2750,00015,883resale
03.07.2023Stanisława Przybyszewskiego 64C5359.21,145,00019,335resale
19.06.2023Stanisława Przybyszewskiego 64D1241.8730,00017,460resale
12.06.2023Stanisława Przybyszewskiego 854163.22,127,15033,652new
12.06.2023Stanisława Przybyszewskiego 851373.81,490,00020,176resale
24.05.2023Stanisława Przybyszewskiego 64D4360.41,000,00016,556resale
18.05.2023Stanisława Przybyszewskiego 641125.8495,00019,193resale
11.05.2023Stanisława Przybyszewskiego 64D1249.2799,00016,246resale
25.04.2023Stanisława Przybyszewskiego 64D7463.4970,00015,290resale
21.03.2023Stanisława Przybyszewskiego 64H4362950,00015,310resale
07.03.2023Stanisława Przybyszewskiego 64H2242.1728,00017,300resale
27.02.2023Stanisława Przybyszewskiego 64P1135.2502,59614,262new
25.02.2023Stanisława Przybyszewskiego 64B1237.5660,00017,623resale
22.02.2023Stanisława Przybyszewskiego 64D6359.71,050,00017,591resale
13.01.2023Stanisława Przybyszewskiego 851373.81,055,97514,299new
04.01.2023Stanisława Przybyszewskiego 64M4364.8667,87510,315new
28.12.2022Stanisława Przybyszewskiego 64M2478.9777,9309,853new
22.12.2022Stanisława Przybyszewskiego 64N1135.3506,58814,367new
21.12.2022Stanisława Przybyszewskiego 852379.21,170,00014,782new
20.12.2022Stanisława Przybyszewskiego 64P3476.1756,0509,941new
09.12.2022Stanisława Przybyszewskiego 852373.91,094,02014,798new
08.12.2022Armii Krajowej 78237.1405,00010,919resale
07.12.2022Stanisława Przybyszewskiego 64L1135.3469,71213,310new
05.12.2022Stanisława Przybyszewskiego 64F1130.4443,72014,591new
02.12.2022Stanisława Przybyszewskiego 64N1357.8592,50110,247new
02.12.2022Stanisława Przybyszewskiego 64P55128.41,442,69611,234new
02.12.2022Stanisława Przybyszewskiego 64L53106.91,199,51111,222new
01.12.2022Stanisława Przybyszewskiego 64L5243.4596,03113,721new
01.12.2022Stanisława Przybyszewskiego 64L5479.2901,00311,382new
01.12.2022Stanisława Przybyszewskiego 64M3364.7661,16510,222new
30.11.2022Stanisława Przybyszewskiego 64P1363.8641,10110,049new
30.11.2022Stanisława Przybyszewskiego 64P3243.4523,74012,068new
30.11.2022Stanisława Przybyszewskiego 64M2243.4518,91111,954new
28.11.2022Stanisława Przybyszewskiego 64P3365.3716,44010,965new
28.11.2022Stanisława Przybyszewskiego 64N4479.2803,16310,145new
28.11.2022Stanisława Przybyszewskiego 64P3479.2815,17310,291new
25.11.2022Stanisława Przybyszewskiego 64M1357.6640,52211,120new
25.11.2022Stanisława Przybyszewskiego 64L2476.1800,54310,514new
23.11.2022Stanisława Przybyszewskiego 64M2376.1783,43610,300new
21.11.2022Stanisława Przybyszewskiego 64M3376.2793,11910,407new
21.11.2022Stanisława Przybyszewskiego 64L1358.2600,88510,330new
21.11.2022Stanisława Przybyszewskiego 64P2476.2748,0659,822new
18.11.2022Stanisława Przybyszewskiego 64P4476.1771,32410,132new
18.11.2022Stanisława Przybyszewskiego 64N4364.8667,80510,314new
16.11.2022Stanisława Przybyszewskiego 64N4243.5585,91613,457new
16.11.2022Stanisława Przybyszewskiego 64P4479.2830,60710,491new
16.11.2022Stanisława Przybyszewskiego 64L1128.4404,72014,231new
14.11.2022Stanisława Przybyszewskiego 64M2364.8669,28110,327new
14.11.2022Stanisława Przybyszewskiego 64P5243.5566,16613,024new
14.11.2022Stanisława Przybyszewskiego 64N5479.2843,94010,656new
12.11.2022Armii Krajowej 77236.1420,00011,625resale
10.11.2022Stanisława Przybyszewskiego 64N3476.1756,3029,941new
08.11.2022Stanisława Przybyszewskiego 64N3243.4524,18812,067new
08.11.2022Stanisława Przybyszewskiego 64M5243.4532,91112,268new
08.11.2022Stanisława Przybyszewskiego 64L2243.5519,81911,953new
07.11.2022Stanisława Przybyszewskiego 64L2479.1769,4079,726new
03.11.2022Stanisława Przybyszewskiego 64L4475.8882,03511,636new
03.11.2022Stanisława Przybyszewskiego 64M1363.8640,91010,049new
03.11.2022Stanisława Przybyszewskiego 64L2365.4706,84510,800new
03.11.2022Stanisława Przybyszewskiego 64H2359.2855,00014,450resale
02.11.2022Stanisława Przybyszewskiego 64P2365.3658,63510,079new
02.11.2022Stanisława Przybyszewskiego 64N2376746,3919,824new
02.11.2022Stanisława Przybyszewskiego 64L4365.5675,13210,304new
28.10.2022Stanisława Przybyszewskiego 64N56127.51,416,77711,115new
28.10.2022Stanisława Przybyszewskiego 64M4376.4803,26710,510new
26.10.2022Stanisława Przybyszewskiego 64P2479.2807,87610,204new
26.10.2022Stanisława Przybyszewskiego 64P1128.5411,06814,429new
26.10.2022Stanisława Przybyszewskiego 64N2479.2807,83410,205new
26.10.2022Stanisława Przybyszewskiego 64N1128.4410,27614,431new
26.10.2022Stanisława Przybyszewskiego 64L4479.2786,6139,929new
26.10.2022Stanisława Przybyszewskiego 64P4243.5428,9689,870new
26.10.2022Stanisława Przybyszewskiego 64N3364.9657,53010,124new
24.10.2022Stanisława Przybyszewskiego 64M1128.4410,27614,431new
24.10.2022Stanisława Przybyszewskiego 64M1135.2474,20913,468new
24.10.2022Stanisława Przybyszewskiego 64N3479.2786,8499,939new
24.10.2022Stanisława Przybyszewskiego 64M4479.1789,0119,980new
21.10.2022Stanisława Przybyszewskiego 64N4476.1782,10710,284new
21.10.2022Stanisława Przybyszewskiego 64M5379.1801,22610,131new
20.10.2022Stanisława Przybyszewskiego 64N5243.4532,30612,268new
19.10.2022Stanisława Przybyszewskiego 64N1363.9662,73610,365new
19.10.2022Stanisława Przybyszewskiego 64P5479.2796,19810,052new
18.10.2022Stanisława Przybyszewskiego 64L4243.5570,74013,114new
18.10.2022Stanisława Przybyszewskiego 64L3343.4568,49513,099new
18.10.2022Stanisława Przybyszewskiego 64M56127.61,383,33610,839new
18.10.2022Stanisława Przybyszewskiego 64L3365.5662,51010,119new
14.10.2022Stanisława Przybyszewskiego 64M3479779,1609,858new
14.10.2022Stanisława Przybyszewskiego 64L3376862,71011,354new
14.10.2022Stanisława Przybyszewskiego 64N2243.4556,79712,832new
13.10.2022Stanisława Przybyszewskiego 64L1363.8641,57510,048new
13.10.2022Stanisława Przybyszewskiego 64P1358.1654,70911,261new
13.10.2022Stanisława Przybyszewskiego 64N2364.6701,66010,860new
12.10.2022Stanisława Przybyszewskiego 64M3243.3561,04312,942new
12.10.2022Stanisława Przybyszewskiego 64M3243.3561,04312,942new
12.10.2022Stanisława Przybyszewskiego 64L3479.1876,83211,091new
11.10.2022Stanisława Przybyszewskiego 64P4365.6681,32610,392new
28.09.2022Stanisława Przybyszewskiego 64F5465.1645,4009,914new
26.09.2022Stanisława Przybyszewskiego 64A5359.7614,81610,304new
23.09.2022Stanisława Przybyszewskiego 64A6354579,27010,735new
23.09.2022Stanisława Przybyszewskiego 64A3353.9544,82310,114new
23.09.2022Stanisława Przybyszewskiego 853373.91,130,97515,298new
21.09.2022Stanisława Przybyszewskiego 64G2359.4546,8289,211new
20.09.2022Stanisława Przybyszewskiego 64A8359.7609,66710,217new
20.09.2022Stanisława Przybyszewskiego 64B8359.7610,78810,226new
16.09.2022Stanisława Przybyszewskiego 64E1130.3413,64013,661new
15.09.2022Stanisława Przybyszewskiego 64G1130.2427,60014,159new
13.09.2022Stanisława Przybyszewskiego 64F7585.2882,05010,347new
13.09.2022Stanisława Przybyszewskiego 64D3363.4595,6709,395new
09.09.2022Stanisława Przybyszewskiego 646366.4838,08012,622new
08.09.2022Stanisława Przybyszewskiego 64A8354.1815,00015,070resale
05.09.2022Stanisława Przybyszewskiego 64F5243.3445,98410,293new
31.08.2022Stanisława Przybyszewskiego 682363.7850,00013,344resale
25.08.2022Jana Buszka 27A33791,100,00013,924resale
23.08.2022Stanisława Przybyszewskiego 64B3354.3760,00014,007resale
18.08.2022Stanisława Przybyszewskiego 854373.91,195,35016,177new
09.08.2022Stanisława Przybyszewskiego 64A9354565,46710,472new
09.08.2022Stanisława Przybyszewskiego 64D10359.4604,92310,182new
05.08.2022Stanisława Przybyszewskiego 64C6359.8565,7319,457new
05.08.2022Stanisława Przybyszewskiego 64C10359.4646,25710,874new
04.08.2022Stanisława Przybyszewskiego 64E4365.2677,15510,392new
01.08.2022Stanisława Przybyszewskiego 64C5359.9557,7599,318new
01.08.2022Stanisława Przybyszewskiego 64A2354501,0259,270new
01.08.2022Stanisława Przybyszewskiego 64A2359.8537,1608,983new
01.08.2022Stanisława Przybyszewskiego 64E1343.1437,01410,142new
29.07.2022Stanisława Przybyszewskiego 64C9354.2565,98510,452new
29.07.2022Stanisława Przybyszewskiego 64D9360.4624,59310,341new
29.07.2022Stanisława Przybyszewskiego 64D5359.8551,6599,231new
29.07.2022Stanisława Przybyszewskiego 64E3464.2602,2169,376new

Showing 300 most recent. All 446 — in the CSV.

Data: Rejestr Cen Nieruchomości (GUGiK), PRG addresses, district boundaries from the city's open data or OpenStreetMap. Sales up to 30.10.2026; entries reach the register about 1.5 months after the sale on average, so the last ~3 months are incomplete. The price is the gross price from the notarial deed; only sales of whole flats on the open market are included.