Kwadrato Kraków
Address · 30-716 · Podgórze

Szczygla 14 sale prices and the building's surroundings

Check a listing
Typical price here
13,500 zł/m²
middle 50% of sales: 12,932 – 15,000 zł/m²
111 sales over 24 months · Radius 300 m
Typical flat 55.1 m² ≈ 743,850 zł
≈ 3,560 zł per month with a 20% down payment and a 30-year mortgage
Compared with the city-8.6%
Change over the year-16.9%
Typical flat55.1 m²

No sales in the building itself in 24 months — showing the nearest area with at least 20.

Location

Pros

  • tram 5 min away
  • separate cycle track 3 min away
  • bike-share station 4 min away
  • grocery shops within 500 m: 15
  • primary school 10 min away, exam 80%

Things to watch out for

  • 36 min to the centre by public transport
  • moderate noise from roads (55+ dB)
  • rare-flood zone (once in 500 years or if a levee breaks)
  • PM2.5 dust above the Polish limit
Transport5/10
average
36 min to the centre; rush-hour departures nearby: 366
Shops nearby6/10
average
within 500 m grocery shops: 15, pharmacies: 0; doctors within 1 km: 5
Schools and kindergartens9/10
excellent
school 10 min away (exam 80%); kindergartens within 1 km: 15
Quiet7/10
good
55+ dB from roads — moderate
Green space4/10
weak
15% green space within 500 m, park 6 min away
Low risk4/10
weak
air worse than the Polish limit
On the map:

Risks

In a rare-flood zone (ISOK): once in 500 years — water 0.5–2 m, if a levee breaks — water 0.5–2 m

NO₂ (mostly exhaust fumes) 20.8 µg/m³ per year (2024) — above the EU limit that applies from 2030 (20); WHO recommends up to 10

PM2.5 dust 22 µg/m³ a year (2024) — above the Polish limit of 20

  • noise from roads 55+ dB — below the Polish limit of 68 dB, but above the WHO recommendation of 53 dB
  • nearest plant with a risk of a major accident (SEVESO) — 1,849 m away: waste treatment or incineration
  • no plants of the PRTR pollutant register within 1 km

Sources: the city's strategic noise map, ISOK flood maps (Wody Polskie), EEA annual air quality model (1 km), SEVESO and PRTR registers (GIOŚ). The maps are a general guide, not a verdict on an individual building.

What may be built nearby

  • A local zoning plan (MPZP) is in force №XXVIII/710/19 «REJON ULICY PRZEWÓZ» — what can be built nearby is already set.
  • Allowed by the plan within 150 m: blocks of flats (0 m); streets and roads (16 m); services: shops, offices, venues (74 m).
  • 2 city-owned plots within 200 m — they may be built on or used for a road.
  • Building permits within 500 m in the last 3 years (GUNB): 5 — housing 5.
    • block of flats, new building · 106 m · permit 07.04.2026
      Budynek mieszkalny wielorodzinny.
    • block of flats, new building · 251 m · permit 30.04.2026
      Budowa budynku mieszkalnego wielorodzinnego.
    • block of flats, new building · 271 m · permit 09.05.2025
      budowa budynku mieszkalnego wielorodzinnego z garażem podziemnym, instalacjami wewnętrznymi, wewnętrznym układem drogowym 1 naziemnymi miejs
    • block of flats, new building · 333 m · permit 13.11.2025
      Budowa budynku wielorodzinnego z garażem i pochylnią wraz z wewnętrznymi instalacjami, budowa zjazdu z drogi wewnętrznej.
All land uses within 150 m
  • blocks of flats · 0 m
  • streets and roads · 16 m
  • services: shops, offices, venues · 74 m
  • parks, allotments, cemeteries · 99 m

What buying will cost

For a typical flat here — 743,850 zł, 55.1 m², 80% mortgage over 30 years at 5.98%.

Cash up front168,516 zł
Monthly payment3,560 zł
Taxes and notary19,746 zł

Calculate for your situation →

Why the price is what it is here

What affects the price here

How we calculate this

District Podgórze: similar flats here are on average pricier by 6.2% compared with the city average.

Tram nearby · 248 m+4.9%
Road noise · 55+ dB+2.7%

Effect on the price per m² compared with similar flats in the same district, based on 2022–2026 sales. These are statistical links, not a guarantee for a specific flat.

Developer prices nearby
DevelopmentDistanceFlatsMedian zł/m²Change
Goszczyńskiego 12A
BRYKSY GOSZCZYŃSKIEGO sp. z o.o.
414 m1616,1350%
Lasówka 4A
TC Forum Park Residence Sp. z o.o.
725 m8916,500—
Myśliwska 55A
Tursto Investments Spółka z ograniczoną odpowiedzialnością
824 m4217,405-1.3%
Portowa 16
Casa Feliz Portowa Sp. z o.o.
1,084 m1219,129—
Portowa 14
Casa Feliz Portowa Sp. z o.o.
1,138 m1916,800—
Pana Tadeusza 7
Przedsiębiorstwo Budownictwa Przemysłowego Chemobudowa-Kraków S.A.
1,158 m2319,100—
ul. Portowa
YIT Development Sp. z o. o.
1,183 m1217,451-0.6%

Asking prices from daily price lists (dane.gov.pl), 1.5 km radius.

What to check yourself before buying
  • Land and mortgage register (KW) — owner, mortgages, encumbrances: free of charge at ekw.ms.gov.pl.
  • Type of ownership — full ownership or cooperative right; share of the land in perpetual usufruct (annual fee).
  • Fees — fees to the owners' association, repair fund, any arrears of the previous owner.
  • Building — year built, condition of the roof and façade, planned repairs (owners' association minutes).
  • Flat — which way the windows face, ventilation, damp, window frames, heating.
  • For a new build — information prospectus, building permit, escrow bank account.
Location in detail: stops, schools, green space, sun

Location card

from the address

Transport

36 min to the centre at 7:45 on a weekday (1 transfer(s))

  • Lipska · 234 m · 158 departures 7–9 am
    7911497678125605
  • Saska · 267 m · 46 departures 7–9 am
    125127128158605
  • Szczecińska · 272 m · 24 departures 7–9 am
    128158605
  • Rzebika · 419 m · 110 departures 7–9 am
    117678125127128148158605
  • Myśliwska Szkoła · 500 m · 5 departures 7–9 am
    127
Time to other districts at 7:45: 4 of 18 within 30 min
Podgórze — your district1 min
Podgórze Duchackie22 min
Grzegórzki23 min
Bieżanów-Prokocim27 min
Stare Miasto33 min
Prądnik Czerwony33 min
Krowodrza34 min
Łagiewniki-Borek Fałęcki34 min
Czyżyny35 min
Mistrzejowice42 min
Prądnik Biały44 min
Bronowice49 min
Bieńczyce49 min
Zwierzyniec53 min
Dębniki53 min
Swoszowice55 min
Wzgórza Krzesławickie58 min
Nowa Huta101 min

By public transport and on foot to where most of the district's addresses are; a weekday, by the timetable.

Schools and kindergartens

SZKOŁA PODSTAWOWA NR 47 IM. STEFANA CZARNIECKIEGO W KRAKOWIE575 m79.8%
NIEPUBLICZNA SZKOŁA PODSTAWOWA MAPLE BEAR W KRAKOWIEprivate635 m—
SZKOŁA PODSTAWOWA NR 8 W KRAKOWIE759 m71.5%
BC NIEPUBLICZNA SZKOŁA PODSTAWOWA IM. JANUSZA KORCZAKA W KRAprivate957 m—

The last column is the average 8th-grade exam result (Polish, maths, English), CKE. The city does not publish the school catchment area for each address — check at www.edukacja.krakow.pl.

Kindergartens within 1 km: 15 (public: 3) · nearest: 3 min walk

Nearby

Grocery shops15 within 500 mnearest: 3 min walk
Pharmacies0 within 500 mnearest: 9 min walk
Doctors, clinics5 within 1 kmnearest: 5 min walk
Playgrounds15 within 500 mnearest: 4 min walk
Cafés and restaurants6 within 500 mnearest: 4 min walk
City bike hire1 within 500 mnearest: 4 min walk
Gyms4 within 1 kmnearest: 5 min walk
Park & Ride1 within 2 kmnearest: 19 min walk
EV chargers0 within 1 km

Green space, noise, air

15% of the area within 500 m — parks, forests, lawns

Nearest green area: 1 min walk · park «Park Rzeczny Ogród Płaszów» — 345 m

Noise: roads55+ dB · moderate
Noise: tramsquiet (below 55 dB)
Noise: railwayquiet (below 55 dB)
Noise: industryquiet (below 55 dB)

Strategic noise map, LDWN (24 h). Limit for blocks of flats: 68 dB from roads, trams and railways (70 dB in a big city's centre zone), 60 dB from aircraft, 55 dB from industry. WHO recommends up to 53 dB from roads.

Loading air quality…

Risks and restrictions

Flood once in 10 yearsno
Flood once in 100 yearsno
Flood once in 500 yearsin a flood zone · water 0.5–2 m
Flood if a levee breaksin a flood zone · water 0.5–2 m
Paid parkingno

Flood zones — ISOK (Wody Polskie); 1 cell ≈ 7 m. Being in the Q1% zone affects insurance and mortgages.

What may be built nearby

Local zoning plan (MPZP)№XXVIII/710/19 REJON ULICY PRZEWÓZ · resolution
Land use within 150 m
MN/MWn Tereny zabudowy mieszkaniowej jednorodzinnej lub wielorodzinnej niskiej intensywności
KDD Tereny dróg publicznych klasy dojazdowej · 16 m
MW Tereny zabudowy mieszkaniowej wielorodzinnej · 38 m
U Tereny zabudowy usługowej · 74 m
ZD Tereny ogrodów działkowych · 99 m
MW/U Tereny zabudowy mieszkaniowej wielorodzinnej lub usługowej · 106 m
City-owned land within 200 m2 plots, nearest 114 m

MW — blocks of flats, MN — houses, U — services, ZP — parks, KD — roads.

Sun

Calculating…

Sources: GTFS, OpenStreetMap, city GIS, ISOK, GIOŚ, RSPO, CKE, GUGiK. Source status

Sales, charts and filters (311 sales)

Area: Radius 300 m · 311 sales with filters applied

Market
Rooms
Area, m²
Floor
Period
Median, 12 mo.
13,500 zł/m²
96 sales
Difference from the city, 12 mo.
-10.1%
city: 15,016 zł/m²
Difference from the district
-16.5%
Podgórze: 16,163 zł/m²
Change over the year
-16.9%
prices within the same market (new builds with new builds)
Median price
745,563 zł
area 56.2 m²
All time
12,549 zł/m²
311 sales · primary market 73%
Company buyers
1%
share of sales in 12 mo.

Median price per m² by quarter

The band is the middle 50% of sales in the area. Quarters with fewer than 3 sales in the area are skipped. The last quarter is incomplete.

Distribution of price per m²

8,000–9,000 zł/m²: 13 sales9,000–10,000 zł/m²: 18 sales10,000–11,000 zł/m²: 46 sales11,000–12,000 zł/m²: 52 sales12,000–13,000 zł/m²: 50 sales13,000–14,000 zł/m²: 62 sales14,000–15,000 zł/m²: 12 sales15,000–16,000 zł/m²: 30 sales16,000–17,000 zł/m²: 13 sales17,000–18,000 zł/m²: 5 sales18,000–19,000 zł/m²: 6 sales19,000–20,000 zł/m²: 4 sales891011121314151617181920

area median 12,549 zł/m² city median 15,016 zł/m² · k zł/m², 311 sales

Resales

27 sales — flats sold twice. Median price change +33.1% over a median of 5.6 mo. between deeds.

The first price mostly comes from the developer's handover deed and was agreed 1–3 years earlier, so the difference shows growth over a longer period.

AddressAreaBoughtPriceSoldPriceDifference
Przewóz 1076.206.05.2026750,00011.08.2026935,000+24.7%
Myśliwska 3A56.513.07.2023553,99009.03.20261,150,000+107.6%
Przewóz 654.926.06.2023532,72403.03.2026710,000+33.3%
Lipska 658.906.06.20241,020,00031.01.20261,110,000+8.8%
Myśliwska 3B43.427.11.2023670,00009.04.2025830,000+23.9%
Myśliwska 3A74.317.05.2024905,00003.03.20251,300,000+43.6%
Lipska 663.509.02.20241,010,00010.02.20251,010,0000%
Myśliwska 3A42.311.08.2023467,30023.12.2024795,000+70.1%
Myśliwska 3A52.917.08.2023638,23811.12.2024854,000+33.8%
Przewóz 2531.931.08.2023363,48802.09.2024635,000+74.7%
Przewóz 632.528.06.2023357,28021.08.2024450,000+26%
Myśliwska 3B6528.09.2023642,90018.04.2024650,000+1.1%
Myśliwska 3A6317.10.2023707,52003.04.20241,037,000+46.6%
Myśliwska 3A66.819.10.2023876,00012.03.20241,165,700+33.1%
Myśliwska 3A62.204.08.2023699,96007.03.20241,182,500+68.9%
Myśliwska 3B41.130.08.2023559,59604.03.2024740,000+32.2%
Myśliwska 3A54.926.10.2023628,31120.02.2024699,900+11.4%
Myśliwska 3A42.612.09.2023406,90003.01.2024710,000+74.5%
Myśliwska 3B43.307.08.2023535,62328.12.2023679,000+26.8%
Myśliwska 3B43.416.08.2023505,85727.11.2023670,000+32.4%
Myśliwska 3A45.516.08.2023397,24014.11.2023597,200+50.3%
Myśliwska 3A58.121.07.2023650,26908.11.2023950,000+46.1%
Myśliwska 3A42.629.06.2023501,51402.11.2023620,000+23.6%
Myśliwska 3B39.210.07.2023450,40003.10.2023600,000+33.2%
Myśliwska 3B41.230.08.2023484,50022.09.2023574,125+18.5%
Myśliwska 3A42.630.06.2023508,80601.09.2023700,000+37.6%
Myśliwska 3B41.113.07.2023469,00030.08.2023559,596+19.3%

Sales (311)

CSV
DateAddressFloorRoomsAreaPricezł/m²Market
02.10.2026Księdza Ignacego Stoszki 132361.3735,00011,990resale
21.09.2026Przewóz 185238.8730,00018,810resale
25.08.2026Przewóz 44374984,73313,300new
24.08.2026Przewóz 93487.31,072,00012,279resale
11.08.2026Przewóz 101476.2935,00012,270resale
31.07.2026Przewóz 183245.5720,00015,807resale
27.07.2026Przewóz 43374.31,002,51013,500new
20.07.2026Przewóz 44370.4950,40013,500new
14.07.2026Przewóz 44371.7965,00013,455new
24.06.2026Przewóz 105348.1790,00016,424resale
19.06.2026Przewóz 43374.21,002,10513,500new
19.06.2026Przewóz 43473.4895,42312,196new
16.06.2026Przewóz 41473.2988,47013,500new
11.06.2026Przewóz 45371.9970,65013,500new
10.06.2026Przewóz 91241500,00012,195resale
03.06.2026Przewóz 44352.1665,33912,768new
02.06.2026Przewóz 42466.7867,62013,000new
01.06.2026Przewóz 45360.4769,01412,726new
01.06.2026Przewóz 44232.4418,74412,936new
28.05.2026Przewóz 45359.2740,00012,500new
25.05.2026Przewóz 42477.91,052,05513,500new
21.05.2026Przewóz 42372.2974,29513,500new
20.05.2026Przewóz 45246.3578,25012,500new
19.05.2026Przewóz 42365.2879,52513,500new
19.05.2026Przewóz 43477.81,023,19613,150new
19.05.2026Przewóz 44359797,17513,500new
07.05.2026Przewóz 45131.1476,39815,338new
07.05.2026Przewóz 43358.7799,42013,621new
06.05.2026Przewóz 101476.2750,0009,843resale
05.05.2026Przewóz 43232.2495,04615,379new
05.05.2026Przewóz 42131481,55615,559new
05.05.2026Przewóz 44372983,32613,665new
05.05.2026Przewóz 42232.2483,15015,000new
30.04.2026Przewóz 41477.81,042,11813,400new
30.04.2026Przewóz 43238.8563,54714,539new
29.04.2026Przewóz 42466.9869,18013,000new
29.04.2026Przewóz 43247705,15015,000new
29.04.2026Przewóz 84352.5750,00014,286resale
27.04.2026Przewóz 44232.4382,11511,797new
24.04.2026Przewóz 41357.6806,68014,000new
23.04.2026Przewóz 44131.1475,11915,292new
23.04.2026Przewóz 45130.5457,05015,000new
23.04.2026Przewóz 43131.1475,07815,281new
22.04.2026Przewóz 44366.6793,21811,914new
21.04.2026Przewóz 42238.8594,97415,338new
17.04.2026Przewóz 43377.71,061,42313,659new
16.04.2026Przewóz 42232.2483,15015,000new
16.04.2026Przewóz 43366.4896,40013,500new
16.04.2026Przewóz 42352711,88013,677new
16.04.2026Przewóz 42358.9794,88013,500new
14.04.2026Przewóz 44366.3895,05013,500new
14.04.2026Przewóz 43371.9965,26913,433new
14.04.2026Przewóz 43477.91,012,70013,000new
14.04.2026Przewóz 43232.3427,89413,231new
13.04.2026Przewóz 44247.1599,34012,722new
10.04.2026Przewóz 44466.8808,65712,098new
10.04.2026Przewóz 43466.9809,01712,098new
10.04.2026Przewóz 41353.6743,32713,858new
09.04.2026Przewóz 44131.1465,90015,000new
09.04.2026Przewóz 45249.3616,56812,517new
09.04.2026Przewóz 45131477,38515,390new
07.04.2026Przewóz 43130.5456,90015,000new
07.04.2026Przewóz 41235.7463,84013,000new
02.04.2026Przewóz 45365890,80313,703new
02.04.2026Przewóz 41235.7463,84013,000new
02.04.2026Przewóz 42130.5457,05015,000new
02.04.2026Przewóz 42359796,23013,500new
01.04.2026Przewóz 45366.7899,77513,500new
01.04.2026Przewóz 45366.4832,86412,549new
01.04.2026Przewóz 44477.9946,96712,158new
31.03.2026Przewóz 41352.1738,82414,186new
31.03.2026Przewóz 44232.4495,66715,308new
31.03.2026Przewóz 43131465,45015,000new
30.03.2026Przewóz 43238.9505,88313,005new
30.03.2026Przewóz 43238.8595,53915,349new
30.03.2026Przewóz 43352.2652,12512,500new
30.03.2026Księdza Ignacego Stoszki 91370.4710,00010,085resale
27.03.2026Przewóz 44477.81,011,86113,006new
26.03.2026Przewóz 44471.5928,22312,988new
26.03.2026Przewóz 43466.9856,06412,800new
26.03.2026Przewóz 42238.8500,00412,900new
25.03.2026Przewóz 44246.2583,87212,632new
25.03.2026Przewóz 42232.3477,30414,786new
25.03.2026Przewóz 42232.2477,49714,834new
24.03.2026Przewóz 42470.8920,27013,000new
24.03.2026Przewóz 43359.1747,79912,653new
23.03.2026Przewóz 44238.9583,20015,000new
23.03.2026Przewóz 42247586,87512,500new
19.03.2026Przewóz 42130.9463,80015,000new
09.03.2026Myśliwska 3A2356.51,150,00020,372resale
03.03.2026Przewóz 62254.9710,00012,928resale
31.01.2026Lipska 65358.91,110,00018,839resale
27.01.2026Przewóz 141255.9750,00013,417resale
22.01.2026Myśliwska 3B3243.3800,00018,476resale
30.12.2025Księdza Ignacego Stoszki 92371.4725,00010,154resale
11.12.2025Przewóz 183239.2710,00018,117resale
02.10.2025Przewóz 132367.21,020,00015,190resale
30.09.2025Lipska 43350.3955,00018,971resale
01.09.2025Przewóz 101131.3506,50016,182resale
18.07.2025Lipska 63350.1850,00016,976resale
16.07.2025Przewóz 85358.1860,00014,802resale
09.06.2025Stróża Rybna 202236465,00012,917resale
10.04.2025Księdza Ignacego Stoszki 133231.6423,16013,391resale
09.04.2025Myśliwska 3B1243.4830,00019,142resale
24.03.2025Przewóz 144355.1775,00014,065resale
11.03.2025Przewóz 142355.7760,00013,645resale
03.03.2025Myśliwska 3A2474.31,300,00017,499resale
10.02.2025Lipska 65363.51,010,00015,901resale
23.12.2024Myśliwska 3A1242.3795,00018,772resale
23.12.2024Przewóz 143359.41,033,00017,391resale
11.12.2024Myśliwska 3A5352.9854,00016,153resale
24.10.2024Przewóz 92240.6540,00013,300resale
02.09.2024Przewóz 254131.9635,00019,937resale
29.08.2024Lipska 65463.91,050,00016,427resale
21.08.2024Przewóz 64132.5450,00013,855resale
07.08.2024Przewóz 123355.4886,40016,000resale
18.07.2024Przewóz 93240.4550,00013,614resale
01.07.2024Lipska 43350.3840,00016,696resale
24.06.2024Przewóz 85353.1820,00015,443resale
06.06.2024Lipska 65358.91,020,00017,312resale
23.05.2024Stróża Rybna 203236370,00010,278resale
17.05.2024Myśliwska 3A2474.3905,00012,182new
07.05.2024Myśliwska 3B5474.1990,00013,366new
06.05.2024Myśliwska 3B2474.3995,00013,392new
18.04.2024Myśliwska 3B1365650,0009,995resale
03.04.2024Przewóz 91387.6985,00011,244resale
03.04.2024Myśliwska 3A23631,037,00016,471resale
22.03.2024Myśliwska 3A3474.1990,00013,353new
22.03.2024Myśliwska 3B4474.3976,00013,139new
22.03.2024Przewóz 121131.6470,00014,873resale
14.03.2024Przewóz 81136600,00016,667resale
12.03.2024Myśliwska 3A4366.81,165,70017,443resale
07.03.2024Myśliwska 3A2362.21,182,50019,027resale
05.03.2024Przewóz 105358.2800,00013,746resale
04.03.2024Myśliwska 3B3241.1740,00017,987resale
29.02.2024Przewóz 255250.2700,00013,953new
20.02.2024Myśliwska 3A2354.9699,90012,749resale
16.02.2024Przewóz 82352.3630,00012,046resale
09.02.2024Lipska 65363.51,010,00015,901resale
08.02.2024Lipska 61348750,00015,615resale
01.02.2024Przewóz 92245.9590,00012,854resale
16.01.2024Przewóz 64372.4766,66910,595new
04.01.2024Przewóz 61261.6646,38010,500new
03.01.2024Myśliwska 3A2242.6710,00016,663resale
02.01.2024Lipska 41247.2700,00014,824resale
28.12.2023Myśliwska 3B5243.3679,00015,689resale
22.12.2023Przewóz 104130.8484,00015,714resale
21.12.2023Przewóz 62468.8743,04010,800new
15.12.2023Myśliwska 3A1364.5799,00012,382new
11.12.2023Myśliwska 3B1365.2699,00010,719new
05.12.2023Przewóz 101355.1749,00013,593resale
01.12.2023Myśliwska 3B2366.9699,00010,441new
01.12.2023Myśliwska 3B2365.5870,00013,278new
27.11.2023Myśliwska 3B1243.4670,00015,452resale
23.11.2023Przewóz 62372.2763,07410,573new
17.11.2023Przewóz 63372.4765,69710,580new
14.11.2023Myśliwska 3A5245.5597,20013,117resale
08.11.2023Myśliwska 3A3358.1950,00016,343resale
03.11.2023Przewóz 62258.1627,15610,800new
03.11.2023Przewóz 62258.2628,23610,800new
02.11.2023Myśliwska 3A3242.6620,00014,551resale
31.10.2023Myśliwska 3B1363.7833,00013,069resale
31.10.2023Myśliwska 3B4233.7288,4008,548new
26.10.2023Myśliwska 3A2354.9628,31111,445new
26.10.2023Myśliwska 3A3470.6636,7009,015new
26.10.2023Przewóz 62261.7666,03610,800new
19.10.2023Myśliwska 3A4366.8876,00013,108new
17.10.2023Myśliwska 3A2363707,52011,238new
05.10.2023Myśliwska 3A44100.7882,0008,760new
05.10.2023Przewóz 62257615,92410,800new
03.10.2023Myśliwska 3B2239.2600,00015,318resale
03.10.2023Myśliwska 3A4355.4649,33411,727new
29.09.2023Myśliwska 3B3365.5909,00013,882new
29.09.2023Przewóz 63258.2628,99210,800new
28.09.2023Myśliwska 3B1365642,9009,886new
26.09.2023Przewóz 252240.7473,45511,639new
25.09.2023Przewóz 81352.3650,00012,428resale
25.09.2023Przewóz 254352.8429,1208,127new
22.09.2023Myśliwska 3B5241.2574,12513,952resale
22.09.2023Przewóz 251245.1500,00011,077new
22.09.2023Myśliwska 3A3360.2800,00013,289new
21.09.2023Przewóz 251134.3393,79211,488new
19.09.2023Przewóz 252132.3360,13611,146new
12.09.2023Myśliwska 3A2242.6406,9009,549new
12.09.2023Myśliwska 3B3357.3659,12211,501new
07.09.2023Lipska 43232.3540,00016,734resale
07.09.2023Przewóz 251245.1543,32812,050new
05.09.2023Przewóz 251241.6472,75211,364new
05.09.2023Przewóz 13—241.8525,00012,572resale
04.09.2023Przewóz 252132.7250,2007,647new
01.09.2023Myśliwska 3A4242.6700,00016,432resale
01.09.2023Myśliwska 3B4241.5524,20812,641new
01.09.2023Myśliwska 3A5453.8565,60010,507new
31.08.2023Przewóz 253486.7998,78411,527new
31.08.2023Przewóz 254131.9363,48811,412new
30.08.2023Myśliwska 3B5241.2484,50011,774new
30.08.2023Myśliwska 3B3241.1559,59613,602resale
30.08.2023Przewóz 65377.4843,70210,895new
29.08.2023Przewóz 255240329,3608,228new
24.08.2023Myśliwska 3B1241.2465,00011,289new
23.08.2023Przewóz 255353678,95212,798new
23.08.2023Przewóz 252132.9235,1307,156new
22.08.2023Myśliwska 3B4365.1816,00012,544new
22.08.2023Myśliwska 3A3365.1820,00012,588new
22.08.2023Myśliwska 3A2242470,00011,201new
22.08.2023Myśliwska 3A1242.6468,30010,998new
21.08.2023Przewóz 252131.8352,17911,082new
21.08.2023Przewóz 253240.3465,22111,550new
21.08.2023Przewóz 254240.5471,39611,625new
21.08.2023Przewóz 251244.8344,3257,691new
21.08.2023Przewóz 253132.2363,44011,273new
21.08.2023Myśliwska 3A5242.7550,00012,878resale
18.08.2023Przewóz 252140.8357,2918,761new
18.08.2023Przewóz 253131.8355,41011,183new
18.08.2023Przewóz 254132.5264,3208,145new
17.08.2023Myśliwska 3A5352.9638,23812,072new
17.08.2023Przewóz 64377.6930,84012,000new
17.08.2023Przewóz 65257.1599,34010,500new
16.08.2023Myśliwska 3A5245.5397,2408,725new
16.08.2023Myśliwska 3A5242.7374,6808,773new
16.08.2023Myśliwska 3B1243.4505,85711,666new
11.08.2023Myśliwska 3A1242.3467,30011,034new
11.08.2023Przewóz 121352.3620,00011,855resale
10.08.2023Myśliwska 3B4239.2463,80011,841new
09.08.2023Przewóz 63261.7666,46810,800new
08.08.2023Przewóz 104358.1760,00013,081resale
07.08.2023Myśliwska 3B5243.3535,62312,376new
04.08.2023Myśliwska 3A5362.1834,20013,425new
04.08.2023Myśliwska 3A3362.1701,99811,301new
04.08.2023Myśliwska 3A2362.2699,96011,262new
04.08.2023Przewóz 62365.9692,37010,500new
28.07.2023Myśliwska 3A45113.61,020,8008,989new
26.07.2023Przewóz 65257.3589,77810,300new
25.07.2023Myśliwska 3B2237.3417,24011,186new
25.07.2023Myśliwska 3A2242.4406,9009,606resale
25.07.2023Myśliwska 3B3237.4412,00011,022new
25.07.2023Przewóz 65138.5414,11710,762new
21.07.2023Myśliwska 3A3358.1650,26911,186new
21.07.2023Myśliwska 3A2242.4406,9009,606new
21.07.2023Myśliwska 3B4355.8575,00010,305new
19.07.2023Myśliwska 3B2241.5511,02112,308new
19.07.2023Myśliwska 3A5469.2806,60011,658new
18.07.2023Myśliwska 3A2354.6622,68711,409new
17.07.2023Myśliwska 3B5237.4455,00012,179new
17.07.2023Myśliwska 3A5358.1750,00012,918new
17.07.2023Myśliwska 3A3245.6538,78311,808new
17.07.2023Myśliwska 3A5360.1811,50013,507new
17.07.2023Myśliwska 3A1363.2629,7009,971new
14.07.2023Przewóz 63258.3629,20810,800new
13.07.2023Myśliwska 3A2356.5553,9909,814new
13.07.2023Myśliwska 3B3241.1469,00011,400new
13.07.2023Przewóz 64258.6603,58010,300new
12.07.2023Myśliwska 3A3353.3649,31412,182new
12.07.2023Myśliwska 3B4363.4730,00011,511new
12.07.2023Myśliwska 3B5357.3750,30013,094new
12.07.2023Myśliwska 3B1476.3756,5909,921new
12.07.2023Myśliwska 3A5238.2394,00010,309new
11.07.2023Myśliwska 3A3356646,20811,537new
11.07.2023Myśliwska 3B5366.9757,00011,317new
11.07.2023Myśliwska 3B1241.6452,80010,895new
10.07.2023Myśliwska 3A5356.1744,00013,267new
10.07.2023Myśliwska 3A4242.4510,16212,038new
10.07.2023Myśliwska 3B2239.2450,40011,499new
10.07.2023Przewóz 62138.3401,73010,500new
07.07.2023Myśliwska 3A3238.3410,00010,716new
07.07.2023Myśliwska 3A4472.1765,00010,609new
07.07.2023Przewóz 63132.8360,80011,000new
06.07.2023Myśliwska 3B5373735,90010,081new
06.07.2023Myśliwska 3A2358.5649,00011,100new
06.07.2023Przewóz 64138.4403,41010,500new
06.07.2023Przewóz 63468.7721,24510,500new
05.07.2023Myśliwska 3B5365.5851,00012,998new
05.07.2023Myśliwska 3B1360.3691,11511,456new
05.07.2023Myśliwska 3B2355.9621,50011,114new
05.07.2023Myśliwska 3B3365.6839,54012,806new
05.07.2023Przewóz 61258.3582,60010,000new
05.07.2023Przewóz 64468.7700,40310,200new
04.07.2023Przewóz 64257590,12310,353new
04.07.2023Myśliwska 3B3243.3520,47212,020new
04.07.2023Myśliwska 3A1358.2665,00011,418new
04.07.2023Myśliwska 3A1470.6670,5509,494new
03.07.2023Przewóz 63365.9659,40010,000new
03.07.2023Przewóz 64356.9635,43811,166new
03.07.2023Myśliwska 3A1245.2566,75012,553new
03.07.2023Myśliwska 3A1367675,65010,078new
03.07.2023Myśliwska 3A2471.9951,00013,232new
03.07.2023Myśliwska 3A4356.5650,15411,503new
30.06.2023Przewóz 65254.7539,0129,858new
30.06.2023Przewóz 63132.4352,64410,877new
30.06.2023Myśliwska 3A4242.6508,80611,944new
29.06.2023Przewóz 62132.4339,09910,456new
29.06.2023Przewóz 63138.6404,98510,500new
29.06.2023Myśliwska 3A3242.6501,51411,770new
29.06.2023Myśliwska 3B3473702,0009,622new
29.06.2023Myśliwska 3B3473.8946,07612,819new
28.06.2023Przewóz 64132.5357,28011,000new
28.06.2023Przewóz 63257.1570,60010,000new
28.06.2023Myśliwska 3B2475.7720,0009,512new
28.06.2023Myśliwska 3B4475.5748,0009,903new
27.06.2023Przewóz 62132.8342,53010,456new

Showing 300 most recent. All 311 — in the CSV.

Data: Rejestr Cen Nieruchomości (GUGiK), PRG addresses, district boundaries from the city's open data or OpenStreetMap. Sales up to 30.10.2026; entries reach the register about 1.5 months after the sale on average, so the last ~3 months are incomplete. The price is the gross price from the notarial deed; only sales of whole flats on the open market are included.