Kwadrato Łódź
Street

Listopadowa flat prices and neighbourhood

Typical price here
4,697 zł/m²
middle 50% of sales: 4,443 – 5,403 zł/m²
43 sales over 24 months · Whole street
Typical flat 47.3 m² ≈ 222,123 zł
≈ 1,063 zł per month with a 20% down payment and a 30-year mortgage
Compared with the city-49.3%
Change over the year—
Typical flat47.3 m²

Location

Scores 1–10 are the median of the map blocks that hold this place's addresses (blocks: 15); a block weighs as much as the number of these addresses in it. Pros, cons and risks depend on the building: open a specific address.

Transport1/10
poor
across map blocks — from 1 to 2
Shops nearby2/10
poor
across map blocks — from 1 to 2
Schools and kindergartens6/10
average
across map blocks — from 4 to 7
Quiet10/10
excellent
the same in every map block
Green space6/10
average
across map blocks — from 3 to 8
Low risk10/10
excellent
the same in every map block
On the map:

What buying will cost

For a typical flat here — 222,123 zł, 47.3 m², 80% mortgage over 30 years at 5.98%.

Cash up front51,682 zł
Monthly payment1,063 zł
Taxes and notary7,258 zł

Calculate for your situation →

Location in detail: stops, schools, green space, sun

Location card

from the centre of the area

Transport

99 min to the centre at 7:45 on a weekday — on foot

No stops within 600 m.

Time to other districts at 7:45: 2 of 36 within 30 min
Dolina Łódki — your district29 min
Stoki-Sikawa-Podgórze23 min
Mileszki55 min
Widzew-Wschód56 min
Nowosolna58 min
Śródmieście-Wschód69 min
Olechów-Janów77 min
Stary Widzew79 min
Bałuty-Doły86 min
Zarzew86 min
Julianów-Marysin-Rogi93 min
Wzniesień Łódzkich98 min
Katedralna101 min
Osiedle nr 33103 min
Chojny-Dąbrowa111 min
Górniak113 min
Stare Polesie116 min
Bałuty-Centrum120 min
Andrzejówover 2 h
Bałuty Zachodnieover 2 h
Chojnyover 2 h
Karolew-Retkinia Wschódover 2 h
Kozinyover 2 h
Łagiewnikiover 2 h
Lublinek-Pienistaover 2 h
Nad Neremover 2 h
Osiedle im. Józefa Montwiłła-Mireckiegoover 2 h
Piastów-Kurakover 2 h
Radogoszczover 2 h
Retkinia Zachód-Smulskoover 2 h
Rokicieover 2 h
Rudaover 2 h
Teofilów-Wielkopolskaover 2 h
Wiskitnoover 2 h
Zdrowie-Maniaover 2 h
Złotnoover 2 h

By public transport and on foot to where most of the district's addresses are; a weekday, by the timetable.

Schools and kindergartens

SZKOŁA PODSTAWOWA NR 139 IM. WOJSKA POLSKIEGO649 m78.2%
SZKOŁA PODSTAWOWA NR 1581,327 m62.9%
SZKOŁA PODSTAWOWA SPECJALNA NR 1451,378 m31.1%

The last column is the average 8th-grade exam result (Polish, maths, English), CKE. The city does not publish the school catchment area for each address — check at nabor.pcss.pl/lodz.

Kindergartens within 1 km: 2 (public: 2) · nearest: 12 min walk

Nearby

Grocery shops0 within 500 mnearest: 11 min walk
Pharmacies0 within 500 mnearest: 17 min walk
Doctors, clinics0 within 1 kmnearest: 19 min walk
Playgrounds0 within 500 mnearest: 11 min walk
Cafés and restaurants0 within 500 mnearest: 21 min walk
City bike hire0 within 500 mnearest: 40 min walk
Gyms0 within 1 kmnearest: 50 min walk
Park & Ride0 within 2 km
EV chargers0 within 1 km

Green space, noise, air

42% of the area within 500 m — parks, forests, lawns

Nearest green area: right nearby · park «Park na Giewoncie» — 504 m

Noise: roadsquiet (below 55 dB)
Noise: tramsquiet (below 55 dB)
Noise: railwayquiet (below 55 dB)
Noise: airportquiet (below 55 dB)
Noise: industryquiet (below 55 dB)

Strategic noise map, LDWN (24 h). Limit for blocks of flats: 68 dB from roads, trams and railways (70 dB in a big city's centre zone), 60 dB from aircraft, 55 dB from industry. WHO recommends up to 53 dB from roads.

Loading air quality…

Risks and restrictions

Flood once in 10 yearsno
Flood once in 100 yearsno
Flood once in 500 yearsno
Paid parkingno

Flood zones — ISOK (Wody Polskie); 1 cell ≈ 7 m. Being in the Q1% zone affects insurance and mortgages.

What may be built nearby

Local zoning plan (MPZP)none — development is approved by WZ decisions
Plan in preparation№ Hyrna, Listopadowa
Land use within 150 m
12KD-L1/2 Drogi lokalne · 24 m
48MN Zabudowa mieszkaniowa jednorodzinna · 39 m
40KD-D1/2 Drogi dojazdowe · 51 m
16E Urządzenia infrastruktury technicznej - stacja trafo · 64 m
3KD-Z1/2 Drogi zbiorcze · 107 m
1KDZ Teren drogi zbiorczej · 125 m
1PEF-RN-ZN Teren eletrowni słonecznej lub rolnictwa z zakazem zabudowy lub zieleni naturalnej · 129 m
City general plan (POG)1340SJ strefa wielofunkcyjna z zabudową mieszkaniową jednorodzinną
draft (not in force yet), height up to 8.5 m, building coverage up to 50%, intensity up to 0.5, biologically active area from 30%

MW — blocks of flats, MN — houses, U — services, ZP — parks, KD — roads.

Sources: GTFS, OpenStreetMap, city GIS, ISOK, GIOŚ, RSPO, CKE, GUGiK. Source status

Sales, charts and filters (43 sales)

Area: Whole street · 43 sales with filters applied

Market
Rooms
Area, m²
Floor
Period
Median, 12 mo.
4,697 zł/m²
43 sales
Difference from the city, 12 mo.
-49.3%
city: 9,264 zł/m²
Change over the year
—
too few sales to compare
Median price
280,000 zł
area 47.3 m²
All time
4,697 zł/m²
43 sales · primary market 76.7%
Company buyers
0%
share of sales in 12 mo.

Median price per m² by quarter

The band is the middle 50% of sales in the area. Quarters with fewer than 3 sales in the area are skipped. The last quarter is incomplete.

Distribution of price per m²

3,000–4,000 zł/m²: 1 sale4,000–5,000 zł/m²: 29 sales5,000–6,000 zł/m²: 3 sales6,000–7,000 zł/m²: 0 sales7,000–8,000 zł/m²: 0 sales8,000–9,000 zł/m²: 0 sales9,000–10,000 zł/m²: 3 sales10,000–11,000 zł/m²: 4 sales11,000–12,000 zł/m²: 3 sales3456789101112

area median 4,697 zł/m² city median 9,264 zł/m² · k zł/m², 43 sales

Sales (43)

CSV
DateAddressFloorRoomsAreaPricezł/m²Market
21.08.2026Listopadowa 123A3238.7430,00011,100resale
22.06.2026Listopadowa 1113596.6402,8354,168new
13.06.2026Listopadowa 1073235.3399,00011,294resale
12.06.2026Listopadowa 1052240.1185,0004,617new
21.05.2026Listopadowa 1051239.5212,8375,387new
08.05.2026Listopadowa 1053491.4434,3904,752new
07.05.2026Listopadowa 1213463665,00010,547resale
06.05.2026Listopadowa 1111238.1179,5004,711new
30.04.2026Listopadowa 1053363.9300,0004,697resale
21.04.2026Listopadowa 121B3363.6645,00010,137resale
09.04.2026Listopadowa 123A1238.7430,00011,114resale
02.04.2026Listopadowa 1091374.3328,7104,425new
16.03.2026Listopadowa 123B1240.8435,00010,670resale
10.03.2026Listopadowa 1113246.5210,0004,513new
09.03.2026Listopadowa 1073484.6342,0004,044new
25.02.2026Listopadowa 1051356.8295,0005,197new
20.02.2026Listopadowa 1072247.5226,0004,756new
16.02.2026Listopadowa 1111250.8244,0004,798new
11.02.2026Listopadowa 1051238.3175,0004,568new
22.01.2026Listopadowa 1093364.4280,0004,345new
08.01.2026Listopadowa 1053246.5218,0004,685new
02.01.2026Listopadowa 1052238.2168,0004,398new
31.12.2025Listopadowa 1052247.4192,9604,070new
30.12.2025Listopadowa 1093483.5382,3604,579new
30.12.2025Listopadowa 1092247.3200,0004,231new
29.12.2025Listopadowa 1071238.4151,3603,941new
29.12.2025Listopadowa 1071238.5172,0004,462new
29.12.2025Listopadowa 1071240.8169,0004,147new
29.12.2025Listopadowa 1073235.3150,0004,246new
23.12.2025Listopadowa 1053482.5388,4054,710new
23.12.2025Listopadowa 1053362.6308,0004,921new
22.12.2025Listopadowa 1072358.3282,0004,837new
18.12.2025Listopadowa 1071482.7800,0009,676resale
18.12.2025Listopadowa 1051357309,0005,419new
15.12.2025Listopadowa 113C1485.8890,00010,379new
15.12.2025Listopadowa 1093247.3220,0004,652new
08.12.2025Listopadowa 1213348.7485,0009,969resale
05.12.2025Listopadowa 1112237.9160,0004,225new
04.12.2025Listopadowa 1111240.6181,0004,460new
20.11.2025Listopadowa 1091249.2230,0004,675new
17.11.2025Listopadowa 1052240197,0004,921new
14.11.2025Listopadowa 1093237.2172,0004,622new
06.11.2025Listopadowa 1232240.9400,0009,790resale

Data: Rejestr Cen Nieruchomości (GUGiK), PRG addresses, district boundaries from the city's open data or OpenStreetMap. Sales up to 20.10.2026; entries reach the register about 1.5 months after the sale on average, so the last ~3 months are incomplete. The price is the gross price from the notarial deed; only sales of whole flats on the open market are included.