ulica Edwarda Habicha 6
≈ 2,533 zł per month with a 20% down payment and a 30-year mortgage
Location
Pros
- separate cycle track 1 min away
- bike-share station 2 min away
- quiet: noise below 55 dB
- lots of green space: 27% within 500 m
- grocery shops within 500 m: 30
Things to watch out for
- 42 min to the centre by public transport
- tram further than 1 km
Risks
- noise below 55 dB according to the noise map
- outside ISOK flood zones
- NO₂ 16.9 µg/m³ per year — below the 2030 EU limit (20)
- PM2.5 dust 14.5 µg/m³ a year — within the Polish limit of 20, but above the EU limit from 2030 (10)
- no plants with a risk of a major accident (SEVESO) within 2 km
- no plants of the PRTR pollutant register within 1 km
Sources: the city's strategic noise map, ISOK flood maps (Wody Polskie), EEA annual air quality model (1 km), SEVESO and PRTR registers (GIOŚ). The maps are a general guide, not a verdict on an individual building.
What may be built nearby
- A local zoning plan (MPZP) is in force №LXXXV/2213/2014 «rej. ul. Orłów Piastowskich cz. I» — what can be built nearby is already set.
- Allowed by the plan within 150 m: blocks of flats (0 m); streets and roads (13 m).
- Building permits within 500 m in the last 3 years (GUNB): 12 — housing 4, services and offices 1, schools, hospitals, sport 2, roads and bridges 5.
- road or railway, new building · 13 m · permit 29.12.2023budowa drogi gminnej 42KDD na odcinku od drogi 44KDD do drogi 19KDL
- road or railway, new building · 123 m · permit 27.12.2023budowa drogi gminnej ul. Silnikowej od skrzyżowania z ul. herbu Oksza( bez skrzyżowania) do zachodniej granicy działki ew 126/10
- road or railway, new building · 203 m · permit 23.10.2025wniosek o wydanie decyzji o zmianie PnB - UD-XI-WAB-A.6740.72.2022.MJA, DEC NR 36/A/2023- budowa drogi 52KDD- ul. DYREKCYJNEJ, PRZEBUDOWA SI
- school, kindergarten, culture or science, new building · 217 m · permit 06.02.2026Wniosek o pozwolenie na budowę - budowa budynku żłobka
- road or railway, new building · 13 m · permit 29.12.2023
All land uses within 150 m
- blocks of flats · 0 m
- streets and roads · 13 m
Why the price is what it is here
What affects the price here
How we calculate thisDistrict Ursus: similar flats here are on average cheaper by 18.7% compared with the city average.
Effect on the price per m² compared with similar flats in the same district, based on 2022–2026 sales. These are statistical links, not a guarantee for a specific flat.
Developer prices nearby
| Development | Distance | Flats | Median zł/m² | Change |
|---|---|---|---|---|
| ul. Karola Taylora 13 Dantex Holding Spółka z ograniczoną odpowiedzialnością | 419 m | 257 | 15,240 | — |
| Karola Taylora 15 Ursus Equilis Sp. z o.o. | 479 m | 283 | 14,722 | — |
| Warszawska 58a ATAL Spółka Akcyjna | 1,473 m | 8 | 15,907 | -1.5% |
Asking prices from daily price lists (dane.gov.pl), 1.5 km radius.
Location in detail: stops, schools, green space, sun
Location card
from the centre of the areaTransport
42 min to the centre at 7:45 on a weekday (2 transfer(s))
- Habicha · 385 m · 40 departures 7–9 am177207
- Gierdziejewskiego · 451 m · 27 departures 7–9 am207716
- Lalki · 472 m · 77 departures 7–9 am187401517716N35N85
- Zajezdnia Ursus Płn. · 481 m · 40 departures 7–9 am177207
- PKP Ursus · 519 m · 38 departures 7–9 am187194716
Time to other districts at 7:45: 1 of 18 within 30 min
| Ursus — your district | 16 min |
| Włochy | 36 min |
| Bemowo | 42 min |
| Wola | 49 min |
| Ochota | 50 min |
| Śródmieście | 51 min |
| Praga-Północ | 64 min |
| Bielany | 65 min |
| Żoliborz | 65 min |
| Praga-Południe | 68 min |
| Mokotów | 73 min |
| Rembertów | 73 min |
| Targówek | 75 min |
| Ursynów | 77 min |
| Wilanów | 84 min |
| Wesoła | 89 min |
| Białołęka | 97 min |
| Wawer | 98 min |
By public transport and on foot to where most of the district's addresses are; a weekday, by the timetable.
Schools and kindergartens
| SZKOŁA PODSTAWOWA NR 409 W WARSZAWIE | 380 m | — |
|---|---|---|
| SPOŁECZNA SZKOŁA PODSTAWOWA NR 4 IM. WŁADYSŁAWA GRABSKIEGO Sprivate | 510 m | 91.9% |
| SZKOŁA PODSTAWOWA Z ODDZIAŁAMI INTEGRACYJNYMI NR 2 IM. JANA | 985 m | 73.2% |
| SZKOŁA PODSTAWOWA NR 382 IM. WARSZAWSKICH DZIECI | 1,097 m | 79.4% |
The last column is the average 8th-grade exam result (Polish, maths, English), CKE. The city does not publish the school catchment area for each address — check at edukacja.um.warszawa.pl.
Kindergartens within 1 km: 21 (public: 6) · nearest: 2 min walk
Nearby
| Grocery shops | 30 within 500 m | nearest: 1 min walk |
|---|---|---|
| Pharmacies | 1 within 500 m | nearest: 2 min walk |
| Doctors, clinics | 15 within 1 km | nearest: 2 min walk |
| Playgrounds | 33 within 500 m | nearest: 1 min walk |
| Cafés and restaurants | 24 within 500 m | nearest: 3 min walk |
| City bike hire | 1 within 500 m | nearest: 2 min walk |
| Gyms | 11 within 1 km | nearest: 2 min walk |
| Park & Ride | 1 within 2 km | nearest: 27 min walk |
| EV chargers | 1 within 1 km | nearest: 13 min walk |
Green space, noise, air
27% of the area within 500 m — parks, forests, lawns
Nearest green area: right nearby · park «Park Planeta Ursus» — 418 m
| Noise: roads | quiet (below 55 dB) |
|---|---|
| Noise: trams | quiet (below 55 dB) |
| Noise: railway | quiet (below 55 dB) |
| Noise: airport | quiet (below 55 dB) |
| Noise: industry | quiet (below 55 dB) |
Strategic noise map, LDWN (24 h). Limit for blocks of flats: 68 dB from roads, trams and railways (70 dB in a big city's centre zone), 60 dB from aircraft, 55 dB from industry. WHO recommends up to 53 dB from roads.
Risks and restrictions
| Flood once in 10 years | no |
|---|---|
| Flood once in 100 years | no |
| Flood once in 500 years | no |
| Flood if a levee breaks | no |
| Paid parking | no |
Flood zones — ISOK (Wody Polskie); 1 cell ≈ 7 m. Being in the Q1% zone affects insurance and mortgages.
What may be built nearby
| Local zoning plan (MPZP) | №LXXXV/2213/2014 rej. ul. Orłów Piastowskich cz. I · resolution |
|---|---|
| Land use within 150 m | MW(U) zabudowa wielorodzinna z usługami KD-D(G) droga dojazdowa · 13 m KPP plac miejski · 108 m KD-L droga lokalna · 120 m |
MW — blocks of flats, MN — houses, U — services, ZP — parks, KD — roads.
Sources: GTFS, OpenStreetMap, city GIS, ISOK, GIOŚ, RSPO, CKE, GUGiK. Source status
Sales, charts and filters (171 sales)
Area: All flats on the plot · 171 sales with filters applied
Median price per m² by quarter
The band is the middle 50% of sales in the area. Quarters with fewer than 3 sales in the area are skipped. The last quarter is incomplete.
Distribution of price per m²
area median 13,590 zł/m² city median 16,212 zł/m² · k zł/m², 171 sales
Resales
4 sales — flats sold twice. Median price change +31.6% over a median of 5.9 mo. between deeds.
The first price mostly comes from the developer's handover deed and was agreed 1–3 years earlier, so the difference shows growth over a longer period.
| Address | Area | Bought | Price | Sold | Price | Difference |
|---|---|---|---|---|---|---|
| ulica Edwarda Habicha 6 | 39 | 08.10.2025 | 590,151 | 24.04.2026 | 705,000 | +19.5% |
| ulica Edwarda Habicha 6 | 30.1 | 18.09.2025 | 529,967 | 26.03.2026 | 530,000 | 0% |
| ulica Edwarda Habicha 6 | 39 | 08.09.2025 | 514,139 | 25.02.2026 | 815,000 | +58.5% |
| ulica Edwarda Habicha 6 | 39.1 | 25.07.2025 | 515,000 | 10.09.2025 | 740,000 | +43.7% |
Sales (171)
CSV| Date | Address | Floor | Rooms | Area | Price | zł/m² | Market |
|---|---|---|---|---|---|---|---|
| 24.04.2026 | ulica Edwarda Habicha 6 | 4 | 2 | 39 | 705,000 | 18,063 | resale |
| 10.04.2026 | ulica Edwarda Habicha 6 | 4 | 2 | 39 | 521,377 | 13,365 | new |
| 01.04.2026 | ulica Edwarda Habicha 6 | 4 | 3 | 64 | 781,538 | 12,221 | new |
| 01.04.2026 | ulica Edwarda Habicha 6 | 8 | 2 | 40.9 | 555,743 | 13,585 | new |
| 26.03.2026 | ulica Edwarda Habicha 6 | 7 | 1 | 30.1 | 530,000 | 17,579 | resale |
| 25.02.2026 | ulica Edwarda Habicha 6 | 5 | 2 | 39 | 815,000 | 20,924 | resale |
| 17.02.2026 | ulica Edwarda Habicha 6 | 3 | 3 | 64.2 | 876,462 | 13,641 | new |
| 26.01.2026 | ulica Edwarda Habicha 6 | 7 | 2 | 39 | 530,000 | 13,583 | new |
| 19.01.2026 | ulica Edwarda Habicha 6 | 4 | 1 | 30.1 | 492,000 | 16,351 | new |
| 09.01.2026 | ulica Edwarda Habicha 6 | 3 | — | 39 | 465,000 | 11,917 | new |
| 16.12.2025 | ulica Edwarda Habicha 6 | 3 | 2 | 33.4 | 452,706 | 13,550 | new |
| 15.12.2025 | ulica Edwarda Habicha 6 | 2 | 2 | 33.5 | 450,441 | 13,450 | new |
| 09.12.2025 | ulica Edwarda Habicha 6 | 4 | 2 | 38 | 582,306 | 15,328 | new |
| 04.12.2025 | ulica Edwarda Habicha 6 | 5 | 2 | 38.3 | 581,506 | 15,187 | new |
| 28.11.2025 | ulica Edwarda Habicha 6 | 7 | 3 | 61.3 | 692,000 | 11,289 | new |
| 28.11.2025 | ulica Edwarda Habicha 6 | 7 | 2 | 39 | 473,000 | 12,122 | new |
| 21.11.2025 | ulica Edwarda Habicha 6 | 3 | 2 | 38.1 | 434,161 | 11,404 | new |
| 19.11.2025 | ulica Edwarda Habicha 6 | 3 | 2 | 39.2 | 563,927 | 14,386 | new |
| 19.11.2025 | ulica Edwarda Habicha 6 | 3 | 3 | 61.4 | 751,612 | 12,233 | new |
| 17.11.2025 | ulica Edwarda Habicha 6 | 3 | 2 | 39.1 | 570,000 | 14,582 | new |
| 14.11.2025 | ulica Edwarda Habicha 6 | 8 | 2 | 38.5 | 455,765 | 11,835 | new |
| 14.11.2025 | ulica Edwarda Habicha 6 | 8 | 2 | 37.9 | 448,038 | 11,825 | new |
| 13.11.2025 | ulica Edwarda Habicha 6 | 5 | 2 | 38 | 517,478 | 13,607 | new |
| 12.11.2025 | ulica Edwarda Habicha 6 | 2 | 2 | 39 | 519,000 | 13,301 | new |
| 12.11.2025 | ulica Edwarda Habicha 6 | 2 | 2 | 40.9 | 537,279 | 13,146 | new |
| 07.11.2025 | ulica Edwarda Habicha 6 | 2 | 2 | 38.1 | 557,210 | 14,640 | new |
| 06.11.2025 | ulica Edwarda Habicha 6 | 5 | 2 | 39 | 573,049 | 14,686 | new |
| 06.11.2025 | ulica Edwarda Habicha 6 | 5 | 2 | 39.3 | 595,776 | 15,167 | new |
| 04.11.2025 | ulica Edwarda Habicha 6 | 2 | 2 | 38.4 | 457,000 | 11,889 | new |
| 04.11.2025 | ulica Edwarda Habicha 6 | 8 | 2 | 39.1 | 510,000 | 13,047 | new |
| 28.10.2025 | ulica Edwarda Habicha 6 | 7 | 2 | 45.9 | 707,556 | 15,429 | new |
| 28.10.2025 | ulica Edwarda Habicha 6 | 5 | 2 | 38.6 | 448,501 | 11,613 | new |
| 28.10.2025 | ulica Edwarda Habicha 6 | 2 | 2 | 37.9 | 451,353 | 11,903 | new |
| 28.10.2025 | ulica Edwarda Habicha 6 | 6 | 2 | 38.2 | 462,560 | 12,115 | new |
| 27.10.2025 | ulica Edwarda Habicha 6 | 4 | 2 | 36.9 | 565,135 | 15,315 | new |
| 23.10.2025 | ulica Edwarda Habicha 6 | 4 | 3 | 62 | 797,307 | 12,854 | new |
| 21.10.2025 | ulica Edwarda Habicha 6 | 2 | 2 | 38.6 | 464,554 | 12,026 | new |
| 18.10.2025 | ulica Edwarda Habicha 6 | 3 | 2 | 38.1 | 455,000 | 11,952 | new |
| 15.10.2025 | ulica Edwarda Habicha 6 | 5 | 2 | 38.2 | 564,000 | 14,772 | new |
| 08.10.2025 | ulica Edwarda Habicha 6 | 4 | 2 | 39 | 590,151 | 15,120 | new |
| 06.10.2025 | ulica Edwarda Habicha 6 | 6 | 2 | 40 | 602,919 | 15,062 | new |
| 06.10.2025 | ulica Edwarda Habicha 6 | 5 | 2 | 44.7 | 647,972 | 14,506 | new |
| 02.10.2025 | ulica Edwarda Habicha 6 | 4 | 2 | 38.6 | 468,672 | 12,129 | new |
| 02.10.2025 | ulica Edwarda Habicha 6 | 3 | 2 | 45.9 | 673,299 | 14,678 | new |
| 01.10.2025 | ulica Edwarda Habicha 6 | 5 | 2 | 39 | 525,000 | 13,455 | new |
| 01.10.2025 | ulica Edwarda Habicha 6 | 5 | 2 | 38.4 | 439,473 | 11,448 | new |
| 01.10.2025 | ulica Edwarda Habicha 6 | 3 | 2 | 38 | 546,725 | 14,384 | new |
| 29.09.2025 | ulica Edwarda Habicha 6 | 3 | 2 | 38.4 | 458,007 | 11,940 | new |
| 29.09.2025 | ulica Edwarda Habicha 6 | 6 | 2 | 39 | 468,333 | 12,018 | new |
| 29.09.2025 | ulica Edwarda Habicha 6 | 2 | 3 | 64 | 869,101 | 13,590 | new |
| 26.09.2025 | ulica Edwarda Habicha 6 | 8 | 3 | 62 | 756,984 | 12,211 | resale |
| 25.09.2025 | ulica Edwarda Habicha 6 | 3 | 2 | 39 | 454,355 | 11,650 | new |
| 25.09.2025 | ulica Edwarda Habicha 6 | 2 | 2 | 39 | 454,247 | 11,662 | new |
| 24.09.2025 | ulica Edwarda Habicha 6 | 6 | 2 | 40.9 | 569,286 | 13,905 | new |
| 22.09.2025 | ulica Edwarda Habicha 6 | 3 | 2 | 38.8 | 520,000 | 13,416 | new |
| 22.09.2025 | ulica Edwarda Habicha 6 | 6 | 2 | 39.1 | 517,000 | 13,236 | new |
| 19.09.2025 | ulica Edwarda Habicha 6 | 2 | 2 | 38 | 271,840 | 7,144 | new |
| 19.09.2025 | ulica Edwarda Habicha 6 | 7 | 2 | 39.3 | 575,000 | 14,638 | new |
| 18.09.2025 | ulica Edwarda Habicha 6 | 7 | 1 | 30.1 | 529,967 | 17,578 | new |
| 18.09.2025 | ulica Edwarda Habicha 6 | 3 | 2 | 44.7 | 678,652 | 15,199 | new |
| 17.09.2025 | ulica Edwarda Habicha 6 | 6 | 2 | 39.3 | 565,000 | 14,384 | new |
| 17.09.2025 | ulica Edwarda Habicha 6 | 5 | 2 | 40.9 | 491,548 | 12,024 | new |
| 17.09.2025 | ulica Edwarda Habicha 6 | 7 | 2 | 38.1 | 583,259 | 15,297 | new |
| 17.09.2025 | ulica Edwarda Habicha 6 | 8 | 2 | 38.8 | 479,000 | 12,358 | new |
| 16.09.2025 | ulica Edwarda Habicha 6 | 6 | 2 | 37.1 | 571,000 | 15,395 | new |
| 15.09.2025 | ulica Edwarda Habicha 6 | 7 | 2 | 38.8 | 456,000 | 11,765 | new |
| 15.09.2025 | ulica Edwarda Habicha 6 | 7 | 2 | 44.8 | 723,244 | 16,155 | new |
| 12.09.2025 | ulica Edwarda Habicha 6 | 3 | 2 | 40 | 569,213 | 14,213 | resale |
| 11.09.2025 | ulica Edwarda Habicha 6 | 7 | 2 | 38.4 | 410,000 | 10,666 | new |
| 11.09.2025 | ulica Edwarda Habicha 6 | 4 | 2 | 40.1 | 605,000 | 15,084 | new |
| 11.09.2025 | ulica Edwarda Habicha 6 | 2 | 2 | 40 | 618,435 | 15,449 | new |
| 10.09.2025 | ulica Edwarda Habicha 6 | 2 | 2 | 39 | 523,996 | 13,443 | new |
| 10.09.2025 | ulica Edwarda Habicha 6 | 2 | 2 | 38.9 | 513,155 | 13,202 | new |
| 10.09.2025 | ulica Edwarda Habicha 6 | 2 | 2 | 39.1 | 740,000 | 18,931 | resale |
| 09.09.2025 | ulica Edwarda Habicha 6 | 4 | 2 | 37.9 | 453,125 | 11,956 | new |
| 08.09.2025 | ulica Edwarda Habicha 6 | 8 | 2 | 39.1 | 450,000 | 11,521 | new |
| 08.09.2025 | ulica Edwarda Habicha 6 | 4 | 3 | 61.2 | 795,394 | 13,003 | resale |
| 08.09.2025 | ulica Edwarda Habicha 6 | 6 | 2 | 39.1 | 473,669 | 12,117 | new |
| 08.09.2025 | ulica Edwarda Habicha 6 | 7 | 2 | 38.6 | 477,828 | 12,382 | new |
| 08.09.2025 | ulica Edwarda Habicha 6 | 5 | 2 | 39 | 514,139 | 13,200 | new |
| 05.09.2025 | ulica Edwarda Habicha 6 | 4 | 2 | 45.9 | 688,174 | 14,986 | new |
| 05.09.2025 | ulica Edwarda Habicha 6 | 6 | 2 | 38.1 | 581,200 | 15,247 | new |
| 05.09.2025 | ulica Edwarda Habicha 6 | 7 | 2 | 41 | 504,000 | 12,290 | new |
| 05.09.2025 | ulica Edwarda Habicha 6 | 8 | 2 | 45.9 | 735,114 | 16,016 | new |
| 04.09.2025 | ulica Edwarda Habicha 6 | 8 | 2 | 44.6 | 699,765 | 15,686 | new |
| 04.09.2025 | ulica Edwarda Habicha 6 | 8 | 2 | 39.2 | 569,323 | 14,512 | new |
| 04.09.2025 | ulica Edwarda Habicha 6 | 6 | 3 | 64.2 | 903,000 | 14,054 | new |
| 04.09.2025 | ulica Edwarda Habicha 6 | 3 | 1 | 30.1 | 490,250 | 16,260 | new |
| 04.09.2025 | ulica Edwarda Habicha 6 | 6 | 2 | 38.2 | 460,000 | 12,058 | new |
| 04.09.2025 | ulica Edwarda Habicha 6 | 3 | 2 | 40.9 | 549,121 | 13,413 | new |
| 04.09.2025 | ulica Edwarda Habicha 6 | 7 | 2 | 38 | 446,917 | 11,746 | new |
| 03.09.2025 | ulica Edwarda Habicha 6 | 7 | 2 | 38.3 | 558,775 | 14,601 | new |
| 01.09.2025 | ulica Edwarda Habicha 6 | 5 | 3 | 62.1 | 847,275 | 13,642 | new |
| 01.09.2025 | ulica Edwarda Habicha 6 | 2 | 2 | 38.2 | 548,000 | 14,353 | new |
| 01.09.2025 | ulica Edwarda Habicha 6 | 2 | 2 | 45.9 | 715,588 | 15,577 | new |
| 01.09.2025 | ulica Edwarda Habicha 6 | 7 | 2 | 40 | 578,919 | 14,462 | new |
| 27.08.2025 | ulica Edwarda Habicha 6 | 6 | 2 | 38.3 | 563,639 | 14,732 | new |
| 27.08.2025 | ulica Edwarda Habicha 6 | 5 | 2 | 38.8 | 464,557 | 11,973 | new |
| 26.08.2025 | ulica Edwarda Habicha 6 | 6 | 2 | 38.7 | 443,942 | 11,483 | new |
| 26.08.2025 | ulica Edwarda Habicha 6 | 4 | 2 | 40.9 | 435,748 | 10,659 | new |
| 26.08.2025 | ulica Edwarda Habicha 6 | 8 | 2 | 38.4 | 565,000 | 14,729 | new |
| 25.08.2025 | ulica Edwarda Habicha 6 | 6 | 2 | 44.7 | 658,870 | 14,740 | new |
| 25.08.2025 | ulica Edwarda Habicha 6 | 6 | 2 | 38.5 | 539,634 | 14,020 | new |
| 25.08.2025 | ulica Edwarda Habicha 6 | 5 | 1 | 30.2 | 502,920 | 16,658 | new |
| 22.08.2025 | ulica Edwarda Habicha 6 | 2 | 2 | 38.2 | 567,339 | 14,836 | new |
| 22.08.2025 | ulica Edwarda Habicha 6 | 4 | 2 | 38.4 | 515,000 | 13,398 | new |
| 21.08.2025 | ulica Edwarda Habicha 6 | 8 | 2 | 38.1 | 468,431 | 12,295 | new |
| 21.08.2025 | ulica Edwarda Habicha 6 | 5 | 2 | 40.1 | 593,000 | 14,784 | new |
| 21.08.2025 | ulica Edwarda Habicha 6 | 3 | 2 | 38 | 549,251 | 14,458 | new |
| 21.08.2025 | ulica Edwarda Habicha 6 | 2 | 2 | 37 | 603,624 | 16,314 | new |
| 21.08.2025 | ulica Edwarda Habicha 6 | 4 | 2 | 39 | 571,618 | 14,646 | new |
| 20.08.2025 | ulica Edwarda Habicha 6 | 6 | 2 | 38.8 | 474,320 | 12,231 | new |
| 20.08.2025 | ulica Edwarda Habicha 6 | 5 | 2 | 45.8 | 652,380 | 14,238 | new |
| 20.08.2025 | ulica Edwarda Habicha 6 | 6 | 2 | 38.9 | 474,098 | 12,175 | new |
| 20.08.2025 | ulica Edwarda Habicha 6 | 5 | 2 | 39 | 448,938 | 11,523 | new |
| 19.08.2025 | ulica Edwarda Habicha 6 | 8 | 2 | 36.9 | 565,428 | 15,319 | new |
| 19.08.2025 | ulica Edwarda Habicha 6 | 3 | 2 | 39 | 471,000 | 12,071 | new |
| 19.08.2025 | ulica Edwarda Habicha 6 | 4 | 2 | 33.4 | 495,672 | 14,832 | new |
| 19.08.2025 | ulica Edwarda Habicha 6 | 8 | 2 | 38.2 | 592,694 | 15,524 | new |
| 19.08.2025 | ulica Edwarda Habicha 6 | 8 | 2 | 39.9 | 542,366 | 13,593 | new |
| 18.08.2025 | ulica Edwarda Habicha 6 | 7 | 3 | 64.2 | 880,000 | 13,696 | new |
| 18.08.2025 | ulica Edwarda Habicha 6 | 4 | 2 | 38 | 443,944 | 11,667 | new |
| 18.08.2025 | ulica Edwarda Habicha 6 | 6 | 2 | 33.5 | 501,893 | 14,977 | new |
| 18.08.2025 | ulica Edwarda Habicha 6 | 8 | 3 | 61.4 | 830,750 | 13,539 | new |
| 18.08.2025 | ulica Edwarda Habicha 6 | 6 | 2 | 38 | 439,468 | 11,559 | new |
| 18.08.2025 | ulica Edwarda Habicha 6 | 7 | 2 | 33.6 | 505,000 | 15,034 | new |
| 14.08.2025 | ulica Edwarda Habicha 6 | 2 | — | 38.8 | 556,195 | 14,346 | new |
| 14.08.2025 | ulica Edwarda Habicha 6 | 5 | 2 | 38.9 | 541,220 | 13,899 | new |
| 14.08.2025 | ulica Edwarda Habicha 6 | 6 | 3 | 62 | 776,854 | 12,536 | new |
| 14.08.2025 | ulica Edwarda Habicha 6 | 6 | 1 | 30.1 | 507,000 | 16,849 | new |
| 14.08.2025 | ulica Edwarda Habicha 6 | 7 | 2 | 38 | 413,708 | 10,890 | new |
| 13.08.2025 | ulica Edwarda Habicha 6 | 4 | 2 | 38.9 | 467,777 | 12,022 | new |
| 13.08.2025 | ulica Edwarda Habicha 6 | 6 | 3 | 61.3 | 800,516 | 13,048 | new |
| 13.08.2025 | ulica Edwarda Habicha 6 | 3 | 2 | 36.9 | 490,200 | 13,285 | new |
| 13.08.2025 | ulica Edwarda Habicha 6 | 5 | 2 | 38 | 508,503 | 13,399 | new |
| 12.08.2025 | ulica Edwarda Habicha 6 | 6 | 2 | 38.9 | 473,360 | 12,175 | new |
| 12.08.2025 | ulica Edwarda Habicha 6 | 4 | 2 | 38 | 555,954 | 14,642 | new |
| 12.08.2025 | ulica Edwarda Habicha 6 | 8 | 3 | 64.1 | 773,631 | 12,063 | new |
| 12.08.2025 | ulica Edwarda Habicha 6 | 8 | 2 | 38.9 | 536,092 | 13,792 | new |
| 12.08.2025 | ulica Edwarda Habicha 6 | 8 | 2 | 39.2 | 523,692 | 13,377 | new |
| 11.08.2025 | ulica Edwarda Habicha 6 | 4 | 2 | 38.1 | 554,069 | 14,554 | new |
| 08.08.2025 | ulica Edwarda Habicha 6 | 7 | 2 | 38.1 | 564,316 | 14,823 | new |
| 08.08.2025 | ulica Edwarda Habicha 6 | 4 | 2 | 44.6 | 632,070 | 14,172 | new |
| 06.08.2025 | ulica Edwarda Habicha 6 | 4 | 2 | 38.7 | 513,764 | 13,262 | new |
| 06.08.2025 | ulica Edwarda Habicha 6 | 8 | 2 | 39 | 520,000 | 13,326 | new |
| 06.08.2025 | ulica Edwarda Habicha 6 | 8 | 1 | 30.1 | 529,500 | 17,597 | new |
| 06.08.2025 | ulica Edwarda Habicha 6 | 7 | 2 | 37 | 558,469 | 15,102 | new |
| 06.08.2025 | ulica Edwarda Habicha 6 | 7 | 3 | 62.2 | 889,839 | 14,315 | new |
| 06.08.2025 | ulica Edwarda Habicha 6 | 5 | 3 | 61.3 | 795,000 | 12,969 | new |
| 05.08.2025 | ulica Edwarda Habicha 6 | 2 | 2 | 39.2 | 589,308 | 15,022 | new |
| 05.08.2025 | ulica Edwarda Habicha 6 | 7 | 2 | 38.9 | 528,353 | 13,572 | new |
| 04.08.2025 | ulica Edwarda Habicha 6 | 2 | 1 | 30.1 | 489,350 | 16,263 | new |
| 04.08.2025 | ulica Edwarda Habicha 6 | 8 | 2 | 33.6 | 505,000 | 15,034 | new |
| 04.08.2025 | ulica Edwarda Habicha 6 | 5 | 2 | 33.6 | 502,000 | 14,945 | new |
| 04.08.2025 | ulica Edwarda Habicha 6 | 3 | 2 | 38.2 | 548,532 | 14,341 | new |
| 01.08.2025 | ulica Edwarda Habicha 6 | 3 | 3 | 62.1 | 803,919 | 12,950 | new |
| 01.08.2025 | ulica Edwarda Habicha 6 | 2 | 3 | 61.2 | 836,092 | 13,655 | new |
| 01.08.2025 | ulica Edwarda Habicha 6 | 5 | 2 | 38.1 | 565,000 | 14,822 | new |
| 01.08.2025 | ulica Edwarda Habicha 6 | 7 | 2 | 39 | 519,000 | 13,301 | new |
| 31.07.2025 | ulica Edwarda Habicha 6 | 7 | 2 | 39.1 | 510,000 | 13,047 | new |
| 30.07.2025 | ulica Edwarda Habicha 6 | 3 | 2 | 38.9 | 449,533 | 11,559 | new |
| 30.07.2025 | ulica Edwarda Habicha 6 | 4 | 2 | 38.9 | 464,008 | 11,919 | new |
| 29.07.2025 | ulica Edwarda Habicha 6 | 5 | 3 | 64.1 | 883,902 | 13,792 | new |
| 29.07.2025 | ulica Edwarda Habicha 6 | 2 | 3 | 62.1 | 795,498 | 12,812 | new |
| 28.07.2025 | ulica Edwarda Habicha 6 | 6 | 2 | 45.9 | 603,311 | 13,153 | new |
| 28.07.2025 | ulica Edwarda Habicha 6 | 4 | 2 | 39 | 454,462 | 11,662 | new |
| 28.07.2025 | ulica Edwarda Habicha 6 | 5 | 2 | 37 | 553,487 | 14,967 | new |
| 28.07.2025 | ulica Edwarda Habicha 6 | 8 | 2 | 38.8 | 473,992 | 12,232 | new |
| 25.07.2025 | ulica Edwarda Habicha 6 | 2 | 2 | 39.1 | 515,000 | 13,175 | new |
| 25.07.2025 | ulica Edwarda Habicha 6 | 8 | 2 | 38 | 562,896 | 14,797 | new |
| 25.07.2025 | ulica Edwarda Habicha 6 | 3 | 2 | 39 | 537,110 | 13,790 | new |