al. Pracy 30 sale prices and the building's surroundings
≈ 3,260 zł per month with a 20% down payment and a 30-year mortgage
Location
Pros
- tram 3 min away
- separate cycle track 2 min away
- bike-share station 3 min away
- park 5 min away
- grocery shops within 500 m: 21
Things to watch out for
- noise from roads 74+ dB — above the limit for housing (68 dB)
Risks
Noise from roads: 74+ dB over 24 h (LDWN) — above the Polish limit for blocks of flats, 68 dB
- outside ISOK flood zones
- NO₂ 17.8 µg/m³ per year — below the 2030 EU limit (20)
- PM2.5 dust 15.8 µg/m³ a year — within the Polish limit of 20, but above the EU limit from 2030 (10)
- street with noticeable traffic 21 m away (al. Pracy): ≈ 10,782 vehicles a day
- nearest plant with a risk of a major accident (SEVESO) — 1,914 m away: machinery and equipment
- plant of the PRTR pollutant register 711 m away: metallurgy
- Road accidents with injuries nearby in 3 years: 3
Sources: the city's strategic noise map, ISOK flood maps (Wody Polskie), EEA annual air quality model (1 km), road accident data, SEVESO and PRTR registers (GIOŚ). The maps are a general guide, not a verdict on an individual building.
What may be built nearby
- No local zoning plan — new buildings are approved case by case (WZ decisions), so it is harder to predict what will be built next door.
- A new plan is being prepared: 850 Dzielnica urbanistyczna A – Śródmieście. Worth looking at the draft.
- City general plan (POG) for this place: mixed zone with blocks of flats — height up to 18 m, building coverage up to 30%, intensity up to 1.5, biologically active area from 30%.
- 29 city-owned plots within 200 m — they may be built on or used for a road.
- Building permits within 500 m in the last 3 years (GUNB): 4 — housing 1, services and offices 3.
- block of flats, new building · 425 m · permit 27.11.2024zmiana budowa zespołu apartamentowo- biurowego z usługami w parterze i garażami podziemnymi wraz z niezbędną infrastrukturą techniczną- budy
- hotel or dormitory, extension · 426 m · permit 08.06.2026rozbudowa budynku hotelowo-gastronomicznego wraz z zagospodarowaniem terenu i niezbędnymi urządzeniami infrastruktury technicznej
- administrative building, new building · 435 m · permit 16.04.2026rozbudowa jednostki ratowniczo- gaśniczej nr 4 KM PSP we Wrocławiu obejmująca: budowę budynku Straży Pożarnej oraz rozbudowę istniejącego bu
- shop, restaurant or services, extension · 458 m · permit 11.09.2024rozbudowa wolno stojącego budynku usługowo- handlowego
- block of flats, new building · 425 m · permit 27.11.2024
All land uses within 150 m
Why the price is what it is here
What affects the price here
How we calculate thisDistrict Grabiszyn - Grabiszynek: similar flats here are on average pricier by 4.4% compared with the city average.
Effect on the price per m² compared with similar flats in the same district, based on 2022–2026 sales. These are statistical links, not a guarantee for a specific flat.
Developer prices nearby
| Development | Distance | Flats | Median zł/m² | Change |
|---|---|---|---|---|
| ul. Grochowa 17 ATAL Spółka Akcyjna | 1,350 m | 36 | 15,154 | -0.1% |
Asking prices from daily price lists (dane.gov.pl), 1.5 km radius.
What to check yourself before buying
- Land and mortgage register (KW) — owner, mortgages, encumbrances: free of charge at ekw.ms.gov.pl.
- Type of ownership — full ownership or cooperative right; share of the land in perpetual usufruct (annual fee).
- Fees — fees to the owners' association, repair fund, any arrears of the previous owner.
- Building — year built, condition of the roof and façade, planned repairs (owners' association minutes).
- Flat — which way the windows face, ventilation, damp, window frames, heating.
- For a new build — information prospectus, building permit, escrow bank account.
Location in detail: stops, schools, green space, sun
Location card
from the addressTransport
29 min to the centre at 7:45 on a weekday
Public transport accessibility as rated by the city: II — very high
- Aleja Pracy · 49 m · 100 departures 7–9 am45111420A125132136152241248257
- GRABISZYNEK · 265 m · 0 departures 7–9 am20
- Hutmen · 370 m · 111 departures 7–9 am451114124126134246251
- Inżynierska · 389 m · 36 departures 7–9 amA125241
- Ojca Beyzyma · 444 m · 64 departures 7–9 am45111420132136152241248257
Time to other districts at 7:45: 13 of 48 within 30 min
| Grabiszyn - Grabiszynek — your district | 7 min |
| Powstańców Śląskich | 14 min |
| Gajowice | 15 min |
| Borek | 20 min |
| Muchobór Mały | 20 min |
| Oporów | 21 min |
| Przedmieście Świdnickie | 22 min |
| Gądów - Popowice Płd. | 23 min |
| Muchobór Wielki | 25 min |
| Krzyki - Partynice | 26 min |
| Klecina | 29 min |
| Huby | 30 min |
| Nowy Dwór | 30 min |
| Stare Miasto | 31 min |
| Kuźniki | 32 min |
| Nadodrze | 34 min |
| Szczepin | 35 min |
| Tarnogaj | 35 min |
| Przedmieście Oławskie | 37 min |
| Gaj | 38 min |
| Kleczków | 39 min |
| Plac Grunwaldzki | 39 min |
| Pilczyce - Kozanów - Popowice Płn. | 39 min |
| Ołbin | 42 min |
| Jagodno | 42 min |
| Żerniki | 43 min |
| Wojszyce | 45 min |
| Lipa Piotrowska | 46 min |
| Brochów | 47 min |
| Ołtaszyn | 47 min |
| Jerzmanowo - Jarnołtów - Strachowice - Osiniec | 48 min |
| Karłowice - Różanka | 48 min |
| Zacisze - Zalesie - Szczytniki | 49 min |
| Leśnica | 49 min |
| Maślice | 49 min |
| Biskupin - Sępolno - Dąbie - Bartoszowice | 51 min |
| Świniary | 51 min |
| Księże | 52 min |
| Widawa | 55 min |
| Osobowice - Rędzin | 55 min |
| Polanowice - Poświętne - Ligota | 56 min |
| Bieńkowice | 57 min |
| Pracze Odrzańskie | 57 min |
| Kowale | 57 min |
| Sołtysowice | 62 min |
| Strachocin - Swojczyce - Wojnów | 65 min |
| Psie Pole - Zawidawie | 66 min |
| Pawłowice | 72 min |
By public transport and on foot to where most of the district's addresses are; a weekday, by the timetable.
Schools and kindergartens
| SZKOŁA PODSTAWOWA NR 109 IM. EDWARDA DEMBOWSKIEGO | 180 m | 68.1% |
|---|---|---|
| CHRZEŚCIJAŃSKA SZKOŁA PODSTAWOWA "ARKA"private | 876 m | 80.8% |
| NIEPUBLICZNA SZKOŁA PODSTAWOWA "UNLOCK" WE WROCŁAWIUprivate | 959 m | — |
| SZKOŁA PODSTAWOWA NR 82 IM. BUDOWNICZYCH WROCŁAWIA | 1,166 m | 81.8% |
The last column is the average 8th-grade exam result (Polish, maths, English), CKE. The city does not publish the school catchment area for each address — check at rekrutacje.edu.wroclaw.pl.
Kindergartens within 1 km: 6 (public: 5) · nearest: 2 min walk
Nearby
| Grocery shops | 21 within 500 m | nearest: 2 min walk |
|---|---|---|
| Pharmacies | 4 within 500 m | nearest: 2 min walk |
| Doctors, clinics | 13 within 1 km | nearest: 6 min walk |
| Playgrounds | 16 within 500 m | nearest: 2 min walk |
| Cafés and restaurants | 6 within 500 m | nearest: 5 min walk |
| City bike hire | 3 within 500 m | nearest: 3 min walk |
| Gyms | 8 within 1 km | nearest: 6 min walk |
| Park & Ride | 3 within 2 km | nearest: 16 min walk |
| EV chargers | 4 within 1 km | nearest: 8 min walk |
Green space, noise, air
19% of the area within 500 m — parks, forests, lawns
Nearest green area: right nearby · park «aleja Romera» — 247 m
| Noise: roads | 74+ dB · over the limit |
|---|---|
| Noise: trams | quiet (below 55 dB) |
| Noise: railway | quiet (below 55 dB) |
| Noise: airport | quiet (below 55 dB) |
| Noise: industry | quiet (below 55 dB) |
Strategic noise map, LDWN (24 h). Limit for blocks of flats: 68 dB from roads, trams and railways (70 dB in a big city's centre zone), 60 dB from aircraft, 55 dB from industry. WHO recommends up to 53 dB from roads.
Risks and restrictions
| Flood once in 10 years | no |
|---|---|
| Flood once in 100 years | no |
| Flood once in 500 years | no |
| Flood if a levee breaks | no |
| Road accidents in 3 years, 300 m | 68 · with injuries: 3 |
| Paid parking | no |
Flood zones — ISOK (Wody Polskie); 1 cell ≈ 7 m. Being in the Q1% zone affects insurance and mortgages.
What may be built nearby
| Local zoning plan (MPZP) | none — development is approved by WZ decisions |
|---|---|
| Plan in preparation | №850 850 Dzielnica urbanistyczna A – Śródmieście |
| Land use within 150 m | — |
| City general plan (POG) | 3274SW strefa wielofunkcyjna z zabudową mieszkaniową wielorodzinną height up to 18 m, building coverage up to 30%, intensity up to 1.5, biologically active area from 30% |
| City-owned land within 200 m | 29 plots, nearest 43 m |
MW — blocks of flats, MN — houses, U — services, ZP — parks, KD — roads.
Population
Grabiszynek: 10,318 residents (2025), 3,707 per km², children under 18 — 18%, retirement age — 28%
Sun
Sources: GTFS, OpenStreetMap, city GIS, ISOK, GIOŚ, RSPO, CKE, GUGiK. Source status
Sales, charts and filters (187 sales)
Area: Radius 500 m · 187 sales with filters applied
Median price per m² by quarter
The band is the middle 50% of sales in the area. Quarters with fewer than 3 sales in the area are skipped. The last quarter is incomplete.
Distribution of price per m²
area median 12,218 zł/m² city median 12,821 zł/m² · k zł/m², 187 sales
Resales
13 sales — flats sold twice. Median price change +35.4% over a median of 6.4 mo. between deeds.
The first price mostly comes from the developer's handover deed and was agreed 1–3 years earlier, so the difference shows growth over a longer period.
| Address | Area | Bought | Price | Sold | Price | Difference |
|---|---|---|---|---|---|---|
| ul. Inżynierska 38 | 41.1 | 18.03.2026 | 408,000 | 04.09.2026 | 630,000 | +54.4% |
| al. gen. Józefa Hallera 202 | 49.1 | 20.03.2026 | 599,000 | 25.08.2026 | 849,000 | +41.7% |
| al. gen. Józefa Hallera 117 | 31 | 04.12.2025 | 300,000 | 03.06.2026 | 540,000 | +80% |
| al. gen. Józefa Hallera 202 | 49.1 | 29.01.2026 | 650,000 | 01.06.2026 | 839,000 | +29.1% |
| ul. Grabiszyńska 212 | 36.8 | 05.06.2025 | 510,000 | 15.01.2026 | 635,000 | +24.5% |
| al. gen. Józefa Hallera 190 | 76.5 | 18.10.2023 | 885,000 | 04.12.2025 | 990,000 | +11.9% |
| al. gen. Józefa Hallera 153 | 50.5 | 06.04.2023 | 430,000 | 12.12.2024 | 550,000 | +27.9% |
| ul. Makowa 23 | 74 | 11.07.2023 | 845,000 | 28.11.2024 | 1,070,000 | +26.6% |
| ul. Grabiszyńska 230a | 47.5 | 19.03.2024 | 475,000 | 07.11.2024 | 643,000 | +35.4% |
| ul. Inżynierska 80 | 46.7 | 13.02.2024 | 465,000 | 21.08.2024 | 645,000 | +38.7% |
| ul. Inżynierska 50 | 39.4 | 09.08.2023 | 334,000 | 12.04.2024 | 580,000 | +73.7% |
| ul. Grabiszyńska 230b | 53.9 | 28.09.2023 | 390,000 | 10.04.2024 | 692,500 | +77.6% |
| ul. Inżynierska 78 | 26.8 | 31.01.2023 | 245,000 | 23.02.2023 | 285,000 | +16.3% |
Sales (187)
CSV| Date | Address | Floor | Rooms | Area | Price | zł/m² | Market |
|---|---|---|---|---|---|---|---|
| 09.09.2026 | ul. Grabiszyńska 216 | 4 | 3 | 55 | 475,000 | 8,641 | resale |
| 04.09.2026 | ul. Inżynierska 38 | 1 | 2 | 41.1 | 630,000 | 15,328 | resale |
| 26.08.2026 | ul. Grabiszyńska 216 | 4 | 3 | 60.5 | 680,000 | 11,245 | resale |
| 26.08.2026 | ul. Podróżnicza 34-36 | 1 | 4 | 66.8 | 980,000 | 14,660 | resale |
| 25.08.2026 | al. gen. Józefa Hallera 202 | 3 | 1 | 49.1 | 849,000 | 17,302 | resale |
| 19.08.2026 | al. gen. Józefa Hallera 180 | 6 | 3 | 64.3 | 760,000 | 11,820 | resale |
| 12.08.2026 | al. Pracy 40 | 4 | 3 | 43.6 | 550,000 | 12,626 | resale |
| 12.08.2026 | al. Pracy 40 | 3 | 2 | 43 | 525,000 | 12,218 | resale |
| 11.08.2026 | al. gen. Józefa Hallera 152 | 1 | 4 | 58.6 | 635,000 | 10,840 | resale |
| 29.07.2026 | al. gen. Józefa Hallera 125 | 1 | 3 | 60.2 | 560,000 | 9,307 | resale |
| 22.07.2026 | ul. Inżynierska 41 | 4 | 2 | 48.9 | 710,000 | 14,522 | resale |
| 22.07.2026 | al. gen. Józefa Hallera 190 | 1 | 2 | 63.2 | 850,000 | 13,449 | resale |
| 15.07.2026 | ul. Grabiszyńska 192 | 2 | 2 | 43.5 | 765,000 | 17,570 | resale |
| 06.07.2026 | ul. Bzowa 67 | 1 | 3 | 36.4 | 430,000 | 11,800 | resale |
| 26.06.2026 | ul. Inżynierska 70 | 5 | 2 | 34.8 | 490,000 | 14,060 | resale |
| 17.06.2026 | al. gen. Józefa Hallera 152 | 1 | 4 | 59.4 | 555,000 | 9,345 | resale |
| 03.06.2026 | al. gen. Józefa Hallera 202 | 3 | 3 | 177.5 | 1,786,984 | 10,068 | new |
| 03.06.2026 | al. gen. Józefa Hallera 117 | 2 | 3 | 31 | 540,000 | 17,391 | resale |
| 01.06.2026 | al. gen. Józefa Hallera 202 | 5 | 1 | 49.1 | 839,000 | 17,088 | resale |
| 29.05.2026 | ul. Grabiszyńska 194 | 5 | 3 | 106.5 | 2,090,000 | 19,621 | resale |
| 28.05.2026 | al. gen. Józefa Hallera 111 | 1 | 3 | 54.8 | 589,000 | 10,756 | resale |
| 21.05.2026 | al. gen. Józefa Hallera 202 | 2 | 1 | 90.7 | 1,066,892 | 11,769 | new |
| 12.05.2026 | al. gen. Józefa Hallera 166 | 3 | 4 | 78.6 | 790,000 | 10,056 | resale |
| 30.04.2026 | ul. Grabiszyńska 204 | 7 | 2 | 63.5 | 420,000 | 6,618 | resale |
| 28.04.2026 | al. gen. Józefa Hallera 157a | 2 | 6 | 131.6 | 1,100,000 | 8,361 | resale |
| 24.04.2026 | al. Pracy 31 | 3 | 4 | 65.8 | 775,000 | 11,778 | resale |
| 17.04.2026 | ul. Inżynierska 84 | 5 | 3 | 34.7 | 499,000 | 14,380 | resale |
| 15.04.2026 | al. gen. Józefa Hallera 202 | 5 | 1 | 90.6 | 1,094,000 | 12,074 | new |
| 31.03.2026 | ul. Grabiszyńska 212 | 7 | 1 | 67.1 | 913,000 | 13,615 | resale |
| 26.03.2026 | al. gen. Józefa Hallera 184 | 4 | 3 | 61.8 | 735,000 | 11,893 | resale |
| 20.03.2026 | al. gen. Józefa Hallera 202 | 3 | 1 | 49.1 | 599,000 | 12,207 | new |
| 19.03.2026 | al. gen. Józefa Hallera 157a | 5 | 3 | 54.3 | 619,000 | 11,400 | resale |
| 18.03.2026 | ul. Inżynierska 38 | 1 | 2 | 41.1 | 408,000 | 9,927 | resale |
| 17.03.2026 | al. gen. Józefa Hallera 123 | 2 | 3 | 48.6 | 410,000 | 8,440 | resale |
| 06.03.2026 | ul. Inżynierska 37 | 5 | 2 | 37.7 | 660,000 | 17,516 | resale |
| 24.02.2026 | al. gen. Józefa Hallera 126 | 2 | 3 | 50.2 | 575,000 | 11,454 | resale |
| 23.02.2026 | ul. Maurycego Beniowskiego 22 | 2 | 3 | 71.4 | 1,275,000 | 17,857 | resale |
| 20.02.2026 | al. gen. Józefa Hallera 202 | 3 | 1 | 35.6 | 460,349 | 12,920 | new |
| 18.02.2026 | ul. Grabiszyńska 192 | 5 | 2 | 63.1 | 920,000 | 14,571 | resale |
| 16.02.2026 | ul. Grabiszyńska 190 | 4 | 2 | 42.1 | 700,000 | 16,623 | resale |
| 03.02.2026 | ul. Grabiszyńska 192 | 5 | 2 | 55.6 | 800,000 | 14,383 | resale |
| 02.02.2026 | al. gen. Józefa Hallera 202 | 4 | 1 | 35.7 | 536,039 | 15,032 | new |
| 29.01.2026 | al. gen. Józefa Hallera 202 | 5 | 1 | 49.1 | 650,000 | 13,238 | new |
| 26.01.2026 | al. gen. Józefa Hallera 115 | 2 | 3 | 58.8 | 640,000 | 10,881 | resale |
| 20.01.2026 | ul. Grabiszyńska 210 | 7 | 1 | 67.8 | 785,000 | 11,580 | resale |
| 15.01.2026 | ul. Grabiszyńska 212 | 2 | 1 | 36.8 | 635,000 | 17,255 | resale |
| 12.01.2026 | ul. Podróżnicza 18-20 | 1 | 4 | 91.4 | 1,020,000 | 11,159 | resale |
| 29.12.2025 | al. gen. Józefa Hallera 139 | 1 | 3 | 61.5 | 600,000 | 9,759 | resale |
| 29.12.2025 | ul. Pierwiosnkowa 15 | 1 | 3 | 71.4 | 696,000 | 9,744 | resale |
| 23.12.2025 | ul. Inżynierska 51 | 5 | 2 | 47 | 475,000 | 10,100 | resale |
| 19.12.2025 | al. gen. Józefa Hallera 190 | 5 | 3 | 65.9 | 940,000 | 14,264 | resale |
| 19.12.2025 | ul. Inżynierska 45 | 2 | 2 | 63.8 | 815,000 | 12,764 | resale |
| 04.12.2025 | al. gen. Józefa Hallera 117 | 2 | 3 | 31 | 300,000 | 9,662 | resale |
| 04.12.2025 | al. gen. Józefa Hallera 180 | 7 | 4 | 76.3 | 1,055,000 | 13,827 | resale |
| 04.12.2025 | al. gen. Józefa Hallera 190 | 4 | 3 | 76.5 | 990,000 | 12,941 | resale |
| 25.11.2025 | ul. Pionierska 21 | 2 | 3 | 87.6 | 1,150,000 | 13,128 | resale |
| 24.11.2025 | ul. Grabiszyńska 220 | 3 | 3 | 38 | 410,000 | 10,787 | resale |
| 17.11.2025 | al. gen. Józefa Hallera 142 | 1 | 4 | 61 | 572,000 | 9,377 | resale |
| 12.11.2025 | ul. Inżynierska 51 | 4 | 2 | 46.8 | 637,500 | 13,622 | resale |
| 12.11.2025 | ul. Inżynierska 51 | 4 | 2 | 48.3 | 637,500 | 13,193 | resale |
| 30.10.2025 | ul. Grabiszyńska 220 | 2 | 2 | 38 | 285,000 | 7,498 | resale |
| 14.10.2025 | ul. Grabiszyńska 200 | 6 | 2 | 37.1 | 650,000 | 17,515 | resale |
| 09.10.2025 | ul. Inżynierska 39 | 5 | 1 | 27.9 | 475,000 | 17,007 | resale |
| 08.10.2025 | al. gen. Józefa Hallera 190 | 2 | 3 | 67.4 | 800,000 | 11,869 | resale |
| 06.10.2025 | ul. Grabiszyńska 192 | 5 | 2 | 74.3 | 1,000,000 | 13,463 | resale |
| 12.09.2025 | ul. Inżynierska 48 | 1 | 3 | 49.4 | 490,000 | 9,919 | resale |
| 11.09.2025 | al. Pracy 34 | 4 | 2 | 23.1 | 365,000 | 15,801 | resale |
| 20.08.2025 | al. gen. Józefa Hallera 109 | 2 | 3 | 47.9 | 515,000 | 10,745 | resale |
| 05.08.2025 | ul. Grabiszyńska 214 | 3 | 2 | 47.9 | 720,000 | 15,031 | resale |
| 23.07.2025 | al. gen. Józefa Hallera 182 | 2 | 4 | 57.2 | 810,000 | 14,161 | resale |
| 17.07.2025 | ul. Pierwiosnkowa 8 | 1 | 4 | 68.2 | 800,000 | 11,730 | resale |
| 10.07.2025 | al. gen. Józefa Hallera 180 | 2 | 3 | 60.5 | 820,000 | 13,554 | resale |
| 09.07.2025 | al. gen. Józefa Hallera 111 | 1 | 3 | 53 | 675,000 | 12,729 | resale |
| 07.07.2025 | ul. Grabiszyńska 194 | 5 | 2 | 66.7 | 1,200,000 | 17,994 | new |
| 17.06.2025 | al. gen. Józefa Hallera 155 | 2 | 4 | 71.3 | 780,000 | 10,938 | resale |
| 12.06.2025 | ul. Inżynierska 49 | 6 | 2 | 66.2 | 900,000 | 13,601 | resale |
| 05.06.2025 | ul. Grabiszyńska 212 | 2 | 1 | 36.8 | 510,000 | 13,859 | resale |
| 03.06.2025 | ul. Grabiszyńska 212 | 2 | 1 | 36.8 | 510,000 | 13,859 | resale |
| 30.05.2025 | ul. Inżynierska 49 | 2 | 2 | 47.3 | 670,000 | 14,171 | resale |
| 28.05.2025 | ul. Inżynierska 70 | 2 | 2 | 26.8 | 345,000 | 12,873 | resale |
| 22.05.2025 | ul. Inżynierska 74 | 8 | 3 | 34.7 | 455,000 | 13,112 | resale |
| 20.05.2025 | al. gen. Józefa Hallera 155 | 3 | 3 | 52.3 | 535,000 | 10,220 | resale |
| 16.05.2025 | al. gen. Józefa Hallera 123 | 3 | 3 | 69.6 | 799,000 | 11,483 | resale |
| 14.05.2025 | ul. Grabiszyńska 192 | 2 | 3 | 59.2 | 960,000 | 16,222 | resale |
| 09.05.2025 | ul. Grabiszyńska 204 | 4 | 4 | 79.9 | 1,202,000 | 15,040 | resale |
| 08.05.2025 | al. gen. Józefa Hallera 155 | 4 | 3 | 30.1 | 410,000 | 13,621 | resale |
| 16.04.2025 | al. gen. Józefa Hallera 110 | 1 | 3 | 46.8 | 480,000 | 10,265 | resale |
| 04.04.2025 | ul. Inżynierska 43 | 3 | 2 | 46.4 | 660,000 | 14,218 | resale |
| 21.03.2025 | ul. Grabiszyńska 206 | 4 | 3 | 63.2 | 1,100,000 | 17,402 | resale |
| 18.03.2025 | ul. Inżynierska 47a | 5 | 2 | 51.5 | 625,000 | 12,136 | resale |
| 17.03.2025 | ul. Inżynierska 47a | 3 | 2 | 46.6 | 720,000 | 15,464 | resale |
| 25.02.2025 | ul. Maurycego Beniowskiego 23 | 1 | 4 | 79.6 | 700,000 | 8,794 | resale |
| 31.01.2025 | ul. Grabiszyńska 228 | 5 | 3 | 33.7 | 425,000 | 12,611 | resale |
| 16.01.2025 | al. Pracy 40 | 3 | 3 | 51.9 | 520,000 | 10,012 | resale |
| 10.01.2025 | ul. Grabiszyńska 194 | 2 | 3 | 59.1 | 900,000 | 15,226 | resale |
| 09.01.2025 | ul. Grabiszyńska 198 | 3 | 3 | 60 | 880,000 | 14,672 | resale |
| 08.01.2025 | ul. Inżynierska 47a | 6 | 2 | 46.4 | 780,000 | 16,807 | resale |
| 03.01.2025 | ul. Grabiszyńska 200 | 5 | 4 | 72.3 | 1,020,000 | 14,108 | resale |
| 12.12.2024 | al. gen. Józefa Hallera 153 | 4 | 3 | 50.5 | 550,000 | 10,889 | resale |
| 28.11.2024 | ul. Makowa 23 | 1 | 4 | 74 | 1,070,000 | 14,459 | resale |
| 07.11.2024 | ul. Grabiszyńska 230a | 5 | 3 | 47.5 | 643,000 | 13,525 | resale |
| 31.10.2024 | al. gen. Józefa Hallera 129 | 3 | 2 | 37.3 | 420,000 | 11,263 | resale |
| 30.10.2024 | al. gen. Józefa Hallera 188 | 2 | 2 | 43.7 | 635,000 | 14,531 | resale |
| 30.10.2024 | ul. Inżynierska 39 | 6 | 1 | 28 | 479,700 | 17,144 | resale |
| 17.10.2024 | ul. Inżynierska 69 | 2 | 2 | 26.7 | 368,500 | 13,801 | new |
| 15.10.2024 | al. Pracy 30 | 2 | 3 | 41.4 | 408,000 | 9,848 | resale |
| 04.10.2024 | ul. Inżynierska 70 | 5 | 1 | 27 | 390,000 | 14,461 | resale |
| 27.09.2024 | ul. Inżynierska 45 | 3 | 2 | 46.4 | 720,000 | 15,507 | resale |
| 04.09.2024 | ul. Inżynierska 47a | 4 | 1 | 37.2 | 583,000 | 15,672 | resale |
| 23.08.2024 | ul. Inżynierska 43 | 5 | 2 | 48.4 | 700,000 | 14,469 | resale |
| 21.08.2024 | ul. Inżynierska 80 | 6 | 4 | 46.7 | 645,000 | 13,812 | resale |
| 29.07.2024 | ul. Inżynierska 43 | 5 | 2 | 48.7 | 710,000 | 14,570 | resale |
| 23.07.2024 | al. Pracy 15 | 4 | 3 | 37.6 | 380,000 | 10,106 | resale |
| 16.07.2024 | ul. Grabiszyńska 222 | 1 | 3 | 52.7 | 585,000 | 11,092 | resale |
| 28.06.2024 | ul. Inżynierska 84 | 3 | 3 | 34.7 | 345,000 | 9,942 | resale |
| 21.06.2024 | al. gen. Józefa Hallera 188 | 7 | 3 | 75.3 | 900,000 | 11,952 | resale |
| 14.06.2024 | ul. Grabiszyńska 220 | 1 | 2 | 23.8 | 345,000 | 14,514 | resale |
| 13.06.2024 | al. Pracy 30 | 2 | 3 | 38.9 | 525,000 | 13,482 | resale |
| 11.06.2024 | al. gen. Józefa Hallera 184 | 3 | 3 | 62.1 | 780,000 | 12,560 | resale |
| 29.05.2024 | al. gen. Józefa Hallera 172 | 1 | 4 | 67.7 | 870,000 | 12,847 | resale |
| 13.05.2024 | al. Pracy 37 | 4 | 3 | 57.6 | 550,000 | 9,545 | resale |
| 09.05.2024 | al. gen. Józefa Hallera 143 | 3 | 4 | 63.2 | 635,000 | 10,055 | resale |
| 29.04.2024 | al. gen. Józefa Hallera 109 | 1 | 3 | 48.2 | 670,000 | 13,895 | resale |
| 25.04.2024 | ul. Grabiszyńska 214 | 2 | 2 | 52.8 | 750,000 | 14,205 | resale |
| 25.04.2024 | al. Pracy 30 | 3 | 1 | 20.9 | 338,000 | 16,141 | resale |
| 23.04.2024 | ul. Księgowa 12 | 2 | 4 | 51 | 580,000 | 11,373 | resale |
| 18.04.2024 | ul. Inżynierska 43 | 2 | 2 | 48.8 | 685,500 | 14,033 | resale |
| 12.04.2024 | ul. Inżynierska 50 | 5 | 2 | 39.4 | 580,000 | 14,721 | resale |
| 10.04.2024 | ul. Grabiszyńska 230b | 1 | 4 | 53.9 | 692,500 | 12,848 | resale |
| 10.04.2024 | ul. Pionierska 7 | 3 | 2 | 35.3 | 500,000 | 14,164 | resale |
| 03.04.2024 | ul. Inżynierska 68 | 4 | 4 | 63.6 | 770,000 | 12,107 | resale |
| 27.03.2024 | ul. Podróżnicza 31 | 1 | 3 | 34 | 490,000 | 14,395 | resale |
| 20.03.2024 | ul. Pionierska 19 | 1 | 3 | 62.8 | 500,000 | 7,967 | resale |
| 20.03.2024 | ul. Ignacego Domeyki 13 | — | 5 | 95.7 | 960,000 | 10,031 | resale |
| 19.03.2024 | ul. Grabiszyńska 230a | 5 | 3 | 47.5 | 475,000 | 9,992 | resale |
| 04.03.2024 | ul. Wojciecha Męcińskiego 2-4 | 2 | 5 | 91.5 | 885,000 | 9,672 | resale |
| 29.02.2024 | ul. Odkrywców 20 | 1 | 4 | 74.4 | 1,100,000 | 14,785 | resale |
| 28.02.2024 | al. gen. Józefa Hallera 190 | 1 | 3 | 63.3 | 830,000 | 13,112 | resale |
| 22.02.2024 | ul. Odkrywców 19 | 1 | 4 | 55.1 | 680,000 | 12,343 | resale |
| 15.02.2024 | ul. Inżynierska 33 | 3 | 3 | 52.7 | 865,000 | 16,404 | resale |
| 13.02.2024 | ul. Inżynierska 80 | 6 | 4 | 46.7 | 465,000 | 9,957 | resale |
| 05.02.2024 | al. gen. Józefa Hallera 115 | 3 | 3 | 67.9 | 590,000 | 8,689 | resale |
| 02.02.2024 | ul. Pionierska 21 | 1 | 4 | 76.3 | 1,270,000 | 16,645 | resale |
| 31.01.2024 | al. gen. Józefa Hallera 182 | 4 | 3 | 55.3 | 680,000 | 12,297 | resale |
| 26.01.2024 | al. Pracy 41 | 3 | 2 | 45.2 | 412,000 | 9,113 | resale |
| 25.01.2024 | al. gen. Józefa Hallera 148 | 2 | 4 | 60.8 | 350,000 | 5,760 | resale |
| 19.01.2024 | al. gen. Józefa Hallera 188 | 3 | 3 | 76.2 | 850,000 | 11,155 | resale |
| 16.01.2024 | ul. Grabiszyńska 230b | 3 | 3 | 47.5 | 520,000 | 10,938 | resale |
| 11.01.2024 | al. gen. Józefa Hallera 115 | 2 | 3 | 67.5 | 570,000 | 8,447 | resale |
| 08.01.2024 | al. gen. Józefa Hallera 156 | 3 | 3 | 38.8 | 450,000 | 11,592 | resale |
| 28.12.2023 | al. gen. Józefa Hallera 125 | 2 | 3 | 61.7 | 545,000 | 8,833 | resale |
| 20.12.2023 | al. gen. Józefa Hallera 115 | 4 | 4 | 65.3 | 626,000 | 9,584 | resale |
| 07.12.2023 | ul. Grabiszyńska 196 | 1 | 3 | 52.1 | 725,000 | 13,913 | resale |
| 30.11.2023 | ul. Żeglarska 8 | 2 | 6 | 98.6 | 990,000 | 10,041 | new |
| 29.11.2023 | ul. Grabiszyńska 190 | 7 | 2 | 42.3 | 630,000 | 14,901 | resale |
| 20.11.2023 | ul. Grabiszyńska 214 | 7 | 1 | 67.9 | 700,000 | 10,312 | new |
| 07.11.2023 | ul. Żeglarska 12 | 2 | 6 | 97.5 | 800,000 | 8,205 | resale |
| 20.10.2023 | al. gen. Józefa Hallera 186 | 2 | 3 | 62.1 | 750,000 | 12,077 | resale |
| 20.10.2023 | al. gen. Józefa Hallera 156 | 4 | 3 | 39.3 | 440,000 | 11,182 | resale |
| 18.10.2023 | al. gen. Józefa Hallera 190 | 4 | 3 | 76.5 | 885,000 | 11,569 | resale |
| 16.10.2023 | al. Pracy 34 | 2 | 2 | 33.8 | 410,000 | 12,123 | resale |
| 12.10.2023 | ul. Inżynierska 66 | 11 | 2 | 37.4 | 400,000 | 10,701 | resale |
| 28.09.2023 | ul. Inżynierska 43 | 6 | 2 | 48.8 | 700,000 | 14,347 | resale |
| 28.09.2023 | ul. Grabiszyńska 230b | 1 | 4 | 53.9 | 390,000 | 7,236 | resale |
| 22.09.2023 | ul. Inżynierska 49 | 3 | 2 | 46 | 650,000 | 14,140 | new |
| 13.09.2023 | al. gen. Józefa Hallera 121 | 2 | 4 | 81.9 | 568,100 | 6,935 | new |
| 12.09.2023 | ul. Inżynierska 13 | 3 | 1 | 20 | 275,000 | 13,750 | resale |
| 11.09.2023 | al. gen. Józefa Hallera 112 | 2 | 3 | 55.9 | 482,800 | 8,632 | new |
| 25.08.2023 | ul. Żeglarska 8 | 3 | 4 | 45.5 | 450,000 | 9,901 | resale |
| 09.08.2023 | ul. Inżynierska 50 | 5 | 2 | 39.4 | 334,000 | 8,477 | resale |
| 08.08.2023 | al. gen. Józefa Hallera 145 | 4 | 3 | 53.6 | 560,000 | 10,446 | resale |
| 31.07.2023 | al. gen. Józefa Hallera 182 | 3 | 3 | 90 | 1,210,000 | 13,444 | resale |
| 18.07.2023 | ul. Inżynierska 45 | 5 | 2 | 64.2 | 840,000 | 13,074 | resale |
| 11.07.2023 | ul. Makowa 23 | 1 | 4 | 74 | 845,000 | 11,419 | resale |
| 10.07.2023 | al. gen. Józefa Hallera 123 | 2 | 3 | 69.3 | 600,000 | 8,663 | resale |
| 26.05.2023 | ul. Odkrywców 10 | 1 | 3 | 72.8 | 900,000 | 12,363 | resale |
| 08.05.2023 | al. gen. Józefa Hallera 190 | 1 | 3 | 63.6 | 680,000 | 10,692 | resale |
| 14.04.2023 | ul. Inżynierska 47a | 1 | 3 | 81.4 | 633,450 | 7,782 | resale |
| 06.04.2023 | al. gen. Józefa Hallera 153 | 4 | 3 | 50.5 | 430,000 | 8,513 | resale |
| 31.03.2023 | al. gen. Józefa Hallera 112 | 1 | 2 | 36.1 | 380,000 | 10,535 | resale |
| 16.03.2023 | ul. Odkrywców 10 | 2 | 5 | 63.6 | 910,000 | 14,308 | resale |
| 23.02.2023 | ul. Inżynierska 78 | 11 | 2 | 26.8 | 285,000 | 10,634 | resale |
| 31.01.2023 | ul. Inżynierska 78 | 11 | 2 | 26.8 | 245,000 | 9,142 | resale |
| 24.01.2023 | ul. Odkrywców 15 | 1 | 4 | 69.5 | 530,000 | 7,626 | resale |
| 03.01.2023 | al. gen. Józefa Hallera 110 | 4 | 3 | 53.9 | 250,000 | 4,636 | resale |
| 20.12.2022 | al. gen. Józefa Hallera 153a | 1 | 4 | 60.8 | 579,000 | 9,523 | resale |
| 01.12.2022 | ul. Grabiszyńska 228 | 1 | 3 | 33.7 | 355,000 | 10,534 | resale |