ulica Postępu 10 sale prices and the building's surroundings
≈ 5,445 zł per month with a 20% down payment and a 30-year mortgage
The building has only 9 sales in 24 months — showing the nearest area with at least 20 sales.
Location
Pros
- separate cycle track 1 min away
- grocery shops within 500 m: 30
- primary school 9 min away, exam 88%
Things to watch out for
- 38 min to the centre by public transport
- noise from roads 70+ dB — above the limit for housing (68 dB)
Risks
Noise from roads: 70+ dB over 24 h (LDWN) — above the Polish limit for blocks of flats, 68 dB
- outside ISOK flood zones
- NO₂ 15.6 µg/m³ per year — below the 2030 EU limit (20)
- PM2.5 dust 15 µg/m³ a year — within the Polish limit of 20, but above the EU limit from 2030 (10)
- nearest plant with a risk of a major accident (SEVESO) — 1,435 m away: warehouse, terminal, logistics
- no plants of the PRTR pollutant register within 1 km
- Road accidents with injuries nearby in 3 years: 4
Sources: the city's strategic noise map, ISOK flood maps (Wody Polskie), EEA annual air quality model (1 km), road accident data, SEVESO and PRTR registers (GIOŚ). The maps are a general guide, not a verdict on an individual building.
What may be built nearby
- A local zoning plan (MPZP) is in force №XXIX/625/2011 «Służewiec Przemysłowy w rej. ul. Cybernetyki cz. I» — what can be built nearby is already set.
- Allowed by the plan within 150 m: blocks of flats (0 m); streets and roads (23 m); services: shops, offices, venues (45 m).
- Building permits within 500 m in the last 3 years (GUNB): 4 — housing 2, services and offices 2.
- block of flats, new building · 166 m · permit 07.11.2024zmiana decyzji 207/B/2023 z 13.10.2023 zatwierdzającej projekt zagospodarowania terenu oraz projekt architektoniczno - budowlanegy i udziela
- block of flats, new building · 275 m · permit 19.03.2024wniosek o pozwolenie na budowe budynku mieszkalnego z uslugami, garazem podziemnym, infrastrukturą wypoczynkową i techniczną na dz 3/14 i 3/
- shop, restaurant or services, new building · 390 m · permit 25.11.2025zmiana decyzji nr 41/B/2023 z dn. 28.02.2023 udzielającej pozwolenia na rozbiórkę budynku istniejącego biurowo-magazynowego oraz zatwierdz
- hotel or dormitory, new building · 390 m · permit 20.05.2025zmiana decyzji 41/B/2023 z 28.02.2023 udzielającej pozwolenia na rozbiórkę budynku istniejącego biurowo-magazynowego oraz zatwierdzającej p
- block of flats, new building · 166 m · permit 07.11.2024
All land uses within 150 m
- blocks of flats · 0 m
- streets and roads · 23 m
- services: shops, offices, venues · 45 m
- parks, allotments, cemeteries · 97 m
Why the price is what it is here
What affects the price here
How we calculate thisDistrict Mokotów: similar flats here are on average pricier by 13.7% compared with the city average.
Effect on the price per m² compared with similar flats in the same district, based on 2022–2026 sales. These are statistical links, not a guarantee for a specific flat.
Developer prices nearby
| Development | Distance | Flats | Median zł/m² | Change |
|---|---|---|---|---|
| Cybernetyki 7/7B Flora Development 23 Sp. z o. o. | 166 m | 120 | 21,087 | -6% |
| Bokserska 71 Dom Development S.A. | 593 m | 117 | 17,650 | — |
| Bokserska 71 Dom Development S.A. | 593 m | 58 | 17,000 | +2.4% |
| Bokserska 71 Dom Development S.A. | 593 m | 3 | 16,450 | +0.1% |
| Bokserska Spravia – Bokserska 2 spółka z ograniczoną odpowiedzialnością | 637 m | 1 | 16,890 | +0.4% |
| Bokserska 54B Moko Botanika Property Spółka z ograniczoną odpowiedzialnością | 714 m | 8 | 20,544 | -3.1% |
| Bokserska 54 Moko Botanika Property Spółka z ograniczoną odpowiedzialnością | 714 m | 9 | 21,393 | -1.4% |
| Bokserska 54A Moko Botanika Property Spółka z ograniczoną odpowiedzialnością | 714 m | 7 | 20,709 | -3.6% |
Asking prices from daily price lists (dane.gov.pl), 1.5 km radius.
What to check yourself before buying
- Land and mortgage register (KW) — owner, mortgages, encumbrances: free of charge at ekw.ms.gov.pl.
- Type of ownership — full ownership or cooperative right; share of the land in perpetual usufruct (annual fee).
- Fees — fees to the owners' association, repair fund, any arrears of the previous owner.
- Building — year built, condition of the roof and façade, planned repairs (owners' association minutes).
- Flat — which way the windows face, ventilation, damp, window frames, heating.
- For a new build — information prospectus, building permit, escrow bank account.
Location in detail: stops, schools, green space, sun
Location card
from the addressTransport
38 min to the centre at 7:45 on a weekday (1 transfer(s))
- Rondo Żabczyńskiego · 104 m · 16 departures 7–9 am317
- Komputerowa · 196 m · 15 departures 7–9 am317
- Cybernetyki · 323 m · 67 departures 7–9 am136138165317N34
- Obrzeżna · 409 m · 20 departures 7–9 am165
- Postępu · 439 m · 258 departures 7–9 am171831189401402504
Time to other districts at 7:45: 1 of 18 within 30 min
| Mokotów — your district | 33 min |
| Włochy | 30 min |
| Ochota | 31 min |
| Ursynów | 37 min |
| Ursus | 42 min |
| Wilanów | 44 min |
| Praga-Południe | 46 min |
| Śródmieście | 46 min |
| Wola | 49 min |
| Praga-Północ | 53 min |
| Żoliborz | 54 min |
| Rembertów | 57 min |
| Bemowo | 59 min |
| Bielany | 70 min |
| Wawer | 70 min |
| Targówek | 71 min |
| Wesoła | 78 min |
| Białołęka | 97 min |
By public transport and on foot to where most of the district's addresses are; a weekday, by the timetable.
Schools and kindergartens
| SZKOŁA PODSTAWOWA Z ODDZIAŁAMI DWUJĘZYCZNYMI NR 20 IM. JANA private | 495 m | 87.7% |
|---|---|---|
| SZKOŁA PODSTAWOWA IM KOMISJI EDUKACJI NARODOWEJ | 720 m | 61.7% |
| NIEPUBLICZNA SZKOŁA PODSTAWOWA NEW HORIZON INTERNATIONAL SCHprivate | 913 m | — |
| SZKOŁA PODSTAWOWA NR 271 IM. 11 LISTOPADA | 939 m | 70.1% |
The last column is the average 8th-grade exam result (Polish, maths, English), CKE. The city does not publish the school catchment area for each address — check at edukacja.um.warszawa.pl.
Kindergartens within 1 km: 15 (public: 4) · nearest: 3 min walk
Nearby
| Grocery shops | 30 within 500 m | nearest: 1 min walk |
|---|---|---|
| Pharmacies | 2 within 500 m | nearest: 5 min walk |
| Doctors, clinics | 19 within 1 km | nearest: 4 min walk |
| Playgrounds | 14 within 500 m | nearest: 1 min walk |
| Cafés and restaurants | 35 within 500 m | nearest: 2 min walk |
| City bike hire | 0 within 500 m | nearest: 10 min walk |
| Gyms | 7 within 1 km | nearest: 5 min walk |
| Park & Ride | 0 within 2 km | nearest: 35 min walk |
| EV chargers | 3 within 1 km | nearest: 14 min walk |
Green space, noise, air
14% of the area within 500 m — parks, forests, lawns
Nearest green area: right nearby · park «Pigalak» — 801 m
| Noise: roads | 70+ dB · over the limit |
|---|---|
| Noise: trams | quiet (below 55 dB) |
| Noise: railway | quiet (below 55 dB) |
| Noise: airport | quiet (below 55 dB) |
| Noise: industry | quiet (below 55 dB) |
Strategic noise map, LDWN (24 h). Limit for blocks of flats: 68 dB from roads, trams and railways (70 dB in a big city's centre zone), 60 dB from aircraft, 55 dB from industry. WHO recommends up to 53 dB from roads.
Risks and restrictions
| Flood once in 10 years | no |
|---|---|
| Flood once in 100 years | no |
| Flood once in 500 years | no |
| Flood if a levee breaks | no |
| Road accidents in 3 years, 300 m | 135 · with injuries: 4 |
| Paid parking | no |
Flood zones — ISOK (Wody Polskie); 1 cell ≈ 7 m. Being in the Q1% zone affects insurance and mortgages.
What may be built nearby
| Local zoning plan (MPZP) | №XXIX/625/2011 Służewiec Przemysłowy w rej. ul. Cybernetyki cz. I · resolution |
|---|---|
| Land use within 150 m | MW(U) zabudowa wielorodzinna z usługami KDZ droga zbiorcza · 23 m U/U-A tereny usług · 45 m KDG droga główna · 52 m ZP zieleń urządzona · 97 m U-O/US/U-Zz usługi oświaty · 101 m |
MW — blocks of flats, MN — houses, U — services, ZP — parks, KD — roads.
Sun
Sources: GTFS, OpenStreetMap, city GIS, ISOK, GIOŚ, RSPO, CKE, GUGiK. Source status
Sales, charts and filters (257 sales)
Area: Radius 300 m · 257 sales with filters applied
Median price per m² by quarter
The band is the middle 50% of sales in the area. Quarters with fewer than 3 sales in the area are skipped. The last quarter is incomplete.
Distribution of price per m²
area median 18,312 zł/m² city median 16,212 zł/m² · k zł/m², 257 sales
Resales
9 sales — flats sold twice. Median price change +9.8% over a median of 17.6 mo. between deeds.
The first price mostly comes from the developer's handover deed and was agreed 1–3 years earlier, so the difference shows growth over a longer period.
| Address | Area | Bought | Price | Sold | Price | Difference |
|---|---|---|---|---|---|---|
| ulica Komputerowa 8 | 61.6 | 25.08.2023 | 960,000 | 24.02.2026 | 960,000 | 0% |
| ulica Cybernetyki 7E | 79.9 | 06.09.2023 | 1,130,000 | 07.01.2026 | 1,600,000 | +41.6% |
| ulica Cybernetyki 7G | 55.7 | 19.07.2024 | 1,148,000 | 05.01.2026 | 1,040,000 | -9.4% |
| ulica Postępu 12B | 73.5 | 15.06.2023 | 1,275,000 | 01.08.2025 | 1,400,000 | +9.8% |
| ulica Cybernetyki 7H | 36.7 | 17.03.2023 | 659,000 | 31.10.2024 | 670,000 | +1.7% |
| ulica Cybernetyki 7F | 55.6 | 15.04.2024 | 979,900 | 16.07.2024 | 1,139,000 | +16.2% |
| ulica Komputerowa 8 | 41.3 | 30.03.2023 | 539,000 | 15.09.2023 | 820,000 | +52.1% |
| ulica Komputerowa 8 | 61.6 | 01.06.2023 | 680,000 | 25.08.2023 | 960,000 | +41.2% |
| ulica Postępu 12B | 59.5 | 27.03.2023 | 668,594 | 23.06.2023 | 668,594 | 0% |
Sales (257)
CSV| Date | Address | Floor | Rooms | Area | Price | zł/m² | Market |
|---|---|---|---|---|---|---|---|
| 19.05.2026 | ulica Cybernetyki 4A | 7 | 3 | 73 | 1,330,000 | 18,219 | resale |
| 08.05.2026 | ulica Cybernetyki 7G | 5 | 2 | 55.7 | 1,150,000 | 20,650 | resale |
| 24.04.2026 | ulica Wynalazek 2 | 4 | 2 | 63.1 | 1,180,000 | 18,689 | resale |
| 23.04.2026 | ulica Cybernetyki 6A | 4 | 2 | 37.8 | 800,000 | 21,181 | resale |
| 21.04.2026 | ulica Komputerowa 8 | 7 | 3 | 58.7 | 1,113,000 | 18,971 | resale |
| 17.04.2026 | ulica Komputerowa 8 | 3 | 4 | 85 | 1,600,000 | 18,824 | resale |
| 16.04.2026 | ulica Cybernetyki 7C | 5 | 3 | 77.8 | 1,234,000 | 15,853 | resale |
| 14.04.2026 | ulica Cybernetyki 6A | 7 | 3 | 56.5 | 1,080,000 | 19,132 | resale |
| 10.04.2026 | ulica Postępu 10 | 3 | 2 | 60.6 | 998,000 | 16,458 | resale |
| 31.03.2026 | ulica Cybernetyki 2 | 2 | 4 | 83.8 | 1,650,000 | 19,701 | resale |
| 31.03.2026 | ulica Cybernetyki 4A | 5 | 2 | 29.9 | 635,000 | 21,252 | resale |
| 19.03.2026 | ulica Cybernetyki 6B | 7 | 2 | 41.2 | 888,000 | 21,543 | resale |
| 18.03.2026 | ulica Komputerowa 9 | 6 | 3 | 58.7 | 1,020,000 | 17,382 | resale |
| 13.03.2026 | ulica Cybernetyki 13 | 2 | 2 | 67.6 | 1,225,000 | 18,121 | resale |
| 12.03.2026 | ulica Komputerowa 8 | 3 | 2 | 33.1 | 715,000 | 21,588 | resale |
| 11.03.2026 | ulica Cybernetyki 7H | 4 | 4 | 77.2 | 1,380,000 | 17,864 | resale |
| 25.02.2026 | ulica Cybernetyki 4 | 6 | 3 | 69.1 | 1,350,000 | 19,528 | resale |
| 24.02.2026 | ulica Komputerowa 8 | 8 | 3 | 61.6 | 960,000 | 15,584 | resale |
| 16.02.2026 | ulica Wynalazek 2 | 7 | 2 | 52.8 | 950,000 | 17,975 | resale |
| 16.02.2026 | ulica Postępu 12C | 6 | 3 | 75.8 | 1,850,000 | 24,419 | resale |
| 13.02.2026 | ulica Cybernetyki 7E | 4 | 3 | 80.5 | 1,564,800 | 19,439 | resale |
| 12.02.2026 | ulica Cybernetyki 6B | 4 | 4 | 79.6 | 1,535,000 | 19,277 | resale |
| 05.02.2026 | ulica Cybernetyki 7E | 1 | 2 | 44.6 | 815,000 | 18,274 | resale |
| 02.02.2026 | ulica Cybernetyki 6B | 6 | 2 | 43.6 | 950,000 | 21,789 | resale |
| 27.01.2026 | ulica Cybernetyki 7C | 6 | 2 | 79.7 | 1,420,000 | 17,810 | resale |
| 16.01.2026 | ulica Postępu 12E | 7 | 2 | 51.5 | 1,110,000 | 21,545 | resale |
| 12.01.2026 | ulica Cybernetyki 4A | 2 | 2 | 66.3 | 1,180,000 | 17,793 | resale |
| 09.01.2026 | ulica Wynalazek 2 | 6 | 2 | 43.1 | 825,000 | 19,137 | resale |
| 09.01.2026 | ulica Cybernetyki 6B | 6 | 2 | 50.1 | 1,070,000 | 21,370 | resale |
| 08.01.2026 | ulica Cybernetyki 7G | 3 | 2 | 51.1 | 950,000 | 18,584 | resale |
| 07.01.2026 | ulica Cybernetyki 6B | 2 | 2 | 44 | 980,000 | 22,293 | resale |
| 07.01.2026 | ulica Cybernetyki 7E | 3 | 4 | 79.9 | 1,600,000 | 20,025 | resale |
| 05.01.2026 | ulica Cybernetyki 7G | 2 | 2 | 55.7 | 1,040,000 | 18,665 | resale |
| 23.12.2025 | ulica Cybernetyki 7F | 7 | 4 | 100.3 | 1,780,000 | 17,747 | resale |
| 22.12.2025 | ulica Komputerowa 8 | 7 | 2 | 41.4 | 790,000 | 19,096 | resale |
| 19.12.2025 | ulica Komputerowa 8 | 3 | 4 | 90.4 | 1,630,000 | 18,035 | resale |
| 19.12.2025 | ulica Cybernetyki 4A | 2 | 4 | 102.2 | 1,720,000 | 16,830 | resale |
| 17.12.2025 | ulica Cybernetyki 3C | 10 | 3 | 59.9 | 1,220,000 | 20,357 | resale |
| 09.12.2025 | ulica Cybernetyki 7G | 1 | 1 | 32.3 | 650,000 | 20,130 | resale |
| 04.12.2025 | ulica Cybernetyki 3C | 9 | 2 | 37.6 | 750,000 | 19,963 | resale |
| 25.11.2025 | ulica Cybernetyki 7G | 3 | 2 | 36.2 | 720,000 | 19,868 | resale |
| 12.11.2025 | ulica Postępu 10 | 10 | 2 | 45.2 | 920,000 | 20,345 | resale |
| 12.11.2025 | ulica Cybernetyki 7C | 2 | 3 | 77.8 | 1,330,000 | 17,089 | resale |
| 07.11.2025 | ulica Wynalazek 2 | 5 | 2 | 31.1 | 400,000 | 12,878 | resale |
| 30.10.2025 | ulica Postępu 10 | 6 | 4 | 82.6 | 1,775,000 | 21,494 | resale |
| 01.10.2025 | ulica Cybernetyki 7F | 1 | 3 | 68.5 | 1,264,500 | 18,460 | resale |
| 24.09.2025 | ulica Cybernetyki 7E | 5 | 4 | 80.8 | 1,460,000 | 18,069 | resale |
| 16.09.2025 | ulica Cybernetyki 4A | 8 | 3 | 71.7 | 1,300,000 | 18,129 | resale |
| 08.09.2025 | ulica Postępu 10 | 3 | 3 | 81 | 1,360,000 | 16,786 | resale |
| 06.09.2025 | ulica Komputerowa 8 | 8 | 2 | 42.4 | 865,000 | 20,406 | resale |
| 05.09.2025 | ulica Cybernetyki 7D | 6 | 2 | 37.1 | 732,000 | 19,715 | resale |
| 05.09.2025 | ulica Cybernetyki 7H | 3 | 2 | 74.7 | 1,240,000 | 16,593 | resale |
| 04.09.2025 | ulica Postępu 12B | 6 | 3 | 59.4 | 1,320,000 | 22,215 | resale |
| 04.09.2025 | ulica Cybernetyki 4A | 2 | 2 | 32 | 670,000 | 20,964 | resale |
| 01.09.2025 | ulica Komputerowa 8 | 2 | 3 | 59.9 | 1,100,000 | 18,352 | resale |
| 29.08.2025 | ulica Postępu 10 | 2 | 4 | 92.8 | 1,650,000 | 17,778 | resale |
| 25.08.2025 | ulica Cybernetyki 2 | 4 | 2 | 36.7 | 705,000 | 19,226 | resale |
| 22.08.2025 | ulica Cybernetyki 7H | 6 | 2 | 48.1 | 976,000 | 20,287 | resale |
| 22.08.2025 | ulica Cybernetyki 7H | 1 | 2 | 54.1 | 920,000 | 16,999 | resale |
| 18.08.2025 | ulica Postępu 10 | 4 | 2 | 50.2 | 990,000 | 19,733 | resale |
| 12.08.2025 | ulica Cybernetyki 7C | 6 | 3 | 77.9 | 1,470,000 | 18,870 | resale |
| 06.08.2025 | ulica Komputerowa 9 | 4 | 2 | 52.9 | 1,050,000 | 19,856 | resale |
| 05.08.2025 | ulica Cybernetyki 4A | 6 | 2 | 41.3 | 800,000 | 19,375 | resale |
| 01.08.2025 | ulica Postępu 12B | 4 | 3 | 73.5 | 1,400,000 | 19,053 | resale |
| 25.07.2025 | ulica Cybernetyki 6 | 3 | 3 | 61.4 | 1,130,000 | 18,392 | resale |
| 15.07.2025 | ulica Wynalazek 2 | 9 | 2 | 47.8 | 970,000 | 20,272 | resale |
| 14.07.2025 | ulica Cybernetyki 6 | 7 | 3 | 61.4 | 1,130,000 | 18,392 | resale |
| 11.07.2025 | ulica Cybernetyki 4 | 5 | 4 | 73 | 1,355,000 | 18,564 | resale |
| 09.07.2025 | ulica Cybernetyki 7F | 3 | 4 | 97.1 | 1,930,000 | 19,876 | resale |
| 01.07.2025 | ulica Cybernetyki 7C | 4 | 3 | 80 | 1,510,000 | 18,880 | resale |
| 30.06.2025 | ulica Komputerowa 8 | 2 | 2 | 41.5 | 765,000 | 18,429 | resale |
| 18.06.2025 | ulica Cybernetyki 6 | 6 | 3 | 65 | 1,400,000 | 21,532 | resale |
| 09.06.2025 | ulica Cybernetyki 2 | 3 | 3 | 69.2 | 1,350,000 | 19,509 | resale |
| 09.06.2025 | ulica Cybernetyki 2 | 4 | 3 | 69.2 | 1,350,000 | 19,503 | resale |
| 05.06.2025 | ulica Komputerowa 7 | 8 | 3 | 64.4 | 1,125,000 | 17,458 | resale |
| 03.06.2025 | ulica Cybernetyki 7F | 4 | 2 | 44.6 | 1,001,000 | 22,444 | resale |
| 30.05.2025 | ulica Cybernetyki 7F | 3 | 2 | 44.6 | 919,900 | 20,626 | resale |
| 23.05.2025 | ulica Cybernetyki 4A | 7 | 4 | 75.6 | 1,500,000 | 19,844 | resale |
| 16.05.2025 | ulica Cybernetyki 7H | 5 | 4 | 77.7 | 1,505,000 | 19,372 | resale |
| 12.05.2025 | ulica Komputerowa 8 | 4 | 3 | 53.4 | 1,050,000 | 19,674 | resale |
| 23.04.2025 | ulica Cybernetyki 2 | 8 | 2 | 53.3 | 1,312,000 | 24,602 | resale |
| 17.04.2025 | ulica Cybernetyki 7G | 7 | 2 | 55.8 | 900,000 | 16,135 | resale |
| 16.04.2025 | ulica Cybernetyki 13 | 3 | 3 | 92.5 | 1,450,000 | 15,677 | resale |
| 14.04.2025 | ulica Wynalazek 2 | 5 | 2 | 49.5 | 900,000 | 18,193 | resale |
| 03.04.2025 | ulica Cybernetyki 15 | 2 | 2 | 42 | 770,000 | 18,312 | resale |
| 27.03.2025 | ulica Postępu 10 | 3 | 4 | 85 | 1,500,000 | 17,639 | resale |
| 26.03.2025 | ulica Wynalazek 2 | 4 | 4 | 63.4 | 1,155,000 | 18,209 | resale |
| 26.03.2025 | ulica Obrzeżna 5E | 6 | 2 | 35.6 | 740,000 | 20,781 | resale |
| 26.03.2025 | ulica Postępu 12B | 2 | 2 | 41.4 | 950,000 | 22,958 | resale |
| 19.03.2025 | ulica Cybernetyki 4A | 7 | 3 | 63.1 | 1,100,000 | 17,438 | resale |
| 07.03.2025 | ulica Cybernetyki 7H | 6 | 2 | 36.8 | 730,000 | 19,842 | resale |
| 03.03.2025 | ulica Cybernetyki 7F | 5 | 3 | 62.3 | 1,130,000 | 18,138 | resale |
| 03.03.2025 | ulica Cybernetyki 13 | 4 | 2 | 52.8 | 845,000 | 15,998 | resale |
| 25.02.2025 | ulica Cybernetyki 7C | 7 | 3 | 76.1 | 1,379,900 | 18,130 | resale |
| 21.02.2025 | ulica Postępu 10 | 11 | 3 | 69.7 | 1,300,000 | 18,665 | resale |
| 12.02.2025 | ulica Postępu 10 | 10 | 3 | 60.7 | 1,170,000 | 19,281 | resale |
| 05.02.2025 | ulica Komputerowa 8 | 4 | 4 | 67.1 | 1,255,000 | 18,692 | resale |
| 31.01.2025 | ulica Cybernetyki 7F | 5 | 2 | 37.9 | 750,000 | 19,789 | resale |
| 27.01.2025 | ulica Cybernetyki 4 | 7 | 2 | 46.5 | 900,000 | 19,338 | resale |
| 24.01.2025 | ulica Cybernetyki 3C | 6 | 2 | 44.8 | 800,000 | 17,873 | resale |
| 15.01.2025 | ulica Cybernetyki 4A | 4 | 1 | 32 | 770,000 | 24,055 | resale |
| 14.01.2025 | ulica Komputerowa 8 | 6 | 3 | 64.4 | 1,180,000 | 18,329 | resale |
| 07.01.2025 | ulica Cybernetyki 4A | 2 | 4 | 71.9 | 1,200,000 | 16,692 | resale |
| 12.12.2024 | ulica Postępu 12B | 8 | 3 | 77.3 | 1,854,240 | 24,000 | resale |
| 04.12.2024 | ulica Cybernetyki 4 | 2 | 4 | 73 | 1,330,000 | 18,224 | resale |
| 28.11.2024 | ulica Cybernetyki 4 | 2 | 2 | 43.2 | 930,000 | 21,523 | resale |
| 25.11.2024 | ulica Cybernetyki 6 | 3 | 2 | 46.5 | 1,020,000 | 21,912 | resale |
| 20.11.2024 | ulica Komputerowa 8 | 6 | 2 | 41.4 | 700,000 | 16,925 | resale |
| 08.11.2024 | ulica Komputerowa 7 | 5 | 2 | 42.1 | 810,000 | 19,258 | resale |
| 07.11.2024 | ulica Cybernetyki 7F | 2 | 4 | 76.9 | 1,520,000 | 19,766 | resale |
| 05.11.2024 | ulica Postępu 12C | 3 | 2 | 49.1 | 1,060,000 | 21,575 | resale |
| 31.10.2024 | ulica Cybernetyki 7H | 2 | 2 | 36.7 | 670,000 | 18,241 | resale |
| 24.10.2024 | ulica Cybernetyki 7C | 3 | — | 76.3 | 1,529,000 | 20,029 | resale |
| 23.10.2024 | ulica Cybernetyki 7H | 1 | — | 98.7 | 1,860,000 | 18,843 | resale |
| 18.10.2024 | ulica Obrzeżna 5F | 1 | 2 | 38.8 | 794,000 | 20,480 | resale |
| 18.10.2024 | ulica Cybernetyki 2 | 3 | 2 | 36.9 | 770,000 | 20,879 | resale |
| 15.10.2024 | ulica Cybernetyki 7H | 6 | 2 | 43.7 | 920,000 | 21,077 | resale |
| 25.09.2024 | ulica Cybernetyki 7D | 3 | 2 | 74.2 | 1,440,000 | 19,410 | resale |
| 20.09.2024 | ulica Cybernetyki 6 | 4 | 2 | 30.4 | 730,000 | 24,053 | resale |
| 18.09.2024 | ulica Cybernetyki 4A | 6 | 3 | 67 | 1,270,000 | 18,961 | resale |
| 13.09.2024 | ulica Wynalazek 2 | 5 | 2 | 39.3 | 800,000 | 20,351 | resale |
| 13.09.2024 | ulica Cybernetyki 4 | 2 | 3 | 65.2 | 1,330,000 | 20,389 | resale |
| 12.09.2024 | ulica Cybernetyki 4A | 4 | 2 | 37 | 790,000 | 21,369 | resale |
| 04.09.2024 | ulica Cybernetyki 4 | 7 | 2 | 36.3 | 810,000 | 22,333 | resale |
| 27.08.2024 | ulica Komputerowa 8 | 7 | 7 | 54.8 | 950,000 | 17,348 | resale |
| 20.08.2024 | ulica Cybernetyki 7E | 1 | 4 | 80.2 | 1,650,000 | 20,574 | resale |
| 12.08.2024 | ulica Cybernetyki 7C | 3 | — | 97.7 | 1,680,000 | 17,190 | resale |
| 09.08.2024 | ulica Komputerowa 7 | 3 | 4 | 71.6 | 1,170,000 | 16,341 | resale |
| 25.07.2024 | ulica Cybernetyki 4A | 6 | 3 | 82.1 | 1,510,000 | 18,394 | resale |
| 23.07.2024 | ulica Cybernetyki 3C | 13 | 3 | 37.6 | 830,000 | 22,086 | resale |
| 20.07.2024 | ulica Cybernetyki 3C | 13 | 2 | 59.6 | 1,100,000 | 18,444 | resale |
| 19.07.2024 | ulica Cybernetyki 7G | 2 | 2 | 55.7 | 1,148,000 | 20,603 | resale |
| 16.07.2024 | ulica Cybernetyki 7F | 7 | 2 | 55.6 | 1,139,000 | 20,486 | resale |
| 16.07.2024 | ulica Cybernetyki 7G | 2 | 5 | 102.1 | 1,705,000 | 16,701 | resale |
| 28.06.2024 | ulica Cybernetyki 4A | 6 | 2 | 38.4 | 804,500 | 20,934 | resale |
| 10.06.2024 | ulica Obrzeżna 5F | 11 | 3 | 49.3 | 840,000 | 17,049 | resale |
| 28.05.2024 | ulica Cybernetyki 6B | 1 | 2 | 43.6 | 980,000 | 22,456 | resale |
| 28.05.2024 | ulica Cybernetyki 6A | 2 | 2 | 41.5 | 935,000 | 22,508 | resale |
| 27.05.2024 | ulica Cybernetyki 4A | 5 | 3 | 54.8 | 1,150,000 | 20,989 | resale |
| 20.05.2024 | ulica Cybernetyki 7C | 6 | 4 | 97.9 | 1,720,000 | 17,569 | resale |
| 17.05.2024 | ulica Wynalazek 2 | 6 | 3 | 63.4 | 1,075,000 | 16,959 | resale |
| 13.05.2024 | ulica Cybernetyki 7G | 2 | 2 | 37.8 | 756,000 | 19,989 | resale |
| 13.05.2024 | ulica Wynalazek 2 | 3 | 4 | 64.8 | 1,070,000 | 16,500 | resale |
| 25.04.2024 | ulica Cybernetyki 4 | 9 | 3 | 48.9 | 1,280,000 | 26,160 | resale |
| 25.04.2024 | ulica Cybernetyki 7H | 1 | 2 | 48 | 1,000,000 | 20,820 | resale |
| 25.04.2024 | ulica Cybernetyki 4A | 3 | 4 | 87.9 | 1,300,000 | 14,781 | resale |
| 18.04.2024 | ulica Postępu 10 | 8 | 4 | 92.9 | 1,540,000 | 16,581 | resale |
| 16.04.2024 | ulica Postępu 10 | 12 | 2 | 60.7 | 1,202,000 | 19,799 | resale |
| 15.04.2024 | ulica Cybernetyki 7F | 7 | 2 | 55.6 | 979,900 | 17,624 | resale |
| 11.04.2024 | ulica Cybernetyki 7E | 5 | 4 | 100.3 | 1,650,000 | 16,451 | resale |
| 03.04.2024 | ulica Komputerowa 7 | 6 | 2 | 42.2 | 845,000 | 20,038 | resale |
| 21.03.2024 | ulica Cybernetyki 7C | 3 | 2 | 75.5 | 1,329,000 | 17,603 | resale |
| 15.03.2024 | ulica Cybernetyki 7F | 2 | 3 | 63.3 | 1,145,000 | 18,088 | resale |
| 15.03.2024 | ulica Postępu 10 | 6 | 2 | 35.5 | 470,000 | 13,251 | resale |
| 14.03.2024 | ulica Komputerowa 8 | 5 | 2 | 40.3 | 810,000 | 20,099 | resale |
| 07.03.2024 | ulica Cybernetyki 4A | 4 | 3 | 67.2 | 1,380,000 | 20,530 | resale |
| 27.02.2024 | ulica Postępu 12B | 6 | — | 72.5 | 1,230,000 | 16,968 | resale |
| 26.02.2024 | ulica Postępu 12B | 7 | 3 | 77 | 1,700,000 | 22,078 | resale |
| 22.02.2024 | ulica Komputerowa 8 | 7 | 2 | 31.2 | 550,000 | 17,634 | resale |
| 22.02.2024 | ulica Cybernetyki 4 | 4 | 2 | 43.2 | 850,000 | 19,680 | resale |
| 16.02.2024 | ulica Postępu 12B | 9 | — | 54.5 | 615,000 | 11,295 | resale |
| 09.02.2024 | ulica Cybernetyki 7H | 6 | 4 | 96.7 | 1,730,000 | 17,887 | resale |
| 08.02.2024 | ulica Cybernetyki 13 | 7 | 3 | 92.6 | 1,300,000 | 14,043 | resale |
| 02.02.2024 | ulica Komputerowa 8 | 5 | 2 | 28.3 | 506,000 | 17,893 | resale |
| 30.01.2024 | ulica Cybernetyki 3C | 8 | 5 | 103.5 | 2,275,000 | 21,983 | resale |
| 19.01.2024 | ulica Cybernetyki 7H | 2 | 2 | 38 | 710,000 | 18,699 | resale |
| 19.01.2024 | ulica Komputerowa 9 | 2 | 3 | 58.7 | 1,100,000 | 18,730 | resale |
| 16.01.2024 | ulica Cybernetyki 7E | 2 | 4 | 100.2 | 1,530,000 | 15,269 | resale |
| 11.01.2024 | ulica Cybernetyki 4 | 4 | 2 | 35.9 | 725,000 | 20,178 | resale |
| 09.01.2024 | ulica Cybernetyki 4A | 4 | 3 | 59.4 | 1,180,000 | 19,862 | resale |
| 08.01.2024 | ulica Wynalazek 2 | 5 | 2 | 49.6 | 950,000 | 19,165 | resale |
| 04.01.2024 | ulica Postępu 12E | 2 | 3 | 55.3 | 1,160,000 | 20,992 | resale |
| 14.12.2023 | ulica Cybernetyki 7F | 4 | 4 | 76.5 | 950,000 | 12,418 | resale |
| 11.12.2023 | ulica Komputerowa 7 | 6 | 2 | 40.8 | 680,000 | 16,650 | resale |
| 01.12.2023 | ulica Cybernetyki 2 | 3 | 2 | 44.5 | 733,597 | 16,500 | resale |
| 28.11.2023 | ulica Obrzeżna 5E | 3 | 3 | 58.7 | 980,000 | 16,689 | resale |
| 28.11.2023 | ulica Cybernetyki 7H | 5 | 2 | 43.7 | 660,000 | 15,120 | resale |
| 22.11.2023 | ulica Cybernetyki 7D | 3 | 3 | 80.1 | 1,497,000 | 18,691 | resale |
| 17.11.2023 | ulica Cybernetyki 7F | 4 | 2 | 38.1 | 800,000 | 20,997 | resale |
| 15.11.2023 | ulica Cybernetyki 7F | 5 | 2 | 44.2 | 845,000 | 19,118 | resale |
| 06.11.2023 | ulica Wynalazek 2 | 2 | 2 | 43.2 | 780,000 | 18,068 | resale |
| 03.11.2023 | ulica Cybernetyki 7F | 4 | 3 | 55.3 | 920,000 | 16,637 | resale |
| 02.11.2023 | ulica Cybernetyki 7C | 3 | 3 | 78.3 | 1,300,000 | 16,611 | resale |
| 30.10.2023 | ulica Komputerowa 8 | 7 | 2 | 32.9 | 593,000 | 18,019 | resale |
| 30.10.2023 | ulica Komputerowa 8 | 7 | 2 | 32.6 | 590,000 | 18,087 | resale |
| 27.10.2023 | ulica Cybernetyki 4A | 6 | 4 | 68.9 | 1,110,000 | 16,101 | resale |
| 25.10.2023 | ulica Obrzeżna 5F | 7 | 2 | 38.3 | 605,000 | 15,813 | resale |
| 25.10.2023 | ulica Cybernetyki 7D | 4 | 2 | 51.2 | 855,000 | 16,709 | resale |
| 24.10.2023 | ulica Cybernetyki 7D | 7 | 3 | 77.3 | 1,365,000 | 17,647 | resale |
| 20.10.2023 | ulica Komputerowa 8 | 3 | 2 | 27.8 | 570,000 | 20,518 | resale |
| 19.10.2023 | ulica Cybernetyki 7H | 2 | 2 | 51.3 | 1,000,000 | 19,478 | resale |
| 18.10.2023 | ulica Cybernetyki 4A | 7 | 2 | 37.8 | 760,000 | 20,122 | resale |
| 13.10.2023 | ulica Cybernetyki 7F | 1 | 4 | 97.8 | 1,670,000 | 17,076 | resale |
| 11.10.2023 | ulica Postępu 12C | 5 | 4 | 75.8 | 1,250,000 | 16,502 | resale |
| 11.10.2023 | ulica Komputerowa 8 | 3 | 2 | 34.6 | 600,000 | 17,346 | resale |
| 06.10.2023 | ulica Cybernetyki 6A | 2 | 3 | 53.3 | 1,000,000 | 18,769 | resale |
| 22.09.2023 | ulica Komputerowa 8 | 8 | 2 | 31.4 | 530,000 | 16,906 | resale |
| 21.09.2023 | ulica Cybernetyki 7D | 6 | 3 | 77.2 | 1,050,000 | 13,599 | resale |
| 15.09.2023 | ulica Komputerowa 8 | 7 | 2 | 41.3 | 820,000 | 19,831 | resale |
| 06.09.2023 | ulica Obrzeżna 5E | 3 | 4 | 65.8 | 1,230,000 | 18,679 | resale |
| 06.09.2023 | ulica Cybernetyki 7E | 3 | 4 | 79.9 | 1,130,000 | 14,143 | resale |
| 05.09.2023 | ulica Cybernetyki 7G | 1 | 2 | 59.7 | 1,104,000 | 18,499 | resale |
| 25.08.2023 | ulica Cybernetyki 7F | 3 | 4 | 78.5 | 1,200,000 | 15,287 | resale |
| 25.08.2023 | ulica Komputerowa 8 | 8 | 3 | 61.6 | 960,000 | 15,584 | resale |
| 03.08.2023 | ulica Cybernetyki 13 | 7 | 5 | 147.4 | 1,891,000 | 12,833 | resale |
| 31.07.2023 | ulica Cybernetyki 7E | 6 | 2 | 37.3 | 667,000 | 17,882 | resale |
| 31.07.2023 | ulica Postępu 12B | 6 | 2 | 41.3 | 775,000 | 18,774 | resale |
| 20.07.2023 | ulica Cybernetyki 7F | 6 | 2 | 44.8 | 778,000 | 17,366 | resale |
| 14.07.2023 | ulica Cybernetyki 15 | 4 | 4 | 87.1 | 1,690,000 | 19,401 | resale |
| 12.07.2023 | ulica Postępu 12D | 5 | 4 | 71 | 1,170,000 | 16,474 | resale |
| 12.07.2023 | ulica Postępu 12C | 6 | 2 | 49.2 | 940,000 | 19,086 | resale |
| 30.06.2023 | ulica Wynalazek 2 | 6 | 2 | 29.6 | 530,000 | 17,911 | resale |
| 23.06.2023 | ulica Postępu 12B | 3 | 3 | 59.5 | 668,594 | 11,229 | resale |
| 15.06.2023 | ulica Postępu 12B | 4 | 3 | 73.5 | 1,275,000 | 17,352 | resale |
| 15.06.2023 | ulica Postępu 10 | 4 | 2 | 54 | 890,000 | 16,475 | resale |
| 13.06.2023 | ulica Cybernetyki 2 | 3 | 3 | 65.5 | 1,070,000 | 16,343 | resale |
| 01.06.2023 | ulica Wynalazek 2 | 2 | 3 | 46.9 | 690,000 | 14,703 | resale |
| 01.06.2023 | ulica Komputerowa 8 | 8 | 3 | 61.6 | 680,000 | 11,039 | resale |
| 25.05.2023 | ulica Komputerowa 8 | 5 | 2 | 32.8 | 600,000 | 18,270 | resale |
| 25.05.2023 | ulica Postępu 10 | 3 | 3 | 65.9 | 1,090,000 | 16,545 | resale |
| 23.05.2023 | ulica Komputerowa 8 | 2 | 4 | 67.4 | 1,015,000 | 15,064 | resale |
| 22.05.2023 | ulica Komputerowa 8 | 2 | 4 | 74.4 | 950,000 | 12,765 | resale |
| 09.05.2023 | ulica Postępu 12E | 2 | 3 | 62.3 | 980,000 | 15,728 | resale |
| 21.04.2023 | ulica Cybernetyki 7F | 5 | 2 | 44.6 | 699,000 | 15,673 | resale |
| 07.04.2023 | ulica Cybernetyki 3B | 13 | 4 | 79.5 | 1,250,000 | 15,721 | resale |
| 05.04.2023 | ulica Wynalazek 2 | 3 | 4 | 63.5 | 900,000 | 14,178 | resale |
| 31.03.2023 | ulica Cybernetyki 4A | 7 | 2 | 36.9 | 645,000 | 17,470 | resale |
| 30.03.2023 | ulica Wynalazek 2 | 3 | 3 | 47.8 | 680,000 | 14,235 | resale |
| 30.03.2023 | ulica Komputerowa 8 | 7 | 2 | 41.3 | 539,000 | 13,035 | resale |
| 29.03.2023 | ulica Cybernetyki 4A | 3 | 3 | 54.2 | 899,000 | 16,599 | resale |
| 27.03.2023 | ulica Postępu 12B | 3 | 3 | 59.5 | 668,594 | 11,229 | resale |
| 24.03.2023 | ulica Cybernetyki 4A | 4 | 2 | 58.4 | 970,000 | 16,615 | resale |
| 22.03.2023 | ulica Komputerowa 8 | 6 | 3 | 51.3 | 880,000 | 17,167 | resale |
| 20.03.2023 | ulica Cybernetyki 4A | 3 | 4 | 83.8 | 1,485,000 | 17,719 | resale |
| 17.03.2023 | ulica Wynalazek 2 | 3 | 2 | 30.2 | 505,000 | 16,727 | resale |
| 17.03.2023 | ulica Cybernetyki 7H | 2 | 2 | 36.7 | 659,000 | 17,942 | resale |
| 16.03.2023 | ulica Postępu 12B | 5 | 2 | 77.4 | 678,600 | 8,771 | resale |
| 08.03.2023 | ulica Cybernetyki 7H | 6 | — | 73.1 | 1,237,800 | 16,945 | resale |
| 06.03.2023 | ulica Cybernetyki 7G | 7 | 2 | 31 | 600,000 | 19,324 | resale |
| 03.03.2023 | ulica Komputerowa 8 | 2 | 2 | 34.6 | 295,410 | 8,535 | resale |
| 15.02.2023 | ulica Postępu 12B | 6 | — | 86.7 | 1,600,000 | 18,452 | resale |
| 16.01.2023 | ulica Cybernetyki 7D | 6 | — | 77.1 | 1,200,000 | 15,556 | resale |
| 09.01.2023 | ulica Cybernetyki 4 | 3 | 2 | 43.2 | 739,000 | 17,126 | resale |
| 29.12.2022 | ulica Komputerowa 8 | 7 | 2 | 41.4 | 534,000 | 12,886 | resale |
| 23.12.2022 | ulica Postępu 12B | 5 | — | 49.6 | 740,000 | 14,913 | resale |
| 22.12.2022 | ulica Cybernetyki 15 | 2 | 2 | 33.1 | 591,000 | 17,839 | resale |
| 20.12.2022 | ulica Postępu 10 | 6 | 2 | 37.5 | 650,000 | 17,319 | resale |
| 15.12.2022 | ulica Postępu 12B | 4 | — | 49.6 | 800,000 | 16,116 | resale |
| 12.12.2022 | ulica Komputerowa 7 | 4 | 3 | 61.7 | 537,800 | 8,723 | resale |
| 08.12.2022 | ulica Postępu 12B | 9 | 3 | 50.5 | 1,155,000 | 22,862 | resale |
| 30.11.2022 | ulica Komputerowa 8 | 3 | 2 | 35.3 | 500,000 | 14,148 | resale |
| 29.11.2022 | ulica Cybernetyki 15 | 2 | 2 | 37.5 | 620,000 | 16,511 | resale |
| 28.11.2022 | ulica Postępu 10 | 9 | 2 | 45.1 | 530,000 | 11,759 | resale |
| 28.11.2022 | ulica Postępu 12E | 3 | 3 | 60 | 960,000 | 16,008 | resale |
| 25.11.2022 | ulica Cybernetyki 7F | 2 | 2 | 37.1 | 620,000 | 16,712 | resale |
| 23.11.2022 | ulica Cybernetyki 7D | 5 | 2 | 44.8 | 640,000 | 14,273 | resale |
| 18.11.2022 | ulica Cybernetyki 3B | 11 | 2 | 40.1 | 715,000 | 17,835 | resale |