Kwadrato Warsaw
Address · 02-676 · Mokotów

ulica Postępu 12E sale prices and the building's surroundings

Check a listing
Typical price here
19,503 zł/m²
middle 50% of sales: 18,308 – 21,310 zł/m²
83 sales over 24 months · Radius 300 m
Typical flat 58.8 m² ≈ 1,146,583 zł
≈ 5,488 zł per month with a 20% down payment and a 30-year mortgage
Compared with the city+23.5%
Change over the year-0.5%
Typical flat58.8 m²

The building has only 1 sale in 24 months — showing the nearest area with at least 20 sales.

Location

Pros

  • tram 5 min away
  • separate cycle track 3 min away
  • bike-share station 6 min away
  • quiet: noise below 55 dB
  • grocery shops within 500 m: 29

Things to watch out for

No obvious drawbacks found.

    Transport7/10
    good
    34 min to the centre; rush-hour departures nearby: 963
    Shops nearby9/10
    excellent
    within 500 m grocery shops: 29, pharmacies: 2; doctors within 1 km: 22
    Schools and kindergartens8/10
    good
    school 8 min away (exam 62%); kindergartens within 1 km: 17
    Quiet10/10
    excellent
    noise below 55 dB
    Green space4/10
    weak
    18% green space within 500 m, park 12 min away
    Low risk10/10
    excellent
    outside flood zones
    On the map:

    Risks

    • noise below 55 dB according to the noise map
    • outside ISOK flood zones
    • NO₂ 17.1 µg/m³ per year — below the 2030 EU limit (20)
    • PM2.5 dust 15 µg/m³ a year — within the Polish limit of 20, but above the EU limit from 2030 (10)
    • nearest plant with a risk of a major accident (SEVESO) — 1,714 m away: warehouse, terminal, logistics
    • no plants of the PRTR pollutant register within 1 km

    Sources: the city's strategic noise map, ISOK flood maps (Wody Polskie), EEA annual air quality model (1 km), SEVESO and PRTR registers (GIOŚ). The maps are a general guide, not a verdict on an individual building.

    What may be built nearby

    • A local zoning plan (MPZP) is in force №XXIX/625/2011 «Służewiec Przemysłowy w rej. ul. Cybernetyki cz. I» — what can be built nearby is already set.
    • Allowed by the plan within 150 m: blocks of flats (0 m); services: shops, offices, venues (28 m); streets and roads (137 m).
    • Building permits within 500 m in the last 3 years (GUNB): 5 — housing 2, services and offices 3.
      • block of flats, new building · 241 m · permit 07.11.2024
        zmiana decyzji 207/B/2023 z 13.10.2023 zatwierdzającej projekt zagospodarowania terenu oraz projekt architektoniczno - budowlanegy i udziela
      • shop, restaurant or services, new building · 326 m · permit 25.11.2025
        zmiana decyzji nr 41/B/2023 z dn. 28.02.2023 udzielającej pozwolenia na rozbiórkę budynku istniejącego biurowo-magazynowego oraz zatwierdz
      • hotel or dormitory, new building · 326 m · permit 20.05.2025
        zmiana decyzji 41/B/2023 z 28.02.2023 udzielającej pozwolenia na rozbiórkę budynku istniejącego biurowo-magazynowego oraz zatwierdzającej p
      • shop, restaurant or services, added storeys · 383 m · permit 13.05.2026
        przebudowa części galerii Westfield Mokotów na poziomie +1 w obszarze osi AF-AI/15-17 i nadbudowa w osiach AF-AJ/7-19 wraz z niezbędnymi dem
    All land uses within 150 m
    • blocks of flats · 0 m
    • services: shops, offices, venues · 28 m
    • streets and roads · 137 m

    What buying will cost

    For a typical flat here — 1,146,583 zł, 58.8 m², 80% mortgage over 30 years at 5.98%.

    Cash up front258,291 zł
    Monthly payment5,488 zł
    Taxes and notary28,974 zł

    Calculate for your situation →

    Why the price is what it is here

    What affects the price here

    How we calculate this

    District Mokotów: similar flats here are on average pricier by 13.7% compared with the city average.

    Tram nearby · 242 m+0.9%

    Effect on the price per m² compared with similar flats in the same district, based on 2022–2026 sales. These are statistical links, not a guarantee for a specific flat.

    Developer prices nearby
    DevelopmentDistanceFlatsMedian zł/m²Change
    Cybernetyki 7/7B
    Flora Development 23 Sp. z o. o.
    335 m12021,087-6%
    Bokserska 54B
    Moko Botanika Property Spółka z ograniczoną odpowiedzialnością
    860 m820,544-3.1%
    Bokserska 54
    Moko Botanika Property Spółka z ograniczoną odpowiedzialnością
    860 m921,393-1.4%
    Bokserska 54A
    Moko Botanika Property Spółka z ograniczoną odpowiedzialnością
    860 m720,709-3.6%
    Bokserska 71
    Dom Development S.A.
    866 m11717,650—
    Bokserska 71
    Dom Development S.A.
    866 m5817,000+2.4%
    Bokserska 71
    Dom Development S.A.
    866 m316,450+0.1%
    Bokserska
    Spravia – Bokserska 2 spółka z ograniczoną odpowiedzialnością
    916 m116,890+0.4%

    Asking prices from daily price lists (dane.gov.pl), 1.5 km radius.

    What to check yourself before buying
    • Land and mortgage register (KW) — owner, mortgages, encumbrances: free of charge at ekw.ms.gov.pl.
    • Type of ownership — full ownership or cooperative right; share of the land in perpetual usufruct (annual fee).
    • Fees — fees to the owners' association, repair fund, any arrears of the previous owner.
    • Building — year built, condition of the roof and façade, planned repairs (owners' association minutes).
    • Flat — which way the windows face, ventilation, damp, window frames, heating.
    • For a new build — information prospectus, building permit, escrow bank account.
    Location in detail: stops, schools, green space, sun

    Location card

    from the address

    Transport

    34 min to the centre at 7:45 on a weekday

    • Rondo Żabczyńskiego · 187 m · 16 departures 7–9 am
      317
    • Postępu · 200 m · 258 departures 7–9 am
      171831189401402504
    • Cybernetyki · 231 m · 67 departures 7–9 am
      136138165317N34
    • Rondo Unii Europejskiej · 234 m · 351 departures 7–9 am
      171831136138165189218317401402504N01N33
    • Wynalazek · 328 m · 189 departures 7–9 am
      171831189401402504
    Time to other districts at 7:45: 4 of 18 within 30 min
    Mokotów — your district29 min
    Włochy28 min
    Ochota29 min
    Ursynów29 min
    Śródmieście41 min
    Ursus42 min
    Wola43 min
    Wilanów44 min
    Praga-Południe46 min
    Żoliborz50 min
    Bemowo53 min
    Praga-Północ53 min
    Rembertów57 min
    Bielany67 min
    Wawer70 min
    Targówek71 min
    Wesoła78 min
    Białołęka97 min

    By public transport and on foot to where most of the district's addresses are; a weekday, by the timetable.

    Schools and kindergartens

    SZKOŁA PODSTAWOWA IM KOMISJI EDUKACJI NARODOWEJ473 m61.7%
    SZKOŁA PODSTAWOWA Z ODDZIAŁAMI DWUJĘZYCZNYMI NR 20 IM. JANA private556 m87.7%
    NIEPUBLICZNA SZKOŁA PODSTAWOWA NEW HORIZON INTERNATIONAL SCHprivate729 m—
    SZKOŁA PODSTAWOWA NR 271 IM. 11 LISTOPADA793 m70.1%

    The last column is the average 8th-grade exam result (Polish, maths, English), CKE. The city does not publish the school catchment area for each address — check at edukacja.um.warszawa.pl.

    Kindergartens within 1 km: 17 (public: 4) · nearest: 3 min walk

    Nearby

    Grocery shops29 within 500 mnearest: 2 min walk
    Pharmacies2 within 500 mnearest: 6 min walk
    Doctors, clinics22 within 1 kmnearest: 2 min walk
    Playgrounds14 within 500 mnearest: 1 min walk
    Cafés and restaurants40 within 500 mnearest: 1 min walk
    City bike hire1 within 500 mnearest: 6 min walk
    Gyms9 within 1 kmnearest: 3 min walk
    Park & Ride1 within 2 kmnearest: 31 min walk
    EV chargers4 within 1 kmnearest: 9 min walk

    Green space, noise, air

    18% of the area within 500 m — parks, forests, lawns

    Nearest green area: right nearby · park «Pigalak» — 660 m

    Noise: roadsquiet (below 55 dB)
    Noise: tramsquiet (below 55 dB)
    Noise: railwayquiet (below 55 dB)
    Noise: airportquiet (below 55 dB)
    Noise: industryquiet (below 55 dB)

    Strategic noise map, LDWN (24 h). Limit for blocks of flats: 68 dB from roads, trams and railways (70 dB in a big city's centre zone), 60 dB from aircraft, 55 dB from industry. WHO recommends up to 53 dB from roads.

    Loading air quality…

    Risks and restrictions

    Flood once in 10 yearsno
    Flood once in 100 yearsno
    Flood once in 500 yearsno
    Flood if a levee breaksno
    Paid parkingno

    Flood zones — ISOK (Wody Polskie); 1 cell ≈ 7 m. Being in the Q1% zone affects insurance and mortgages.

    What may be built nearby

    Local zoning plan (MPZP)№XXIX/625/2011 Służewiec Przemysłowy w rej. ul. Cybernetyki cz. I · resolution
    Land use within 150 m
    MW/U zabudowa wielorodzinna z usługami
    U/U-A tereny usług · 28 m
    KDZ droga zbiorcza · 137 m
    KDG droga główna · 148 m

    MW — blocks of flats, MN — houses, U — services, ZP — parks, KD — roads.

    Sun

    Calculating…

    Sources: GTFS, OpenStreetMap, city GIS, ISOK, GIOŚ, RSPO, CKE, GUGiK. Source status

    Sales, charts and filters (155 sales)

    Area: Radius 300 m · 155 sales with filters applied

    Market
    Rooms
    Area, m²
    Floor
    Period
    Median, 12 mo.
    19,403 zł/m²
    36 sales
    Difference from the city, 12 mo.
    +19.7%
    city: 16,212 zł/m²
    Difference from the district
    +5.5%
    Mokotów: 18,390 zł/m²
    Change over the year
    -0.5%
    prices within the same market (new builds with new builds)
    Median price
    1,085,000 zł
    area 59.1 m²
    All time
    18,961 zł/m²
    155 sales · primary market 0%
    Company buyers
    2.8%
    share of sales in 12 mo.

    Median price per m² by quarter

    The band is the middle 50% of sales in the area. Quarters with fewer than 3 sales in the area are skipped. The last quarter is incomplete.

    Distribution of price per m²

    10,000–11,000 zł/m²: 2 sales11,000–12,000 zł/m²: 4 sales12,000–13,000 zł/m²: 0 sales13,000–14,000 zł/m²: 3 sales14,000–15,000 zł/m²: 6 sales15,000–16,000 zł/m²: 9 sales16,000–17,000 zł/m²: 19 sales17,000–18,000 zł/m²: 17 sales18,000–19,000 zł/m²: 18 sales19,000–20,000 zł/m²: 27 sales20,000–21,000 zł/m²: 16 sales21,000–22,000 zł/m²: 15 sales22,000–23,000 zł/m²: 13 sales23,000–24,000 zł/m²: 0 sales24,000–25,000 zł/m²: 6 sales10111213141516171819202122232425

    area median 18,961 zł/m² city median 16,212 zł/m² · k zł/m², 155 sales

    Resales

    5 sales — flats sold twice. Median price change +9.8% over a median of 8.6 mo. between deeds.

    The first price mostly comes from the developer's handover deed and was agreed 1–3 years earlier, so the difference shows growth over a longer period.

    AddressAreaBoughtPriceSoldPriceDifference
    ulica Cybernetyki 2B61.527.05.20251,250,00013.02.20261,000,000-20%
    ulica Postępu 12B73.515.06.20231,275,00001.08.20251,400,000+9.8%
    ulica Cybernetyki 2D8117.01.20251,200,00026.06.20251,722,000+43.5%
    ulica Cybernetyki 2C65.831.08.20231,000,00018.06.20251,140,000+14%
    ulica Postępu 12B59.527.03.2023668,59423.06.2023668,5940%

    Sales (155)

    CSV
    DateAddressFloorRoomsAreaPricezł/m²Market
    19.05.2026ulica Cybernetyki 4A73731,330,00018,219resale
    11.05.2026ulica Cybernetyki 3A7251.7965,00018,683resale
    08.05.2026ulica Obrzeżna 7A6240.8780,00019,122resale
    24.04.2026ulica Cybernetyki 2H3367.91,180,00017,384resale
    23.04.2026ulica Cybernetyki 6A4237.8800,00021,181resale
    14.04.2026ulica Cybernetyki 6A7356.51,080,00019,132resale
    10.04.2026ulica Postępu 103260.6998,00016,458resale
    31.03.2026ulica Cybernetyki 22483.81,650,00019,701resale
    31.03.2026ulica Cybernetyki 4A5229.9635,00021,252resale
    19.03.2026ulica Cybernetyki 6B7241.2888,00021,543resale
    25.02.2026ulica Cybernetyki 46369.11,350,00019,528resale
    16.02.2026ulica Postępu 12C6375.81,850,00024,419resale
    13.02.2026ulica Cybernetyki 2B5361.51,000,00016,265resale
    12.02.2026ulica Cybernetyki 6B4479.61,535,00019,277resale
    02.02.2026ulica Cybernetyki 6B6243.6950,00021,789resale
    16.01.2026ulica Obrzeżna 7A76165.61,598,5849,653resale
    16.01.2026ulica Postępu 12E7251.51,110,00021,545resale
    12.01.2026ulica Cybernetyki 4A2266.31,180,00017,793resale
    09.01.2026ulica Cybernetyki 6B6250.11,070,00021,370resale
    07.01.2026ulica Cybernetyki 6B2244980,00022,293resale
    19.12.2025ulica Cybernetyki 4A24102.21,720,00016,830resale
    17.12.2025ulica Cybernetyki 3C10359.91,220,00020,357resale
    12.12.2025ulica Obrzeżna 7A10373.91,235,00016,712resale
    04.12.2025ulica Cybernetyki 3C9237.6750,00019,963resale
    21.11.2025ulica Obrzeżna 7A3258.81,020,00017,350resale
    12.11.2025ulica Postępu 1010245.2920,00020,345resale
    30.10.2025ulica Postępu 106482.61,775,00021,494resale
    10.10.2025ulica Cybernetyki 2A3230.8660,00021,408resale
    16.09.2025ulica Cybernetyki 4A8371.71,300,00018,129resale
    08.09.2025ulica Postępu 1033811,360,00016,786resale
    04.09.2025ulica Postępu 12B6359.41,320,00022,215resale
    04.09.2025ulica Cybernetyki 4A2232670,00020,964resale
    03.09.2025ulica Obrzeżna 7A8258.51,090,00018,617resale
    29.08.2025ulica Postępu 102492.81,650,00017,778resale
    25.08.2025ulica Cybernetyki 24236.7705,00019,226resale
    18.08.2025ulica Postępu 104250.2990,00019,733resale
    05.08.2025ulica Cybernetyki 4A6241.3800,00019,375resale
    01.08.2025ulica Postępu 12B4373.51,400,00019,053resale
    25.07.2025ulica Cybernetyki 63361.41,130,00018,392resale
    14.07.2025ulica Cybernetyki 67361.41,130,00018,392resale
    11.07.2025ulica Cybernetyki 454731,355,00018,564resale
    26.06.2025ulica Cybernetyki 2D55811,722,00021,251resale
    18.06.2025ulica Cybernetyki 663651,400,00021,532resale
    18.06.2025ulica Cybernetyki 2C3465.81,140,00017,338resale
    17.06.2025ulica Cybernetyki 2B4469.51,300,00018,705resale
    09.06.2025ulica Cybernetyki 23369.21,350,00019,509resale
    09.06.2025ulica Cybernetyki 24369.21,350,00019,503resale
    27.05.2025ulica Cybernetyki 2B5361.51,250,00020,332resale
    23.05.2025ulica Cybernetyki 4A7475.61,500,00019,844resale
    23.04.2025ulica Cybernetyki 28253.31,312,00024,602resale
    27.03.2025ulica Postępu 1034851,500,00017,639resale
    26.03.2025ulica Postępu 12B2241.4950,00022,958resale
    19.03.2025ulica Cybernetyki 4A7363.11,100,00017,438resale
    21.02.2025ulica Cybernetyki 2C2349.8900,00018,069resale
    21.02.2025ulica Postępu 1011369.71,300,00018,665resale
    12.02.2025ulica Postępu 1010360.71,170,00019,281resale
    29.01.2025ulica Obrzeżna 7A13247.2990,00020,961resale
    27.01.2025ulica Cybernetyki 47246.5900,00019,338resale
    24.01.2025ulica Cybernetyki 3C6244.8800,00017,873resale
    17.01.2025ulica Cybernetyki 2D55811,200,00014,809resale
    15.01.2025ulica Cybernetyki 4A4132770,00024,055resale
    07.01.2025ulica Cybernetyki 4A2471.91,200,00016,692resale
    12.12.2024ulica Postępu 12B8377.31,854,24024,000resale
    04.12.2024ulica Cybernetyki 424731,330,00018,224resale
    28.11.2024ulica Cybernetyki 42243.2930,00021,523resale
    25.11.2024ulica Cybernetyki 63246.51,020,00021,912resale
    14.11.2024ulica Cybernetyki 2C3349.8950,00019,092resale
    05.11.2024ulica Postępu 12C3249.11,060,00021,575resale
    28.10.2024ulica Cybernetyki 2A7238850,00022,363resale
    25.10.2024ulica Cybernetyki 2C6250.1960,00019,146resale
    18.10.2024ulica Obrzeżna 5F1238.8794,00020,480resale
    18.10.2024ulica Cybernetyki 23236.9770,00020,879resale
    02.10.2024ulica Cybernetyki 2C10241.6853,00020,485resale
    27.09.2024ulica Obrzeżna 7A6250885,00017,704resale
    20.09.2024ulica Obrzeżna 7A3358.21,142,00019,612resale
    20.09.2024ulica Cybernetyki 64230.4730,00024,053resale
    18.09.2024ulica Cybernetyki 4A63671,270,00018,961resale
    18.09.2024ulica Cybernetyki 2B3252.81,005,00019,016resale
    13.09.2024ulica Cybernetyki 42365.21,330,00020,389resale
    12.09.2024ulica Cybernetyki 4A4237790,00021,369resale
    04.09.2024ulica Cybernetyki 47236.3810,00022,333resale
    29.08.2024ulica Obrzeżna 7A3242.6825,00019,371resale
    28.08.2024ulica Cybernetyki 2F5367.81,400,00020,652resale
    25.07.2024ulica Cybernetyki 4A6382.11,510,00018,394resale
    25.07.2024ulica Obrzeżna 7A3384.21,230,00014,617resale
    23.07.2024ulica Cybernetyki 3C13337.6830,00022,086resale
    20.07.2024ulica Cybernetyki 3C13259.61,100,00018,444resale
    19.07.2024ulica Obrzeżna 7A2236.2627,00017,325resale
    05.07.2024ulica Obrzeżna 7A2247.1940,00019,941resale
    28.06.2024ulica Cybernetyki 4A6238.4804,50020,934resale
    10.06.2024ulica Obrzeżna 5F11349.3840,00017,049resale
    28.05.2024ulica Cybernetyki 6B1243.6980,00022,456resale
    28.05.2024ulica Cybernetyki 6A2241.5935,00022,508resale
    27.05.2024ulica Cybernetyki 4A5354.81,150,00020,989resale
    25.04.2024ulica Cybernetyki 49348.91,280,00026,160resale
    25.04.2024ulica Cybernetyki 4A3487.91,300,00014,781resale
    18.04.2024ulica Postępu 108492.91,540,00016,581resale
    16.04.2024ulica Postępu 1012260.71,202,00019,799resale
    03.04.2024ulica Cybernetyki 2A2474.71,150,00015,399resale
    15.03.2024ulica Postępu 106235.5470,00013,251resale
    07.03.2024ulica Cybernetyki 4A4367.21,380,00020,530resale
    05.03.2024ulica Obrzeżna 7A2240.6910,00022,397resale
    27.02.2024ulica Postępu 12B6—72.51,230,00016,968resale
    26.02.2024ulica Postępu 12B73771,700,00022,078resale
    22.02.2024ulica Cybernetyki 2B9230.6680,00022,237resale
    22.02.2024ulica Cybernetyki 44243.2850,00019,680resale
    19.02.2024ulica Cybernetyki 2A9230.7690,00022,461resale
    16.02.2024ulica Postępu 12B9—54.5615,00011,295resale
    30.01.2024ulica Cybernetyki 3C85103.52,275,00021,983resale
    24.01.2024ulica Cybernetyki 35240.2799,51019,898resale
    11.01.2024ulica Cybernetyki 44235.9725,00020,178resale
    09.01.2024ulica Cybernetyki 4A4359.41,180,00019,862resale
    04.01.2024ulica Postępu 12E2355.31,160,00020,992resale
    28.12.2023ulica Cybernetyki 2E1346.6630,00013,516resale
    06.12.2023ulica Cybernetyki 2D1350.1800,00015,962resale
    01.12.2023ulica Cybernetyki 23244.5733,59716,500resale
    27.10.2023ulica Cybernetyki 4A6468.91,110,00016,101resale
    25.10.2023ulica Obrzeżna 5F7238.3605,00015,813resale
    18.10.2023ulica Cybernetyki 4A7237.8760,00020,122resale
    11.10.2023ulica Postępu 12C5475.81,250,00016,502resale
    06.10.2023ulica Cybernetyki 6A2353.31,000,00018,769resale
    31.08.2023ulica Cybernetyki 2C3465.81,000,00015,209resale
    10.08.2023ulica Cybernetyki 2C1233.6605,00018,017resale
    31.07.2023ulica Postępu 12B6241.3775,00018,774resale
    14.07.2023ulica Obrzeżna 7A103781,180,00015,134resale
    12.07.2023ulica Postępu 12D54711,170,00016,474resale
    12.07.2023ulica Postępu 12C6249.2940,00019,086resale
    23.06.2023ulica Postępu 12B3359.5668,59411,229resale
    15.06.2023ulica Postępu 12B4373.51,275,00017,352resale
    15.06.2023ulica Postępu 104254890,00016,475resale
    13.06.2023ulica Cybernetyki 23365.51,070,00016,343resale
    25.05.2023ulica Postępu 103365.91,090,00016,545resale
    09.05.2023ulica Postępu 12E2362.3980,00015,728resale
    07.04.2023ulica Cybernetyki 3B13479.51,250,00015,721resale
    31.03.2023ulica Cybernetyki 4A7236.9645,00017,470resale
    29.03.2023ulica Cybernetyki 4A3354.2899,00016,599resale
    27.03.2023ulica Postępu 12B3359.5668,59411,229resale
    24.03.2023ulica Cybernetyki 4A4258.4970,00016,615resale
    24.03.2023ulica Cybernetyki 2A7469.71,050,00015,075resale
    20.03.2023ulica Cybernetyki 4A3483.81,485,00017,719resale
    16.03.2023ulica Postępu 12B5277.4678,6008,771resale
    15.02.2023ulica Postępu 12B6—86.71,600,00018,452resale
    16.01.2023ulica Obrzeżna 7A5378.61,090,00013,873resale
    16.01.2023ulica Cybernetyki 2B5569.3975,00014,063resale
    12.01.2023ulica Cybernetyki 2C1182.71,175,00014,201resale
    09.01.2023ulica Cybernetyki 43243.2739,00017,126resale
    03.01.2023ulica Cybernetyki 2A8230.8590,00019,162resale
    23.12.2022ulica Postępu 12B5—49.6740,00014,913resale
    20.12.2022ulica Postępu 106237.5650,00017,319resale
    15.12.2022ulica Postępu 12B4—49.6800,00016,116resale
    08.12.2022ulica Postępu 12B9350.51,155,00022,862resale
    28.11.2022ulica Postępu 109245.1530,00011,759resale
    28.11.2022ulica Postępu 12E3360960,00016,008resale
    23.11.2022ulica Cybernetyki 2D6350785,00015,716resale
    18.11.2022ulica Cybernetyki 3B11240.1715,00017,835resale

    Data: Rejestr Cen Nieruchomości (GUGiK), PRG addresses, district boundaries from the city's open data or OpenStreetMap. Sales up to 14.08.2026; entries reach the register about 1.5 months after the sale on average, so the last ~3 months are incomplete. The price is the gross price from the notarial deed; only sales of whole flats on the open market are included.