Kwadrato Warsaw
Address · 02-677 · Mokotów

ulica Cybernetyki 2 sale prices and the building's surroundings

Typical price here
18,787 zł/m²
middle 50% of sales: 16,830 – 20,351 zł/m²
221 sales over 24 months · Radius 500 m
price per m² by quarter, 2022–2026: 14,665 → 19,127
Typical flat 51.5 m² ≈ 967,917 zł
≈ 4,633 zł per month with a 20% down payment and a 30-year mortgage
Compared with the city+19%
Change over the year-0.8%
Typical flat51.5 m²
Check a listing
Refine: rooms, floor, market

Location

Pros

  • tram 7 min away
  • separate cycle track 1 min away
  • grocery shops within 500 m: 28
  • primary school 7 min away, exam 88%

Things to watch out for

  • 38 min to the centre by public transport
  • noise from roads 70+ dB — above the limit for housing (68 dB)
Transport6/10
average
38 min to the centre; rush-hour departures nearby: 938
Shops nearby8/10
good
within 500 m grocery shops: 28, pharmacies: 1; doctors within 1 km: 20
Schools and kindergartens10/10
excellent
school 7 min away (exam 88%); kindergartens within 1 km: 18
Quiet1/10
poor
70+ dB from roads — over the limit
Green space4/10
weak
18% green space within 500 m, park 9 min away
Low risk8/10
good
outside flood zones; road accidents with injuries nearby: 4
On the map:

Risks

Noise from roads: 70+ dB over 24 h (LDWN) — above the Polish limit for blocks of flats, 68 dB

  • outside ISOK flood zones
  • NO₂ 17.7 µg/m³ per year — below the 2030 EU limit (20)
  • PM2.5 dust 15 µg/m³ a year — within the Polish limit of 20, but above the EU limit from 2030 (10)
  • nearest plant with a risk of a major accident (SEVESO) — 1,666 m away: warehouse, terminal, logistics
  • no plants of the PRTR pollutant register within 1 km
  • Road accidents with injuries nearby in 3 years: 4

Sources: the city's strategic noise map, ISOK flood maps (Wody Polskie), EEA annual air quality model (1 km), road accident data, SEVESO and PRTR registers (GIOŚ). The maps are a general guide, not a verdict on an individual building.

What may be built nearby

  • A local zoning plan (MPZP) is in force №XXIX/625/2011 «Służewiec Przemysłowy w rej. ul. Cybernetyki cz. I» — what can be built nearby is already set.
  • Allowed by the plan within 150 m: blocks of flats (0 m); streets and roads (23 m); services: shops, offices, venues (80 m).
  • Building permits within 500 m in the last 3 years (GUNB): 5 — housing 2, services and offices 3.
    • block of flats, new building · 109 m · permit 07.11.2024
      zmiana decyzji 207/B/2023 z 13.10.2023 zatwierdzającej projekt zagospodarowania terenu oraz projekt architektoniczno - budowlanegy i udziela
    • shop, restaurant or services, new building · 140 m · permit 25.11.2025
      zmiana decyzji nr 41/B/2023 z dn. 28.02.2023 udzielającej pozwolenia na rozbiórkę budynku istniejącego biurowo-magazynowego oraz zatwierdz
    • hotel or dormitory, new building · 140 m · permit 20.05.2025
      zmiana decyzji 41/B/2023 z 28.02.2023 udzielającej pozwolenia na rozbiórkę budynku istniejącego biurowo-magazynowego oraz zatwierdzającej p
    • block of flats, new building · 417 m · permit 19.03.2024
      wniosek o pozwolenie na budowe budynku mieszkalnego z uslugami, garazem podziemnym, infrastrukturą wypoczynkową i techniczną na dz 3/14 i 3/
All land uses within 150 m
  • blocks of flats · 0 m
  • streets and roads · 23 m
  • services: shops, offices, venues · 80 m

What buying will cost

For a typical flat here — 967,917 zł, 51.5 m², 80% mortgage over 30 years at 5.98%.

Cash up front218,593 zł
Monthly payment4,633 zł
Taxes and notary25,010 zł

Calculate for your situation →

Why the price is what it is here

What affects the price here

How we calculate this

District Mokotów: similar flats here are on average pricier by 13.7% compared with the city average.

Tram nearby · 371 m+0.9%
Loud road · 70+ dB-1.3%

Effect on the price per m² compared with similar flats in the same district, based on 2022–2026 sales. These are statistical links, not a guarantee for a specific flat.

Developer prices nearby
DevelopmentDistanceFlatsMedian zł/m²Change
Cybernetyki 7/7B
Flora Development 23
418 m12021,087-6%
Bokserska 54B
Moko Botanika Property
688 m720,565-3.1%
Bokserska 54
Moko Botanika Property
688 m921,393-1.4%
Bokserska 54A
Moko Botanika Property
688 m720,709-3.6%
Bokserska 71
Dom Development
795 m5717,000+2.4%
Bokserska 71
Dom Development
795 m11617,650—
Bokserska 71
Dom Development
795 m316,450+0.1%
Bokserska
Spravia – Bokserska 2
866 m116,890+0.4%

Asking prices from daily price lists (dane.gov.pl), 1.5 km radius.

What to check yourself before buying
  • Land and mortgage register (KW) — owner, mortgages, encumbrances: free of charge at ekw.ms.gov.pl.
  • Type of ownership — full ownership or cooperative right; share of the land in perpetual usufruct (annual fee).
  • Fees — fees to the owners' association, repair fund, any arrears of the previous owner.
  • Building — year built, condition of the roof and façade, planned repairs (owners' association minutes).
  • Flat — which way the windows face, ventilation, damp, window frames, heating.
  • For a new build — information prospectus, building permit, escrow bank account.
Location in detail: stops, schools, green space, sun

Location card

from the address

Transport

38 min to the centre at 7:45 on a weekday (1 transfer(s))

  • Cybernetyki · 46 m · 67 departures 7–9 am
    136138165317N34
  • Rondo Żabczyńskiego · 190 m · 16 departures 7–9 am
    317
  • Rondo Unii Europejskiej · 235 m · 351 departures 7–9 am
    171831136138165189218317401402504N01N33
  • Obrzeżna · 291 m · 20 departures 7–9 am
    165
  • Postępu · 381 m · 258 departures 7–9 am
    171831189401402504
Time to other districts at 7:45: 3 of 18 within 30 min
Mokotów — your district29 min
Ursynów29 min
Włochy30 min
Ochota31 min
Ursus42 min
Wola43 min
Wilanów44 min
Praga-Południe46 min
Śródmieście46 min
Praga-Północ53 min
Żoliborz54 min
Rembertów57 min
Bemowo59 min
Bielany70 min
Wawer70 min
Targówek71 min
Wesoła78 min
Białołęka97 min

By public transport and on foot to where most of the district's addresses are; a weekday, by the timetable.

Schools and kindergartens

SZKOŁA PODSTAWOWA Z ODDZIAŁAMI DWUJĘZYCZNYMI NR 20 IM. JANA private370 m87.7%
SZKOŁA PODSTAWOWA IM KOMISJI EDUKACJI NARODOWEJ635 m61.7%
SZKOŁA PODSTAWOWA NR 271 IM. 11 LISTOPADA661 m70.1%
SZKOŁA PODSTAWOWA NR 191 IM. JÓZEFA IGNACEGO KRASZEWSKIEGO904 m64.9%

The last column is the average 8th-grade exam result (Polish, maths, English), CKE. The city does not publish the school catchment area for each address — check at edukacja.um.warszawa.pl.

Kindergartens within 1 km: 18 (public: 4) · nearest: 2 min walk

Universities

Uniwersytet Warszawski 1.1 km18 min
Politechnika Warszawska 2.5 km21 min
Szkoła Główna Gospodarstwa Wiejskiego w Warszawie 3.6 km23 min
Uniwersytet SWPS non-public9.3 km55 min
Warszawski Uniwersytet Medyczny 3.5 km27 min

The city's largest institutions by full-time students. Distance is a straight line to the nearest building of the institution; time is by public transport and on foot at 7:45 on a weekday.

Nearby

Grocery shops28 within 500 mnearest: 1 min walk
Pharmacies1 within 500 mnearest: 3 min walk
Doctors, clinics20 within 1 kmnearest: 2 min walk
Playgrounds12 within 500 mnearest: 2 min walk
Cafés and restaurants30 within 500 mnearest: 1 min walk
City bike hire1 within 500 mnearest: 8 min walk
Gyms7 within 1 kmnearest: 5 min walk
Park & Ride1 within 2 kmnearest: 31 min walk
EV chargers3 within 1 kmnearest: 10 min walk

Green space, noise, air

18% of the area within 500 m — parks, forests, lawns

Nearest green area: right nearby · park «Pigalak» — 523 m

Noise: roads70+ dB · over the limit
Noise: tramsquiet (below 55 dB)
Noise: railwayquiet (below 55 dB)
Noise: airportquiet (below 55 dB)
Noise: industryquiet (below 55 dB)

Strategic noise map, LDWN (24 h). Limit for blocks of flats: 68 dB from roads, trams and railways (70 dB in a big city's centre zone), 60 dB from aircraft, 55 dB from industry. WHO recommends up to 53 dB from roads.

Loading air quality…

Risks and restrictions

Flood once in 10 yearsno
Flood once in 100 yearsno
Flood once in 500 yearsno
Flood if a levee breaksno
Road accidents in 3 years, 300 m146 · with injuries: 4
Paid parkingno

Flood zones — ISOK (Wody Polskie); 1 cell ≈ 7 m. Being in the Q1% zone affects insurance and mortgages.

What may be built nearby

Local zoning plan (MPZP)№XXIX/625/2011 Służewiec Przemysłowy w rej. ul. Cybernetyki cz. I · resolution
Land use within 150 m
MW/U/U-A zabudowa wielorodzinna z usługami
KDG droga główna · 23 m
KDD droga dojazdowa · 56 m
U/U-A tereny usług · 80 m
KDZ droga zbiorcza · 92 m
U-Th/U/UA usługi turystyki · 128 m
MW zabudowa wielorodzinna · 134 m
U-HA usługi handlu i administracji · 140 m

MW — blocks of flats, MN — houses, U — services, ZP — parks, KD — roads.

Sun

Calculating…

Sources: GTFS, OpenStreetMap, city GIS, ISOK, GIOŚ, RSPO, CKE, RAD-on, GUGiK. Source status

Sales, charts and filters (446 sales)

Area: Radius 500 m · 446 sales with filters applied

Market
Rooms
Area, m²
Floor
Period
Median, 12 mo.
18,683 zł/m²
105 sales
Difference from the city, 12 mo.
+15.2%
city: 16,212 zł/m²
Difference from the district
+1.6%
Mokotów: 18,390 zł/m²
Change over the year
-0.8%
prices within the same market (new builds with new builds)
Median price
955,000 zł
area 51.1 m²
All time
17,711 zł/m²
446 sales · primary market 1.1%
Company buyers
1.9%
share of sales in 12 mo.

Median price per m² by quarter

The band is the middle 50% of sales in the area. Quarters with fewer than 3 sales in the area are skipped. The last quarter is incomplete.

Distribution of price per m²

9,000–10,000 zł/m²: 5 sales10,000–11,000 zł/m²: 6 sales11,000–12,000 zł/m²: 16 sales12,000–13,000 zł/m²: 16 sales13,000–14,000 zł/m²: 30 sales14,000–15,000 zł/m²: 36 sales15,000–16,000 zł/m²: 36 sales16,000–17,000 zł/m²: 50 sales17,000–18,000 zł/m²: 44 sales18,000–19,000 zł/m²: 64 sales19,000–20,000 zł/m²: 54 sales20,000–21,000 zł/m²: 38 sales21,000–22,000 zł/m²: 25 sales22,000–23,000 zł/m²: 19 sales23,000–24,000 zł/m²: 1 sale24,000–25,000 zł/m²: 6 sales91113151719212325

area median 17,711 zł/m² city median 16,212 zł/m² · k zł/m², 446 sales

Resales

17 sales — flats sold twice. Median price change +13.4% over a median of 8.6 mo. between deeds.

The first price mostly comes from the developer's handover deed and was agreed 1–3 years earlier, so the difference shows growth over a longer period.

AddressAreaBoughtPriceSoldPriceDifference
ulica Cybernetyki 2B61.527.05.20251,250,00013.02.20261,000,000-20%
ulica Cybernetyki 7E79.906.09.20231,130,00007.01.20261,600,000+41.6%
ulica Cybernetyki 7G55.719.07.20241,148,00005.01.20261,040,000-9.4%
ulica Orzycka 1232.515.01.2024500,00016.10.2025545,000+9%
ulica Postępu 12B73.515.06.20231,275,00001.08.20251,400,000+9.8%
ulica Śniardwy 524.319.02.2025398,00001.07.2025550,000+38.2%
ulica Cybernetyki 2D8117.01.20251,200,00026.06.20251,722,000+43.5%
ulica Cybernetyki 2C65.831.08.20231,000,00018.06.20251,140,000+14%
ulica Cybernetyki 7H36.717.03.2023659,00031.10.2024670,000+1.7%
ulica Śniardwy 354.330.03.2023580,00015.10.2024959,000+65.3%
ulica Cybernetyki 7F55.615.04.2024979,90016.07.20241,139,000+16.2%
ulica Wiartel 837.201.09.2023460,00023.05.2024680,000+47.8%
ulica Tuchlińska 623.306.09.2023365,00031.01.2024397,300+8.8%
ulica Obrzeżna 244706.10.2023630,00005.01.2024697,000+10.6%
ulica Tuchlińska 236.911.08.2023455,00012.12.2023686,000+50.8%
ulica Tuchlińska 623.305.07.2023322,00006.09.2023365,000+13.4%
ulica Postępu 12B59.527.03.2023668,59423.06.2023668,5940%

Sales (446)

CSV
DateAddressFloorRoomsAreaPricezł/m²Market
19.05.2026ulica Cybernetyki 4A73731,330,00018,219resale
12.05.2026ulica Bokserska 54A9345.4955,00021,040resale
11.05.2026ulica Cybernetyki 3A7251.7965,00018,683resale
08.05.2026ulica Cybernetyki 7G5255.71,150,00020,650resale
08.05.2026ulica Obrzeżna 7A6240.8780,00019,122resale
06.05.2026ulica Śniardwy 88341.5620,00014,922resale
24.04.2026ulica Obrzeżna 1F6248.2965,00020,000resale
24.04.2026ulica Cybernetyki 2H3367.91,180,00017,384resale
24.04.2026ulica Wynalazek 24263.11,180,00018,689resale
23.04.2026ulica Cybernetyki 6A4237.8800,00021,181resale
16.04.2026ulica Cybernetyki 7C5377.81,234,00015,853resale
14.04.2026ulica Obrzeżna 1C4489.61,750,00019,525resale
14.04.2026ulica Cybernetyki 6A7356.51,080,00019,132resale
10.04.2026ulica Postępu 103260.6998,00016,458resale
02.04.2026ulica Bokserska 54A8132.9732,99022,300resale
01.04.2026ulica Bokserska 54B9353.21,150,00021,637resale
31.03.2026ulica Cybernetyki 22483.81,650,00019,701resale
31.03.2026ulica Cybernetyki 4A5229.9635,00021,252resale
31.03.2026ulica Wincentego Rzymowskiego 497337485,00013,101resale
27.03.2026ulica Bokserska 54B6366.71,327,50019,917resale
27.03.2026ulica Obrzeżna 32246.2950,00020,541resale
20.03.2026ulica Obrzeżna 5D——59.41,120,00018,868resale
19.03.2026ulica Cybernetyki 6B7241.2888,00021,543resale
17.03.2026ulica Obrzeżna 163341.3650,00015,723resale
13.03.2026ulica Cybernetyki 132267.61,225,00018,121resale
11.03.2026ulica Cybernetyki 7H4477.21,380,00017,864resale
09.03.2026ulica Obrzeżna 37240.3860,00021,335resale
25.02.2026ulica Cybernetyki 46369.11,350,00019,528resale
18.02.2026ulica Tuchlińska 42453.7760,00014,161resale
17.02.2026ulica Obrzeżna 12—347.7720,00015,091new
17.02.2026ulica Wincentego Rzymowskiego 492337550,00014,857resale
16.02.2026ulica Wynalazek 27252.8950,00017,975resale
16.02.2026ulica Postępu 12C6375.81,850,00024,419resale
13.02.2026ulica Cybernetyki 7E4380.51,564,80019,439resale
13.02.2026ulica Cybernetyki 2B5361.51,000,00016,265resale
12.02.2026ulica Cybernetyki 6B4479.61,535,00019,277resale
11.02.2026ulica Piotra Gruszczyńskiego 14A3343675,00015,698resale
05.02.2026ulica Cybernetyki 7E1244.6815,00018,274resale
05.02.2026ulica Śniardwy 68343.6589,00013,509resale
04.02.2026ulica Orzycka 141340480,00012,000resale
03.02.2026ulica Obrzeżna 36242830,00019,781resale
02.02.2026ulica Cybernetyki 6B6243.6950,00021,789resale
29.01.2026ulica Orzycka 166567.2935,00013,924resale
29.01.2026ulica Wincentego Rzymowskiego 4710339.6660,00016,650resale
27.01.2026ulica Cybernetyki 7C6279.71,420,00017,810resale
26.01.2026ulica Kolady 13336.5535,00014,678resale
16.01.2026ulica Obrzeżna 7A76165.61,598,5849,653resale
16.01.2026ulica Postępu 12E7251.51,110,00021,545resale
14.01.2026ulica Bokserska 54B7238839,00022,096resale
14.01.2026ulica Wiartel 88449.4730,00014,777resale
12.01.2026ulica Cybernetyki 4A2266.31,180,00017,793resale
09.01.2026ulica Wynalazek 26243.1825,00019,137resale
09.01.2026ulica Cybernetyki 6B6250.11,070,00021,370resale
08.01.2026ulica Cybernetyki 7G3251.1950,00018,584resale
07.01.2026ulica Cybernetyki 6B2244980,00022,293resale
07.01.2026ulica Cybernetyki 7E3479.91,600,00020,025resale
05.01.2026ulica Cybernetyki 7G2255.71,040,00018,665resale
23.12.2025ulica Cybernetyki 7F74100.31,780,00017,747resale
19.12.2025ulica Orzycka 166340.5700,00017,263resale
19.12.2025ulica Cybernetyki 4A24102.21,720,00016,830resale
17.12.2025ulica Cybernetyki 3C10359.91,220,00020,357resale
12.12.2025ulica Obrzeżna 7A10373.91,235,00016,712resale
11.12.2025ulica Obrzeżna 246336.9510,00013,821resale
09.12.2025ulica Cybernetyki 7G1132.3650,00020,130resale
05.12.2025ulica Bokserska 54A8234.2803,00023,466resale
04.12.2025ulica Cybernetyki 3C9237.6750,00019,963resale
28.11.2025ulica Bokserska 54A6362.71,319,21621,033resale
25.11.2025ulica Cybernetyki 7G3236.2720,00019,868resale
21.11.2025ulica Jadźwingów 162452.4880,00016,791resale
21.11.2025ulica Obrzeżna 7A3258.81,020,00017,350resale
21.11.2025ulica Obrzeżna 5B3348.6890,00018,305resale
19.11.2025ulica Wiartel 811337.2640,00017,204resale
19.11.2025ulica Bokserska 54B6237.9810,00021,383resale
17.11.2025ulica Bokserska 54B4242.1915,00021,713resale
12.11.2025ulica Postępu 1010245.2920,00020,345resale
12.11.2025ulica Cybernetyki 7C2377.81,330,00017,089resale
12.11.2025ulica Obrzeżna 1D6370.21,270,00018,099resale
07.11.2025ulica Wynalazek 25231.1400,00012,878resale
30.10.2025ulica Postępu 106482.61,775,00021,494resale
27.10.2025ulica Obrzeżna 5C34591,155,00019,583resale
16.10.2025ulica Orzycka 124132.5545,00016,769resale
10.10.2025ulica Cybernetyki 2A3230.8660,00021,408resale
09.10.2025ulica Śniardwy 66231.8520,00016,378resale
01.10.2025ulica Cybernetyki 7F1368.51,264,50018,460resale
26.09.2025ulica Bokserska 54B2242.1848,39420,142resale
26.09.2025ulica Obrzeżna 1D4244.2765,00017,304resale
24.09.2025ulica Obrzeżna 1D4355.21,065,00019,280resale
24.09.2025ulica Cybernetyki 7E5480.81,460,00018,069resale
23.09.2025ulica Bokserska 54B3242873,00020,771resale
16.09.2025ulica Cybernetyki 4A8371.71,300,00018,129resale
08.09.2025ulica Postępu 1033811,360,00016,786resale
05.09.2025ulica Cybernetyki 7D6237.1732,00019,715resale
05.09.2025ulica Bokserska 54A4234.2720,00021,040resale
05.09.2025ulica Cybernetyki 7H3274.71,240,00016,593resale
04.09.2025ulica Postępu 12B6359.41,320,00022,215resale
04.09.2025ulica Cybernetyki 4A2232670,00020,964resale
03.09.2025ulica Obrzeżna 7A8258.51,090,00018,617resale
02.09.2025ulica Tuchlińska 61447.6640,00013,440resale
29.08.2025ulica Postępu 102492.81,650,00017,778resale
25.08.2025ulica Cybernetyki 24236.7705,00019,226resale
22.08.2025ulica Obrzeżna 1D8370.21,390,00019,786resale
22.08.2025ulica Cybernetyki 7H6248.1976,00020,287resale
22.08.2025ulica Cybernetyki 7H1254.1920,00016,999resale
20.08.2025ulica Obrzeżna 1D10364.61,120,00017,343resale
18.08.2025ulica Postępu 104250.2990,00019,733resale
12.08.2025ulica Cybernetyki 7C6377.91,470,00018,870resale
08.08.2025ulica Obrzeżna 32254.51,100,00020,187resale
08.08.2025ulica Orzycka 16—340.5550,00013,564resale
05.08.2025ulica Orzycka 125234.1430,00012,603resale
05.08.2025ulica Cybernetyki 4A6241.3800,00019,375resale
01.08.2025ulica Postępu 12B4373.51,400,00019,053resale
01.08.2025ulica Śniardwy 8—232.4420,00012,963resale
29.07.2025ulica Śniardwy 62343.6610,00013,991resale
25.07.2025ulica Cybernetyki 63361.41,130,00018,392resale
15.07.2025ulica Wynalazek 29247.8970,00020,272resale
14.07.2025ulica Cybernetyki 67361.41,130,00018,392resale
11.07.2025ulica Cybernetyki 454731,355,00018,564resale
09.07.2025ulica Cybernetyki 7F3497.11,930,00019,876resale
01.07.2025ulica Śniardwy 54124.3550,00022,634resale
01.07.2025ulica Cybernetyki 7C43801,510,00018,880resale
01.07.2025ulica Orzycka 164340.5600,00014,797resale
26.06.2025ulica Cybernetyki 2D55811,722,00021,251resale
18.06.2025ulica Cybernetyki 663651,400,00021,532resale
18.06.2025ulica Obrzeżna 1F7368.41,415,00020,681resale
18.06.2025ulica Cybernetyki 2C3465.81,140,00017,338resale
17.06.2025ulica Cybernetyki 2B4469.51,300,00018,705resale
11.06.2025ulica Obrzeżna 143352.7700,00013,280resale
09.06.2025ulica Cybernetyki 23369.21,350,00019,509resale
09.06.2025ulica Cybernetyki 24369.21,350,00019,503resale
09.06.2025ulica Wincentego Rzymowskiego 478223.2462,50019,935resale
03.06.2025ulica Cybernetyki 7F4244.61,001,00022,444resale
02.06.2025ulica Obrzeżna 35273.21,200,00016,402resale
30.05.2025ulica Cybernetyki 7F3244.6919,90020,626resale
28.05.2025ulica Śniardwy 85242.2595,00014,116resale
27.05.2025ulica Cybernetyki 2B5361.51,250,00020,332resale
23.05.2025ulica Cybernetyki 4A7475.61,500,00019,844resale
16.05.2025ulica Cybernetyki 7H5477.71,505,00019,372resale
12.05.2025ulica Obrzeżna 1F55106.61,940,00018,202resale
28.04.2025ulica Obrzeżna 1C4373.31,360,00018,559resale
25.04.2025ulica Śniardwy 54224.4422,00017,295resale
25.04.2025ulica Obrzeżna 31365.11,210,00018,593resale
23.04.2025ulica Cybernetyki 28253.31,312,00024,602resale
17.04.2025ulica Cybernetyki 7G7255.8900,00016,135resale
16.04.2025ulica Cybernetyki 133392.51,450,00015,677resale
14.04.2025ulica Wynalazek 25249.5900,00018,193resale
03.04.2025ulica Cybernetyki 152242770,00018,312resale
27.03.2025ulica Postępu 1034851,500,00017,639resale
27.03.2025ulica Wincentego Rzymowskiego 4711456.1800,00014,258resale
26.03.2025ulica Wynalazek 24463.41,155,00018,209resale
26.03.2025ulica Obrzeżna 5E6235.6740,00020,781resale
26.03.2025ulica Postępu 12B2241.4950,00022,958resale
21.03.2025ulica Obrzeżna 1D1364.81,050,00016,214resale
19.03.2025ulica Cybernetyki 4A7363.11,100,00017,438resale
12.03.2025ulica Jadźwingów 172355.7690,00012,397resale
07.03.2025ulica Cybernetyki 7H6236.8730,00019,842resale
03.03.2025ulica Cybernetyki 7F5362.31,130,00018,138resale
03.03.2025ulica Cybernetyki 134252.8845,00015,998resale
25.02.2025ulica Cybernetyki 7C7376.11,379,90018,130resale
21.02.2025ulica Cybernetyki 2C2349.8900,00018,069resale
21.02.2025ulica Postępu 1011369.71,300,00018,665resale
19.02.2025ulica Śniardwy 54124.3398,00016,379resale
14.02.2025ulica Jadźwingów 173239.5533,00013,487resale
12.02.2025ulica Bogunki 51458.3825,00014,153resale
12.02.2025ulica Postępu 1010360.71,170,00019,281resale
31.01.2025ulica Cybernetyki 7F5237.9750,00019,789resale
29.01.2025ulica Obrzeżna 7A13247.2990,00020,961resale
27.01.2025ulica Cybernetyki 47246.5900,00019,338resale
27.01.2025ulica Obrzeżna 36247.6897,00018,845resale
24.01.2025ulica Cybernetyki 3C6244.8800,00017,873resale
24.01.2025ulica Wiartel 811337.2570,00015,323resale
21.01.2025ulica Obrzeżna 1C5247.9860,00017,943resale
17.01.2025ulica Cybernetyki 2D55811,200,00014,809resale
15.01.2025ulica Cybernetyki 4A4132770,00024,055resale
10.01.2025ulica Bogunki 51234.8450,00012,935resale
07.01.2025ulica Cybernetyki 4A2471.91,200,00016,692resale
03.01.2025ulica Obrzeżna 5A8359.91,080,00018,027resale
12.12.2024ulica Postępu 12B8377.31,854,24024,000resale
11.12.2024ulica Śniardwy 86342.2640,00015,184resale
04.12.2024ulica Cybernetyki 424731,330,00018,224resale
03.12.2024ulica Bogunki 31346.2665,00014,403resale
29.11.2024ulica Obrzeżna 34357.31,150,00020,077resale
28.11.2024ulica Obrzeżna 18H15107.52,020,00018,787resale
28.11.2024ulica Cybernetyki 42243.2930,00021,523resale
25.11.2024ulica Cybernetyki 63246.51,020,00021,912resale
21.11.2024ulica Jadźwingów 207341655,00015,976resale
20.11.2024ulica Bogunki 32346.2638,50013,820resale
14.11.2024ulica Cybernetyki 2C3349.8950,00019,092resale
07.11.2024ulica Cybernetyki 7F2476.91,520,00019,766resale
05.11.2024ulica Postępu 12C3249.11,060,00021,575resale
04.11.2024ulica Obrzeżna 1C7370.81,450,00020,466resale
31.10.2024ulica Cybernetyki 7H2236.7670,00018,241resale
28.10.2024ulica Cybernetyki 2A7238850,00022,363resale
25.10.2024ulica Obrzeżna 123348.7670,00013,769resale
25.10.2024ulica Cybernetyki 2C6250.1960,00019,146resale
24.10.2024ulica Cybernetyki 7C3—76.31,529,00020,029resale
23.10.2024ulica Cybernetyki 7H1—98.71,860,00018,843resale
18.10.2024ulica Obrzeżna 5F1238.8794,00020,480resale
18.10.2024ulica Cybernetyki 23236.9770,00020,879resale
15.10.2024ulica Cybernetyki 7H6243.7920,00021,077resale
15.10.2024ulica Śniardwy 32554.3959,00017,661resale
09.10.2024ulica Obrzeżna 5C2474.31,380,00018,578resale
04.10.2024ulica Bogunki 52338.8702,00018,097resale
02.10.2024ulica Cybernetyki 2C10241.6853,00020,485resale
30.09.2024ulica Obrzeżna 5A2238850,00022,363resale
27.09.2024ulica Obrzeżna 7A6250885,00017,704resale
25.09.2024ulica Cybernetyki 7D3274.21,440,00019,410resale
20.09.2024ulica Obrzeżna 7A3358.21,142,00019,612resale
20.09.2024ulica Cybernetyki 64230.4730,00024,053resale
18.09.2024ulica Cybernetyki 4A63671,270,00018,961resale
18.09.2024ulica Cybernetyki 2B3252.81,005,00019,016resale
13.09.2024ulica Wynalazek 25239.3800,00020,351resale
13.09.2024ulica Cybernetyki 42365.21,330,00020,389resale
12.09.2024ulica Cybernetyki 4A4237790,00021,369resale
10.09.2024ulica Jadźwingów 151350.2800,00015,936resale
06.09.2024ulica Jadźwingów 206341.7575,00013,789resale
04.09.2024ulica Cybernetyki 47236.3810,00022,333resale
29.08.2024ulica Obrzeżna 7A3242.6825,00019,371resale
28.08.2024ulica Cybernetyki 2F5367.81,400,00020,652resale
20.08.2024ulica Cybernetyki 7E1480.21,650,00020,574resale
20.08.2024ulica Obrzeżna 33385.91,820,00021,180resale
20.08.2024ulica Tuchlińska 23336.9535,00014,499resale
12.08.2024ulica Cybernetyki 7C3—97.71,680,00017,190resale
07.08.2024ulica Obrzeżna 5C—360.41,120,00018,537resale
31.07.2024ulica Obrzeżna 34233.6720,00021,403resale
30.07.2024ulica Obrzeżna 245336.7610,00016,612resale
26.07.2024ulica Obrzeżna 1F9240.4793,00019,638resale
25.07.2024ulica Cybernetyki 4A6382.11,510,00018,394resale
25.07.2024ulica Obrzeżna 7A3384.21,230,00014,617resale
23.07.2024ulica Cybernetyki 3C13337.6830,00022,086resale
20.07.2024ulica Cybernetyki 3C13259.61,100,00018,444resale
19.07.2024ulica Obrzeżna 7A2236.2627,00017,325resale
19.07.2024ulica Cybernetyki 7G2255.71,148,00020,603resale
16.07.2024ulica Cybernetyki 7F7255.61,139,00020,486resale
16.07.2024ulica Cybernetyki 7G25102.11,705,00016,701resale
05.07.2024ulica Obrzeżna 7A2247.1940,00019,941resale
28.06.2024ulica Cybernetyki 4A6238.4804,50020,934resale
13.06.2024ulica Orzycka 124346.7630,00013,490resale
10.06.2024ulica Obrzeżna 5F11349.3840,00017,049resale
10.06.2024ulica Obrzeżna 141352.6700,00013,311resale
04.06.2024ulica Śniardwy 53554.3760,00013,996resale
28.05.2024ulica Cybernetyki 6B1243.6980,00022,456resale
28.05.2024ulica Obrzeżna 1D7366.81,260,00018,871resale
28.05.2024ulica Cybernetyki 6A2241.5935,00022,508resale
27.05.2024ulica Cybernetyki 4A5354.81,150,00020,989resale
23.05.2024ulica Wiartel 82337.2680,00018,280resale
20.05.2024ulica Cybernetyki 7C6497.91,720,00017,569resale
17.05.2024ulica Wynalazek 26363.41,075,00016,959resale
16.05.2024ulica Śniardwy 65230.5480,00015,764resale
13.05.2024ulica Cybernetyki 7G2237.8756,00019,989resale
13.05.2024ulica Wynalazek 23464.81,070,00016,500resale
09.05.2024ulica Obrzeżna 1F5370.81,350,00019,073resale
25.04.2024ulica Cybernetyki 49348.91,280,00026,160resale
25.04.2024ulica Cybernetyki 7H12481,000,00020,820resale
25.04.2024ulica Cybernetyki 4A3487.91,300,00014,781resale
18.04.2024ulica Orzycka 168340.5608,00014,994resale
18.04.2024ulica Postępu 108492.91,540,00016,581resale
16.04.2024ulica Postępu 1012260.71,202,00019,799resale
15.04.2024ulica Tuchlińska 25223.3439,00018,841resale
15.04.2024ulica Cybernetyki 7F7255.6979,90017,624resale
12.04.2024ulica Tuchlińska 63223.3430,00018,447resale
11.04.2024ulica Cybernetyki 7E54100.31,650,00016,451resale
03.04.2024ulica Cybernetyki 2A2474.71,150,00015,399resale
21.03.2024ulica Cybernetyki 7C3275.51,329,00017,603resale
21.03.2024ulica Obrzeżna 33246.5860,00018,515resale
15.03.2024ulica Cybernetyki 7F2363.31,145,00018,088resale
15.03.2024ulica Postępu 106235.5470,00013,251resale
14.03.2024ulica Obrzeżna 37240.2890,00022,123resale
07.03.2024ulica Cybernetyki 4A4367.21,380,00020,530resale
05.03.2024ulica Obrzeżna 7A2240.6910,00022,397resale
27.02.2024ulica Postępu 12B6—72.51,230,00016,968resale
26.02.2024ulica Postępu 12B73771,700,00022,078resale
22.02.2024ulica Cybernetyki 2B9230.6680,00022,237resale
22.02.2024ulica Cybernetyki 44243.2850,00019,680resale
21.02.2024ulica Śniardwy 64—32.5495,00015,254resale
19.02.2024ulica Cybernetyki 2A9230.7690,00022,461resale
16.02.2024ulica Postępu 12B9—54.5615,00011,295resale
15.02.2024ulica Orzycka 167452550,00010,571resale
09.02.2024ulica Obrzeżna 1D—357.5790,00013,730resale
09.02.2024ulica Cybernetyki 7H6496.71,730,00017,887resale
09.02.2024ulica Obrzeżna 37398.41,790,00018,198resale
08.02.2024ulica Cybernetyki 137392.61,300,00014,043resale
31.01.2024ulica Tuchlińska 61223.3397,30017,044resale
30.01.2024ulica Cybernetyki 3C85103.52,275,00021,983resale
26.01.2024ulica Orzycka 124232.5510,00015,692resale
24.01.2024ulica Cybernetyki 35240.2799,51019,898resale
19.01.2024ulica Cybernetyki 7H2238710,00018,699resale
16.01.2024ulica Cybernetyki 7E24100.21,530,00015,269resale
15.01.2024ulica Orzycka 124132.5500,00015,385resale
11.01.2024ulica Cybernetyki 44235.9725,00020,178resale
10.01.2024ulica Obrzeżna 1D1355.3750,00013,570resale
09.01.2024ulica Cybernetyki 4A4359.41,180,00019,862resale
09.01.2024ulica Śniardwy 62132.5535,00016,487resale
09.01.2024ulica Obrzeżna 36260.21,065,00017,703resale
08.01.2024ulica Wynalazek 25249.6950,00019,165resale
05.01.2024ulica Obrzeżna 245447697,00014,830resale
05.01.2024ulica Obrzeżna 36259.41,090,00018,344resale
04.01.2024ulica Postępu 12E2355.31,160,00020,992resale
04.01.2024ulica Wincentego Rzymowskiego 452341.5695,00016,763resale
29.12.2023ulica Obrzeżna 5A8359.81,090,00018,230resale
29.12.2023ulica Jadźwingów 202448.2570,00011,826resale

Showing 300 most recent. All 446 — in the CSV.

Data: Rejestr Cen Nieruchomości (GUGiK), PRG addresses, district boundaries from the city's open data or OpenStreetMap. Sales up to 14.08.2026; entries reach the register about 1.5 months after the sale on average, so the last ~3 months are incomplete. The price is the gross price from the notarial deed; only sales of whole flats on the open market are included.